Arif Saefullah, ST.

Arif Saefullah, ST.

Followers of Arif Saefullah, ST.345 followers
location of Arif Saefullah, ST.Banten, Indonesia

Connect with Arif Saefullah, ST. to Send Message

Connect

Connect with Arif Saefullah, ST. to Send Message

Connect
  • Timeline

  • About me

    Chief Quality Engineer at PT. ABB Sakti Industri

  • Education

    • Universitas Mercu Buana

      2020 - 2021
      Electrical and Electronics Engineering
  • Experience

    • PT. ABB Sakti Industri

      Jun 2015 - now

      The QA/QC Engineer shall ensure that all project site activities and roles that may influence quality are operating at a level that meets project requirement through-out the duration of the construction work until such time the project is finally accepted by the client.Responsibility :a) Identify and assign qualified personnel to perform quality function and/ or roles.b) Shall responsible of putting into place a competency training for all relevant works in accordance with the project requirements and implementing a policy or guidelines that a certain task shall only be performed by a qualified personnel.c) Review and approve the Project Quality Plan (PQP), Project Procedures (PP), and Method Statements (MS).d) Insure the proper implementation of the PQP, PP, and MS.e) Ensure that the site organization is operating in accordance with the PQP.f) Ensure that the proper document control procedures are properly implemented and maintained.g) Shall put into place planning and resources for all necessary activities to be carried out to define and execute a systematic and structured test program that results in both a “first time right” start-up and a plant performance corresponding with expectation.h) Shall prepare a comprehensive and structured Inspection Test Plan (ITP) for both, Electrical and Instruments. He shall ensure the adequacy of the Testing Plan, especially with respect to critical equipment and complex systems. i) Ensures that the Inspection Materials / Test Equipment (IMTE) procedures are properly implemented and maintained. j) Attend coordination meeting with clients, owner’s representatives, subcontractors and/ or suppliers as needed.k) Ensure all appropriate staff attends training seminars.l) Keep and maintain register of all staff attending training.m) Internal audits.n) Review all issues with Electrical Engineer. Lihat lebih sedikit

      • Chief QC Engineer

        Jan 2017 - now
      • QC Engineer

        Nov 2013 - now
      • Testing Engineer

        Nov 2010 - now
      • Site Engineer

        Jun 2015 - Jan 2016
  • Licenses & Certifications

    • Teknisi K3 Listrik

      Jan 2016
    • Person In Charge of Works ( PICW )

      PT. ABB Sakti Industri
      Jan 2016
    • Certificate of HD4/VD4 CB Training

      PT. ABB Sakti Industri
      Jan 2016