YOGESH KUMAR DARJEE

YOGESH KUMAR DARJEE

Followers of YOGESH KUMAR DARJEE4000 followers
location of YOGESH KUMAR DARJEEJharsuguda, Odisha, India

Connect with YOGESH KUMAR DARJEE to Send Message

Connect

Connect with YOGESH KUMAR DARJEE to Send Message

Connect
  • Timeline

  • Skills

    Power plants
    Plant
    Construction
    Electricians
    Electric power
    Epc
    Commissioning
    Power generation
    Project engineering
    Electricity
    Transformer
    Power systems
    Petrochemical
    Gas
    Instrumentation
    Testing
    Plc
    Project planning
    Inspection
    Electrical engineering
    Switchgear
    Factory
    Engineering
    Programmable logic controller
  • About me

    Dear Sir, Myself Yogesh Kumar Darjee working in the field of Electrical Engineering for the past 14 years. Presently I am working as an Asst. Project Manager (TRI-DMS Project) M/s Techno-fab Engineering Ltd. under Power Grid Corporation India at NorthTripura Udaipur . I have experience in technical departments for Project Management, Project Planning, and Engg. Co-ordination with Consultants & Customer, Erection & Commissioning, Operation & Maintenance Expediting & Co- ordination with Various Vendors for Project Material, in the Project related activities Thermal Power Plants and DMS Project. I look forward to hearing from you. Yours faithfully Yogesh Kumar Darjee yogesh.darjee@rediffmail.com 7898999179 / 9437349666

  • Education

    • Institute of Integrate Management & Engineering

      -
      Bachelor's degree Electrical and Electronics Engineering 70%
    • Town High School , JHARSUGUDA

      -

      Activities and Societies: NCC group Leader

    • Rajasthan Vidyapeeth University

      -
      Diploma In Electrical Electrical and Electronics Engineering
  • Experience

    • SEPCOIII Shandong Electric Power Construction Corp.

      Apr 2007 - Dec 2010

      Designation : Engineer. Electrical April-2008 to Dec 2010 Company : SEPCO-3, 9x135MW CPP Project EPC Base, at Vedanta Aluminums Ltd, JSG SEPCO is an EPC contract company presently working under Vedanta Aluminum Limited. The company was belonging from CHINA govt. to capitalize on the emerging opportunities on the Indian power sector and focus on erection procurement, construction, Operation & Maintenance of power projects .It has current interests on various power plants. Managing the erection, testing & commissioning /operation / maintenance / troubleshooting. Operation and maintenance of Generation Transformer, Unit auxiliary Transformer, Station Transformer, Service Transformer and ESP Rectifier transformer Erection, Commissioning & Maintenance of HT and LT panels and Motors of BTG area Battery bank installation and commissioning with capacity test of valve-regulated lead-acid battery and Liquid Metal acid type battery (1900AH, 900AH, 500AH) make- Hoppecke Erection, testing, Commissioning & maintenance of UPS System up to 2X100 KVA Working as a Service Engineer, carrying out Trouble Shooting, Reduction of Breakdowns, Maximum Availability of Equipment, and Condition Based Preventive Maintenance, Equipment Behavioral Analysis & Suggestion of Improvements, Fulfillment of All Safety Measures. Planning and implementing the preventive & predictive maintenance schedules for reducing the overall reliability and safety of plant equipments & machinery Erection, Testing , commissioning & maintenance of electric overhead travelling crane (EOT) up to 3- 150 ton. Erection, testing, Commissioning & maintenance of ESP transformer, heaters Show less PROJECT SITE ENGINEER SEPCO-3, 9x135MW CPP Project EPC Base, At Vedanta Aluminium Ltd, JSG Since April 2008 to Dec 2010 SEPCO Electric power Construction Corporation has its own identity and reputation in making of power plant in all over the world, this company came in to town under take the electric power construction work of Vedanta Company in constructing 9 units with 135MW power plant• Fabrications, Erection, Testing and Commissioning of HT and LT panels and Motors of BTG areas & MPH Site..• Erection & Commissioning of Generation Transformer, Unit auxiliary Transformer, Station Transformer, Service Transformer and ESP Rectifier transformer.• Erection, Operation and Maintenance of ACDB, DCDB, Battery and Battery Charger.• Erection, Operation and maintenance of 220KV Switchyard and its outgoing line.• Erection of Transformer, CT, CVT, Isolator and LA.• Erection, Operation and maintenance of UPS System and Battery Charger System • Preparing Erection, operation and maintenance schedule.• Erection of Base frame, Cable Tray support, cable trey.• Cable schedule, Cable laying & Cable termination Schedules of BTG Areas.• Working as a Service Engineer, carrying out Trouble Shooting, Reduction of Breakdowns, Maximum Availability of Equipment, and Condition Based Preventive Maintenance, Equipment Behavioural Analysis & Suggestion of Improvements, Fulfilment of All Safety Measures.• Preventive/Corrective/Breakdown and Condition based Maintenance of equipment and Annual Maintenance.• To assist in continuous process improvement in plant performance for attaining optimum generation of power keeping auxiliary power consumption to minimum.• Safety, Planning and implementing the preventive & predictive maintenance schedules for reducing the overall reliability and safety of plant equipment's & machinery.• Successfully commissioned and hand over the 135 MW Turbo-Generator, Synchronized with the grid, of the power plant Show less

      • Electrical Engineer

        Apr 2008 - Dec 2010
      • Electrical

        Apr 2007 - Dec 2010
    • M/s SEPCO-1 KMPCL 6x600 MW TPP Project EPC Base

      Jan 2011 - Feb 2016
      Sr.Electrical Engineer

      Company : SEPCO-1 KMPCL 6x600 MW TPP Project EPC Base, at KSK Nariyara Akaltara (C.G).SEPCO is an EPC contract company presently working under 6x600 MW KSK Energy Ventures Limited. The company was belonging from CHINA govt. to capitalize on the emerging opportunities on the Indian power sector and focus on erection procurement, construction, Operation & Maintenance of Thermal Power Plant Projects. It has current interests on various power plants in India. Fabrications, Erection and Commissioning of 400KV Switchyard ,Type of scheme: - One & Half Breaker SchemeModel of Scheme: - D TypeNo of Dias: - 6 full + 2 HalfGenerator transformer Bays:-6Line Feeder Bays:-5Station Trans former Bays:-3Bus Section Bays:-2Symmetrical short circuit load: - 63KA/3 seconds48 no’s Double Column Isolator with Single Earth Switch (for all Breaker maintenance)14 no’s Double Columniation Isolator with Double Earth Switch (8G,9G isolators of all Dias) Fabrications, Erection, Testing and Commissioning of HT and LT panels and Motors of BTG areas, MPH and BOP Side. Issuing work permit for preventive maintenance as well as breakdown maintenance, consumable spares for plant maintenance, spares which are required in future for plant maintenance Erection, Commissioning & Maintenance of HT and LT panels and Motors of BTG area Battery bank installation and commissioning with capacity test of valve-regulated lead-acid battery and Liquid Metal acid type battery (1900AH, 900AH, 800Ah & 500AH) make- Hoppecke Erection, testing, Commissioning & maintenance of UPS System up to 2X100 KVA Laying, Testing, commissioning & maintenance of HT and LT cable. Erection, testing and commissioning of emergency power system (EPS) Erection, testing, commissioning & maintenance of electric overhead travelling crane (EOT) up to 3- 150 ton. Erection, testing, Commissioning & maintenance of ESP transformer, heater, bypass valve, lifting valve, EM pulse valve Show less

    • Voltech Operation & Maintenance Services Pvt. Ltd.

      Mar 2016 - May 2017
      Operations Manager

       Designation : Manager (Operation) March-2016 to till date Company : M/S Voltech O&M KMPCL 6x600 MW Thermal Power Plant, at KSK Nariyara Akaltara (C.G).Voltech is Operation & Maintenance Service Company, Presently working under 6x600MW KMPCL KSK Energy Ventures Limited. The company was belonging from Chennai to capitalize on the emerging opportunities on the Indian power sector and focus on Operation & Maintenance and Testing of power plant .It has current interests on various power plants.Job Responsibilities Mapping client’s requirement & coordinating, developing and implementing processes in line with guidelines Review and monitored internal procedures and practices to provide compliance with group and regulatory requirements. Monitoring the power plant equipment, functioning of operation problem Root causes analysis of Electrical & Mechanical breakdown and solution. Implementation of standards operation procedure (SOP) including critical system Record as well as compile operation data by completing maintains forms. Log and report. Wrote operation procedure and trained employee on operating equipment Issuing work permit for preventive maintenance as well as breakdown maintenance, consumable spares for plant maintenance, spares which are required in future for plant maintenance. Issuing work permit for preventive maintenance as well as breakdown maintenance, consumable spares for plant maintenance, spares which are required in future for plant maintenance Coordinating with Plant Operation, Mechanical section & other sections Shift Manpower, Log Sheets, and Housekeeping & Chart preparation for Shift staffs. PM Schedule, Defect List and Contract evaluation , Condition monitoring of motors and transformer ,Switchyard Show less

    • TECHNOFAB ENGINEERING Ltd. at

      May 2017 - Oct 2018
      Asst. Project Manager

      North East Tripura 33/11 KV DMS Project work with Design & EPC • Preparation & Submission of Substation site of Handing over & Taking over Documents from Govt. • Knowledge of substation Soil Investigation Test, Contour Test and Route Survey of 33 kV Line • Leading of Survey teams, Preparing survey & proposal drawing, getting approvals with client.• Daily site coordination with Engineers, sub contractors & reporting to Head Office.• Knowledge of Erection, Commissioning of 33 /11 KV Substation and 33 KV Line.• Planning of work & assign the task to Engineers to complete the target.• Quantity takes off from the drawing. Estimation of quantities from the drawing and Preparing of Bill of Quantity (BOQ) Show less

    • Bajaj Eleactricals

      Nov 2018 - Dec 2019
      Asst. Project Manager
    • SEPCO Electric Power Construction Corporation Company

      Dec 2019 - Mar 2020
      Asst. Manager at SEPCO Talwandi Sabo 3x660MW TSPL Project Mansa Punjab
    • Essel Projects Pvt Ltd

      Mar 2020 - Jun 2021
      Residence Construction Manager

      Fabrication, Erection and commissioning of Electrical job's for GIS and Unit#1

    • Voltech HR Services Pvt. Ltd.

      Jun 2021 - now
      Assistant General Manager

      2x800 MW NTPC Darlipali Electrical and C&I Operation and Maintenance work

  • Licenses & Certifications

    • "B" Class Electrical Licence

      Apr 2002
    • Electrical MV Licence

      Electrial Inspector Goverment of Orissa
      Apr 2002
  • Honors & Awards

    • Awarded to YOGESH KUMAR DARJEE
      Best Electrical Employee Award SEPCO III Apr 2009 Achieved Best Electrical Employee Award for 2 Consecutive years 2008 & 2009, in 9x135 MW, SEPCO 3 Electric Power Construction Company CPP Project at Vedanta Jharsuguda
  • Volunteer Experience

    • Sr. Engineer

      Issued by SEPCO Electric Power Construction Company on Jan 2011
      SEPCO Electric Power Construction CompanyAssociated with YOGESH KUMAR DARJEE