Siamak Mohmedi

Siamak Mohmedi

Site Supervisor

Followers of Siamak Mohmedi487 followers
location of Siamak MohmediUnited Kingdom

Connect with Siamak Mohmedi to Send Message

Connect

Connect with Siamak Mohmedi to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer

  • Education

    • Rajaee University

      -
      Associate's degree Bridge Construction
    • Fatholmobin Secondary School

      -
      High School Diploma Construction
    • Islamic Azad University

      1996 - 2000
      Bachelor of Science - BS Civil Engineering
  • Experience

    • Parspeyab Consulting Engineers

      Mar 1995 - Jan 1996
      Site Supervisor

      (Rofayeh Town, Sewerage & Storm water Collecting Network)Inspecting of all activities from first to last in lift stations as followings: Excavation, form-work bars installation, Concrete casting and etc.Stormwater and sewerage after collecting by a wide network of pipes andmanholes directed to three lift stations for drive and discharge in River.

    • Vand Chemi Co.

      Mar 1996 - Dec 1999
      Head of Concrete Training Center

      Planning and manage of continuously professional coursesmeetings and seminars about concrete technology in elementary andadvanced level according to ACI and ASTM standards for students andengineers in training center, jobsites and universities.

    • American Concrete Institute (Iran chapter)

      Jan 2000 - Jan 2005
      Board Member

      ACI - Iran Chapter as one of the Excellent ACI Chapters has provided a diversity of programs for promoting the engineered, students and the other those are working in construction industry.The programs are as following:  Monthly Meetings professional course and workshops Concrete competitions for students Annual Convention

    • Vand Shotcrete Construction Co.

      May 2000 - Sept 2000
      Board member & Site manager

      (Repairing of Preheater Tower, Karoon Cement Factory)Managing the site activities as following: Remove spoiled concrete till behind the bars, Preparing of under layer surface , bars coating using of wet mix shotcrete finishing

    • Vand Chemi Co.

      Jul 2000 - Sept 2000
      Site Engineer

      (Izad Khast Dam, Repairing of Bottom outlet gallery)In this case, a part of bottom outlet gallery (concrete structureand waterstop) had been damaged and reservoir water was leakingextensively into the channel. This issue solved by : Preparing of under layer surface Installing drainage for water diverting Using wet mix Shotcrete

    • Vand Shotcrete Construction Co.

      Apr 2002 - Jan 2003
      Board member & Project manager

      (Tembi Resort Dam Phase 1)Managing and coordinating activities in this studding phase included the followings: Geotechnical, Hydrology Surveying Structural design

    • Vand Shotcrete Construction Co.

      Aug 2003 - Feb 2006

      (West of Ahwaz sewerage Refinery Repaifing)Managing the site for concrete removing, preparing under layer surface, bars cleaning or replacing, bars coating and concrete placing or using of wet mix shotcrete for repair.This project was included reservoirs and channels which needed to repair and water proofing with different material like polymers, fiber, silikafume, coatings (epoxy & bitumen) water reducer and water proofing admixtures, etc. This project has been financially supported by World Bank. Show less

      • Board member & Site manager

        Feb 2005 - Feb 2006
      • Board member & Site manager

        Aug 2003 - Jan 2005
    • GMT consortium

      Nov 2006 - Mar 2009
      Chief of Material Engineer

      Managing the concrete, including preparing concrete MIX Design, supply, quality control, delivery to the site and arrangement with concern department.From August 2007, I promoted to Precast Yard Manager for planning and arrangement to produce the projects requirements like Manholes, Street lighting Foundations, Gully Pots and Rings in different type.From Jan, 2008 also I promoted to chief of material engineer for planing and arranging for material and works quality control.These controls were included taking sample from fresh asphalt and core from asphalt layers, fresh concrete and soil mechanical tests for road layers according to British standards. Show less

    • Boland Tabagheh

      Sept 2009 - Jan 2014

      This access road connected the Dam and power plant construction site to the one of the main country’s freeway.This100 km road contracted by 4 contractors in 5 years.One tunel,5 large bridges, a lot of pipe and concrete culverts and a hugeamount of excavation done in this mountainous area. This access road connected the Dam and power plant construction site to the one of the main country’s freeway.This100 km road contracted by 4 contractors in 5 years.One tunel,5 large bridges, a lot of pipe and concrete culverts and a hugeamount of excavation done in this mountainous area.

      • Head of technical office and site manager

        Jan 2010 - Jan 2014
      • Head of technical office

        Sept 2009 - Mar 2010
    • Global Construction Online (Iran)

      Mar 2017 - Mar 2017
      Chief Executive Officer

      Managing and organizing main activities includes:a) GCO Engineering Servicespreparing of financial and technical claims for contractors who were active on road construction projects. b) Certification Programmes

    • Global Construction Online

      Jan 2019 - now
      Director
  • Licenses & Certifications

    • ACI Concrete field testing technician Grade 1 Certification

      American construction institute (ACI)- Iran chapter
      Jan 1997
    • Certified Strength and Conditioning Specialist (CSCS)

      CSCS
      Jan 2018
    • Bovis Land Lease license (UAE)

      Bovis Land Lease
      Jan 2007
  • Honors & Awards

    • Awarded to Siamak Mohmedi
      First place In ACI High strength Concrete Competition American Construction Institue (ACI) - Iran Chapter 1997