    Shift Charge Operation Engineer at 6 october combined cycle power plant

  • Education

    • Cairo University

      2004 - 2009
      Bachelor of Engineering Electrical Power & Machines Department

      • Degree : Good• Graduation Project : A Simulation Design to High Dam Power Station• Graduation Project Degree : Very Good

  • Experience

    • Cairo Electricity Production Company

      Aug 2010 - now

      • Lead a team for the safe and reliable operation of a combined cycle power plant under normal an emergency situation.• Commissioning and start up and Operate for Ansaldo Gas Turbine AE94.2 (4*150 M.W.),Ac boilers, Ansaldo Steam turbine MT20 (350 M.W.), Air cooling condenser system (ACC), Instrument and Service air compressors and Air Dryer.• Closed Cooling Cycle Water System using Fin Van Cooler.• Mechanical And Electrical equipment Isolation, earthling, lock out, tag out • Lube Oil System Flushing and Start up.• Hydraulic oil System Flushing and Start up, Natural Gas System lines Hydro Test.• Flashing & startup, Hydro Test & Flashing for Firefighting Water System and CO2 System. • Firefighting Water System Jockey Pump.• 6kv electrical Pump and Diesel Pump and Deluge Valves.• Firefighting CO2 System.• Air Intake pulse System. • Lifting Pump & Turning Gear.• First Firing with Natural Gas, Water Wash of G.T. Compressor Cleaning System. • Operate the System of Plant from DCS using ABB Symphony S+ Operations V1.0. • High voltage 220KV GIS system & Medium Voltage Switchgear 6.3kV & Low Voltage. 400V Switching, Isolation, earthing, Lock out, tag out. Show less • Commissioning and start up and Operate for Ansaldo Gas Turbine AE94.2 (4*150 M.W.), Instrument and Service air compressors and Air Dryer.• Closed Cooling Cycle Water System using Fin Van Cooler.• Mechanical and Electrical equipment Isolation, earthling, lock out, tag out • Lube Oil System Flushing and Start up.• Hydraulic oil System Flushing and Start up, Natural Gas System lines Hydro Test.• Flashing & startup, Hydro Test & Flashing for Firefighting Water System and CO2 System. • Firefighting Water System Jockey Pump.• 6kv electrical Pump and Diesel Pump and Deluge Valves.• Firefighting CO2 System.• Air Intake pulse System. • Lifting Pump & Turning Gear.• First Firing with Natural Gas, Water Wash of G.T. Compressor Cleaning System. • Operate the System of Plant from DCS using ABB Symphony S+ Operations V1.0. • High voltage 220KV GIS system & Medium Voltage Switchgear 6.3kV & Low Voltage. 400V Switching, Isolation, earthing, Lock out, tag out. Show less • Lead a team for the safe and reliable operation of a combined cycle power plant under normal an emergency situation.•Commissioning and start up and Operate for Ansaldo Gas Turbine AE94.2 (4*150 M.W.),Ac boilers, Ansaldo Steam turbine MT20 (350 M.W.), Air cooling condenser system (ACC), Instrument and Service air compressors and Air Dryer.• Closed Cooling Cycle Water System using Fin Van Cooler.• Mechanical And Electrical equipment Isolation, earthling, lock out, tag out • Lube Oil System Flushing and Start up.• Hydraulic oil System Flushing and Start up, Natural Gas System lines Hydro Test.• Flashing & startup, Hydro Test & Flashing for Firefighting Water System and CO2 System. • Firefighting Water System Jockey Pump.• 6kv electrical Pump and Diesel Pump and Deluge Valves.• Firefighting CO2 System.• Air Intake pulse System. • Lifting Pump & Turning Gear.• First Firing with Natural Gas, Water Wash of G.T. Compressor Cleaning System. • Operate the System of Plant from DCS using ABB Symphony S+ Operations V1.0. • High voltage 220KV GIS system & Medium Voltage Switchgear 6.3kV & Low Voltage. 400V Switching, Isolation, earthing, Lock out, tag out. Show less

      • Shift Charge Engineer at 6th October Power Plant

        Jan 2019 - now
      • Shift Charge Operation Engineer Ansaldo Gas Turbine AE94.2 (4*150MW)

        Jul 2014 - Jan 2019
      • Senior Operation Engineer

        Jan 2012 - Jul 2014
      • Project Engineer

        May 2011 - Jan 2012
      • Junior Operation Engineer

        Aug 2010 - May 2011