Ammar Majid

Ammar Majid

Followers of Ammar Majid2000 followers
location of Ammar MajidIraq

Connect with Ammar Majid to Send Message

Connect

Connect with Ammar Majid to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer at Mass Group Holding Ltd.

  • Education

    • Educational Institution

      2003 - 2006
      BSC. Mechanical engineering Power dept.
  • Experience

    • Al-Rafedain co. for dams construction

      Jul 2007 - May 2013

      1-Execution engineer of all mechanicalworks which contain water pumps, pipes, valves, scrapers....2- Installing metal formwork for concretetanks. 1-Installing central mix concrete batching plant, (manufactured by Elba). 2- Installing metallic formwork for concrete tanks. (manufactured by Adoportisan). 3- Execution engineer of all mechanical works including the installation of pips, valves, gates, water stop locks, central scrapers, pumps (many types), bridge cranes and high voltage electrical generators.

      • Mechanical Construction Engineer

        Dec 2012 - May 2013
      • Mechanical Construction Engineer

        Jul 2007 - Dec 2012
    • Misr elnoor co.

      Oct 2014 - Mar 2016
      Mechanical engineer

      Supervision and executive mechanical engineer responsible for the erection of water pumps, pipes, valves, scrapers....

    • Al-Andalus co.

      Mar 2016 - May 2016
      Executive Engineer

      Installing the fire alarm and evacuation systems in the Iraqi oil ministry building.

    • Mass Group Holding Ltd.

      May 2016 - Oct 2018
      Mechanical Engineer

      Phase/1 (By ENKA Co.)• Following up steel tanks construction which include: One LDO fuel unloading tank (carbon steel) capacity16000 m3 Four LDO fuel holding tank (carbon steel) capacity10000 m3 One Raw water tank (carbon steel) capacity 2000 m3. Two demineralize water tank (stainless steel) capacity 4000 m3. One Service water tank (carbon steel) capacity 2000 m3. Three Evaporative water tank (carbon steel) capacity 9000.• Following up GE gas turbine frame (9FA) on base & off base piping systems according to the proper international codes and standards (ASME, ASTM, API, AWS, GE...) which include: LDO fuel system. Fuel gas purging system. Cooling and sealing system. Atomizing system. Lube oil system. Hydraulic (lift oil) system. Generator seal oil system. Generator hydrogen cooling system. Closed cooling water system. Service air system. Instrument air system. Firefighting system.• Following up GE (BOP) skids installation.• Following up Mechanical Draft Cooling Towers for combined cycle erection, (manufactured by GEA Company).• Following up Steam surface condenser installation, (Manufactured by Holtec Co.).• Following up steam turbine (C7 model) 250 MW erection & alignment procedure step by step, (manufactured by GE Company) which contain power generator's rotor insertion in the stator, packing installation, bearing installation..).• Site pumps alignment.• Following up commissioning activities (air blowing, steam blowing, pipe flushing, pipe hydrolyzing, lube oil flushing, generator H2 test and filling....).Phase/2 (By J&P Avax Co.)• Following up combined cycle (Diverter Damper) construction activities.• Following up piping constructions activities.• Following up GE turbine frame (9FA model) on base & off base piping systems.• Following up commissioning activities (air blowing, steam blowing, pipe flushing, pipe hydrolyzing, lube oil flushing, generator H2 test and filling....). Show less

    • GE Power

      Oct 2018 - Dec 2019
      Gas Turbine Mechanical Installation Lead Engineer

      1- Following up gas turbine erection activities as erection supervisor, Four Alstom GT13E2 which contain a thermal block, diffuser, equalizer, air intake manifold, exhaust stack erection..... 2- Following up gas turbine-generator alignment, radial rotor position and final box up activities.3- Following up gas turbine lube oil and closed cooling water flushing.

    • Mass Group Holding Ltd.

      Mar 2020 - now

      Lead all installation and commissioning activities of Gas Turbine frame 9FA0.4 & Steam Turbine STF-D202.

      • Mechanical Maintenance Lead Engineer

        Jul 2022 - now
      • Gas/Steam Turbine Mechanical Installation Lead Engineer

        Mar 2020 - Jul 2022
  • Licenses & Certifications

    • CSWIP 3.1 welding Inspector

      TWI
      Apr 2018
    • Certified Vibration Analyst - Category I

      Mobius Institute
      Sept 2022
    • Intermediat english course

      AMIDEAST
    • Fire Alarm And Evacuation System

      Fike Corporation
      Feb 2016