Mark Tison

Mark Tison

Pipe Helper

Followers of Mark Tison2000 followers
location of Mark TisonColonial Heights, Virginia, United States

Connect with Mark Tison to Send Message

Connect

Connect with Mark Tison to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Fluor Daniel Craft Training

      1996 - 1996
      650 hours Industrial Maintenance / Welding

      Industrial Maintenance and Pipe welding

    • Prince George High

      1987 - 1990
      Diploma/GED General studies

      Fluor Daniel Craft Training and Devlopment; Pipefitting/Welding 650 Hours; To correctly learn how to bevel prep and weld pipe and plate. To learn all the differentwelding processes. And how to apply them.; SKILLS: Pipe fitting/ Welding - 16 years NCCER certified Millwright - 15 years Precision alignment - 6 years Instrumentation - 10 years NCCER certified Iron/ Rigging - 16 years Electrical - 8 years Optical alignment Brunson scopes OSHA 10 certified… Show more Fluor Daniel Craft Training and Devlopment; Pipefitting/Welding 650 Hours; To correctly learn how to bevel prep and weld pipe and plate. To learn all the differentwelding processes. And how to apply them.; SKILLS: Pipe fitting/ Welding - 16 years NCCER certified Millwright - 15 years Precision alignment - 6 years Instrumentation - 10 years NCCER certified Iron/ Rigging - 16 years Electrical - 8 years Optical alignment Brunson scopes OSHA 10 certified Arc Flash safety trained Arc Machine UHP orbital welding Class 1000 cleanroom Rotalign and Vibralign experience 24v- 4160v Troubleshooting Show less

  • Experience

    • Brown and Root

      Jan 1992 - Jan 1995
      Pipe Helper

      Assisted Journeyman pipe fitters and welders with learning to grind, cut, and bevel pipe. Assisted in taking measurements and anything to help learn the trade.

    • Suitt Construction

      Jan 1996 - Jan 1998
      Mechnical Fitter/Welder

      Supported plant maintenance personnel as needed in all capacities. Repaired or replaces mechanical equipment such as pumps up to 800hp, gearboxes, bearings, shives, motors, conveyors, bucket elevators, cyclones, and boilers. All piping systems in the plant from ½” to 72”, structural steel, and instrumentation. All millwright work, as needed and laser alignment.

    • Fluor

      Jan 1996 - Jan 1997
      Pipe Welder

      Verified proper fit of all process piping and welded it to VPAP procedure. All welds were 100% x-ray. Welding materials were stainless, carbon, copper nickel, hastalloy, and inconel. Palo Verde used Arizona Power Service procedures.

    • LESCO

      Jan 1998 - Jan 2000
      Maintenance Mechanic

      Maintained all mechanical equipment: pumps, gearboxes, screeners, hammer mills, drum dryers, fluid bed cooler, conveyors, and air compressors. Adjusted and/or modified this equipment, or replaced if needed, as quickly and safely as possible. Maintained the package boiler for proper operation. Replaced electrical components like eyes and proxy switches, as needed.

    • QUALITY PLUS SERVICES INC

      Jan 2001 - Jan 2008
      Mechanical Project Manager

      Started as a pipe welder and within one year, was promoted to Superintendent. Was responsible for all piping and mechanical jobs in my division. Supervised up to 200 employees at one time. Was responsible for projects that ranged from $100K to $30M. Scheduled all subcontractors and kept existing scope on time and within/under budget. Became clean room certified and ultra-high purity certified in orbital welding. Brunson certified in optical scopes and laser alignments. Proficient in all aspects of plant maintenance and electrical systems up to 4160v. Show less

    • Osage Bio Energy

      Jan 2009 - Jan 2011
      Maintenance
    • Quality "Plus"​ Services, Inc.

      Aug 2012 - Apr 2022

      Interface with multiple facilities to bid and secure projects in various parts of the country. Budget material, equipment, and manhours needed to complete the project. Create schedules for duration and any subcontractors needed. Execute the project on time and below budget without sacrificing quality and safety.

      • Project Manager

        Aug 2013 - Apr 2022
      • Project Manager Food and Beverage

        Aug 2012 - Aug 2013
    • DuPont

      Apr 2021 - Dec 2022
      Construction Manager

      Construction Manager representing DuPont to complete a confidential installation process in an existing facility. Responsible for multiple contractors and disciplines in the facility while interfacing with DuPont personnel and not disrupt operations. Update daily progress and or delays, resolve issues directly, track change orders submitted for validity, schedule shutdowns as needed, liaison for DuPont to accept turnover documentation for acceptance. Track all phases of construction to completion. Show less

    • Celanese

      Jan 2023 - Apr 2023
      Construction Manager

      I was asked to represent Celanese as CM to oversee a polymer extrusion (Zytel) process train changeout. Coordinate with the multiple mechanical contractors to plan the sequence of removal of existing equipment, installing monorail beams, relocation of electrical and instrumentation for travel path while not disrupting production. Schedule closings of roadways for critical lifts with other areas of the facility without impacting their needs. Generate work permits and daily hot works. Complete all inspection and quality documentation for DuPont approval. Show less

    • DuPont

      Apr 2023 - Nov 2023
      Construction Manager

      DuPont approached me to assist with a LGWP project that was failing due to multiple roadblocks. Stepped in to assess where the project should be and where it actually stood on the schedule. Met with the electrical and mechanical contractors on-site to see where the disconnect was. Took the lead to resolve the lack of interpretation of information from the engineering firm. Within 2 months the project was on schedule, the facility was pleased to see how competent the contractors actually were with having the proper information. The site was the first one to complete the project on time out of six other identical projects. Show less

  • Licenses & Certifications

    • NCCER