Barun Dutta

Barun Dutta

Shift In charge

Followers of Barun Dutta1000 followers
location of Barun DuttaIndia

Connect with Barun Dutta to Send Message

Connect

Connect with Barun Dutta to Send Message

Connect
  • Timeline

  • About me

    Manager TBM DMRC DC09

  • Education

    • Iswar Chandra Vidyasagar Polytechnic (Govt.)

      2000 - 2004
      Engineer’s Degree Electrical Engineer 1st Divion

      Electricity lights up our streets and buildings, and enables us to use and enjoy the many electronic devices that make our lives more comfortable. Skilled electricians and engineers work behind the scenes to ensure that we receive a continuous supply of electric power. In order to do this, they need to have a thorough understanding of the basic concepts and practices of the electrical trade that enables them to install and maintain functional electrical systems.In ALISON's free online… Show more Electricity lights up our streets and buildings, and enables us to use and enjoy the many electronic devices that make our lives more comfortable. Skilled electricians and engineers work behind the scenes to ensure that we receive a continuous supply of electric power. In order to do this, they need to have a thorough understanding of the basic concepts and practices of the electrical trade that enables them to install and maintain functional electrical systems.In ALISON's free online diploma course, the first section introduces you to the electrical trade. Topics on electrical safety, electrical circuits, and electrical theory are discussed in this section. The next section of the course focuses on what constitutes an electrical wiring system. Show less

  • Experience

    • Bisco Sponge Iron Private Limited

      Aug 2004 - Feb 2006
      Shift In charge

      Effectively handling project planning, scheduling and handling the projects on time also monitoring & followed up with customer, vendors and different internal departments for step-by-step activities getting done during execution of project.Managing operation and maintenance of all major electrical equipments and ensuring maximum operational availability thereof.Handling preventive and predictive maintenance of all major equipment; carrying out failure analysis and troubleshooting.Monitoring and analyzing the equipments to avoid unexpected breakdown and efficiently handle breakdown & modification by applying various efforts.Ensuring materials management and inventory control to maintain smooth flow of materials with minimum inventory holding.Executing cost saving techniques and modifications to achieve substantial reduction in various expenditures.Responsible for Erection, Testing & Commissioning of electrical system and handling projects which includes designing of all system, testing client inspection, commissioning, servicing and Fault finding.Interacting with the Electricity Board for round the clock grid availability at siteMaintaining stores for necessary spare and accessories. Ensured Housekeeping & Daily inspections for all the equipmentsEnsuring adherence to safety standards in all functional areas and implementing measures for enhancing safety levelsAccountable for order finalization equipments, BOQ finalization, documentation of all Electrical equipments.Ensuring records are maintained across the entire course of project execution and also handling documentation of Drawings, LOIs, Operation and maintenance manuals.Responsible for scheduling and monitoring continuous power supply to all critical equipments; effectively working on different level of distribution systemsHandling the processes of techno-commercial bid preparation/evaluation, vendor development, negotiations, inventory management. Show less

    • Aster Teleservices Pvt Ltd

      Feb 2006 - Aug 2006
      Maintenance Engineer

      Designing maintenance strategies, procedures and methods;Carrying out routine scheduled maintenance work and responding to equipment faults;Diagnosing breakdown problems;Fitting new parts and making sure equipment is working correctly;Carrying out quality inspections on jobs;Liaising with client departments, customers and other engineering and production colleagues;Arranging specialist procurement of fixtures, fittings or components;Controlling maintenance tools, stores and equipment;Monitoring and controlling maintenance costs;Dealing with emergencies, unplanned problems and repairs;Improving health and safety policies and procedures;Working with specialist equipment, such as programmable logic controllers (PLC), which control machinery on factory assembly lines;Writing maintenance strategies to help with installation and commissioning guidelines;Ensuring there is continuous cover of the machinery and equipment in case of breakdowns. Show less

    • Premier Infrastructure

      Aug 2006 - Jun 2009
      Electrical Engineer

      Deftly handled Infra Work, Site excavation, tower foundation, tower erection, shelter erection for BTS sites. ManagedErection & Commissioning of Electrical & Electronics Equipments like SMPS, UPS, Power Plant,Battery Bank (Up to 600 AH), PIU (Up to30 KVA), DG (Up to 30 KVA), and their maintenance. Requested forQuotations (RFQs), Price Evaluation & Negotiation,Vendor allocation for Infra/EB. Maintained communication with Govt Organization to get EB connections in propertime.

    • Automation & Control Services, Inc.

      Mar 2010 - Feb 2011
      Automation Engineer

      Developed Control philosophy of the process and HMI Pages for various projects like Iron Ore washing plant,Chemical Factory and hand on experience on Rockwell (Micrologix, SLC5), Siemens(S7-300) &Drives(MM420,MM430)ABB Drives. Efficiently handled Micrologix, Panel View 400 & 400+, and S7 300 & OP 77A.Participated in installation, erection, commissioning & servicing of field instrumentation system, press machines.Handled calibration of instruments as per schemes/ interface with systems like hydraulic pumps of Rexroth and parker with variable flow and pressure. Show less

    • Leroy Surveyors & Engineers, Inc.

      Mar 2011 - Feb 2012
      Electrical Engineer

      Handled maintenance & operation of Batching Plant,Crusher Plant, DGS, motors & other equipment in Conventional Tunnel Project of Northern Frontier Railway inManipur (2.80km long); involve in power distribution at site,Laying of power cable, selection of proper switchgears & maintaining safety norms.

    • ITD Cementation India Ltd

      Feb 2012 - Mar 2024
      Manager TBM

      Currently I am working in Kolkata Metro project UG-2. T.B.M in ITD-ITD CEM JV, Kolkata Metro Project, Delhi Metro project CC-32.Installation of 1010kva D.G. in ITD-ITD CEM JVInstallation and maintenance of 2000kva transformer in ITD-ITD CEM JVInstallation of grout plant in ITD-ITD CEM JV

    • Larsen & Toubro

      Dec 2023 - now
      TBM Electrical Manager
  • Licenses & Certifications

    • Electrical Supervisor's Certificate of Competency

      Government of West Bengal
      Feb 2023
  • Honors & Awards

    • Awarded to Barun Dutta
      PLC, SCADA, AC/DC Drives Institute of Automation and Technology Mar 2004 PLC, SCADA, AC/DC Drives; Institute of Automation and Technology, Kolkata
    • Awarded to Barun Dutta
      Industrial safety on electrical equipments Kolkata Port Trust (Haldia Dock Complex) Feb 2002 Industrial safety on electrical equipments; Kolkata Port Trust (Haldia Dock Complex)