
Siamak Mohmedi
Site Supervisor

Connect with Siamak Mohmedi to Send Message
Connect
Connect with Siamak Mohmedi to Send Message
ConnectTimeline
About me
Civil Engineer
Education

Rajaee University
-Associate's degree Bridge Construction
Fatholmobin Secondary School
-High School Diploma Construction
Islamic Azad University
1996 - 2000Bachelor of Science - BS Civil Engineering
Experience

Parspeyab Consulting Engineers
Mar 1995 - Jan 1996Site Supervisor(Rofayeh Town, Sewerage & Storm water Collecting Network)Inspecting of all activities from first to last in lift stations as followings: Excavation, form-work bars installation, Concrete casting and etc.Stormwater and sewerage after collecting by a wide network of pipes andmanholes directed to three lift stations for drive and discharge in River.

Vand Chemi Co.
Mar 1996 - Dec 1999Head of Concrete Training CenterPlanning and manage of continuously professional coursesmeetings and seminars about concrete technology in elementary andadvanced level according to ACI and ASTM standards for students andengineers in training center, jobsites and universities.

American Concrete Institute (Iran chapter)
Jan 2000 - Jan 2005Board MemberACI - Iran Chapter as one of the Excellent ACI Chapters has provided a diversity of programs for promoting the engineered, students and the other those are working in construction industry.The programs are as following: Monthly Meetings professional course and workshops Concrete competitions for students Annual Convention

Vand Shotcrete Construction Co.
May 2000 - Sept 2000Board member & Site manager(Repairing of Preheater Tower, Karoon Cement Factory)Managing the site activities as following: Remove spoiled concrete till behind the bars, Preparing of under layer surface , bars coating using of wet mix shotcrete finishing

Vand Chemi Co.
Jul 2000 - Sept 2000Site Engineer(Izad Khast Dam, Repairing of Bottom outlet gallery)In this case, a part of bottom outlet gallery (concrete structureand waterstop) had been damaged and reservoir water was leakingextensively into the channel. This issue solved by : Preparing of under layer surface Installing drainage for water diverting Using wet mix Shotcrete

Vand Shotcrete Construction Co.
Apr 2002 - Jan 2003Board member & Project manager(Tembi Resort Dam Phase 1)Managing and coordinating activities in this studding phase included the followings: Geotechnical, Hydrology Surveying Structural design

Vand Shotcrete Construction Co.
Aug 2003 - Feb 2006(West of Ahwaz sewerage Refinery Repaifing)Managing the site for concrete removing, preparing under layer surface, bars cleaning or replacing, bars coating and concrete placing or using of wet mix shotcrete for repair.This project was included reservoirs and channels which needed to repair and water proofing with different material like polymers, fiber, silikafume, coatings (epoxy & bitumen) water reducer and water proofing admixtures, etc. This project has been financially supported by World Bank. Show less
Board member & Site manager
Feb 2005 - Feb 2006Board member & Site manager
Aug 2003 - Jan 2005

GMT consortium
Nov 2006 - Mar 2009Chief of Material EngineerManaging the concrete, including preparing concrete MIX Design, supply, quality control, delivery to the site and arrangement with concern department.From August 2007, I promoted to Precast Yard Manager for planning and arrangement to produce the projects requirements like Manholes, Street lighting Foundations, Gully Pots and Rings in different type.From Jan, 2008 also I promoted to chief of material engineer for planing and arranging for material and works quality control.These controls were included taking sample from fresh asphalt and core from asphalt layers, fresh concrete and soil mechanical tests for road layers according to British standards. Show less

Boland Tabagheh
Sept 2009 - Jan 2014This access road connected the Dam and power plant construction site to the one of the main country’s freeway.This100 km road contracted by 4 contractors in 5 years.One tunel,5 large bridges, a lot of pipe and concrete culverts and a hugeamount of excavation done in this mountainous area. This access road connected the Dam and power plant construction site to the one of the main country’s freeway.This100 km road contracted by 4 contractors in 5 years.One tunel,5 large bridges, a lot of pipe and concrete culverts and a hugeamount of excavation done in this mountainous area.
Head of technical office and site manager
Jan 2010 - Jan 2014Head of technical office
Sept 2009 - Mar 2010

Global Construction Online (Iran)
Mar 2017 - Mar 2017Chief Executive OfficerManaging and organizing main activities includes:a) GCO Engineering Servicespreparing of financial and technical claims for contractors who were active on road construction projects. b) Certification Programmes

Global Construction Online
Jan 2019 - nowDirector
Licenses & Certifications

ACI Concrete field testing technician Grade 1 Certification
American construction institute (ACI)- Iran chapterJan 1997
Certified Strength and Conditioning Specialist (CSCS)
CSCSJan 2018
Bovis Land Lease license (UAE)
Bovis Land LeaseJan 2007
Honors & Awards
- Awarded to Siamak MohmediFirst place In ACI High strength Concrete Competition American Construction Institue (ACI) - Iran Chapter 1997
Languages
- pePersian
- enEnglish
Recommendations

Sharon godwin
Discharge Coordinator at Northeast Florida State HospitalNortheast Florida State Hospital
Filipe figuerôa
Analista | Controladoria | Contabilidade | Tesouraria | WPP | Financeiro | Cash Flow | Câmbio |São Paulo, São Paulo, Brazil
Kaushiki agrawal
Data Engineer | Data Warehousing | Data Engineering | Snowflake| AWS Certified | SQL| Data Science E...Oakville, Ontario, Canada
Jennyfer marti
Social Media ManagerSantiago, Santiago Metropolitan Region, Chile
Ky hascall
Former Band Director at Park Hill Public SchoolsKansas City, Missouri, United States
Jean marcel abozan
Oil & Gas Engineer | Senior Production Operations (Team leader, Central Control Room) | Offshore Pro...Abidjan, Côte d'Ivoire
Lauren cathcart
Team Lead, Quality AssuranceBurlington, Ontario, Canada.webp)
Courtney larosa (acito)
Relationship Manager at Bloomberg LP | Building Strong Corporate RelationshipsNew York, New York, United States
Jyothis mathew
Doha, Qatar
Raksha nimbaragi
B.ComPune/Pimpri-Chinchwad Area
Paul njeni mabalane
Part Time Lecturer at Tshwane University of Technology l Whatsap numbers: 0671375450 l BRICS Young S...Brits, North-West, South Africa_Weng.webp)
Qifan (ray) weng
Manager, Trader at Bayin Resources Co., Ltd.Xuhui District, Shanghai, China
Jim kerr
Senior Leader | Information Technology | Project and Operations ManagementWinnipeg, Manitoba, Canada
Keith xia
Chief Risk OfficerShanghai, China
Dariusz sieteski
PhD in technical sciencesKatowice, Śląskie, Poland
María jesús i.
Coordinadora Macrocomunal Delegación Presidencial RMÁrea metropolitana de Santiago
Anand paswan
CA Final Student with Expertise in Finance, Accounting, and Tax | Driven to Deliver Excellence in Fi...Kolkata, West Bengal, India
Ashish singh
Upcoming Physical Design Application Intern @ Siemens EDA | NIT Warangal | Pursuing M.Tech (EI & Emb...Varanasi, Uttar Pradesh, India
Troy hoyt
Director of organizationGreater Boston
Cindy mackenzie bpr, med
Senior Communications AdvisorGreater Halifax Metropolitan Area
...