    Module Construction Manager

  • Education

    • Ocean University of China

      -
      Master's degree Civil Engineering
  • Experience

    • McDermott Wuchuan Offshore Engineering Co., Ltd

      May 2008 - Jan 2013

      TENDON BUOYANCY MODULE (TBM),1000 MT• Lead the structure production engineer group to complete a 1,000 MT project (eight each tendon buoyancy tanks) from the very beginning of the project on time with client recognized quality. • Monitor and analyse daily project construction progress against the schedule, coordinate with related department to take actions accordingly.• Participate in daily internal meeting to maintain the project in the correct direction and prepare minutes of the meeting. • Review project specifications and drawings and prepare technical clarification and queries accordingly.• Take off material quantity from the drawings for purchasing purpose and prepare technical bid evaluation accordingly.• Review the construction method before start of the project. • Review work pack before issued to the work shop. 收起

      • Structure Production Engineer and Structure Production Engineer Lead

        Jan 2011 - Jan 2013
      • Structure Production Engineer - Overseas Trainee

        Apr 2010 - Dec 2010
      • Technical Coordinator

        May 2008 - Apr 2010
    • KBR, Inc.

      Feb 2013 - Jun 2015
      Construction Coordinator

      Package 2 of ICHTHYS ONSHORE LNG FACILITIES, PIPE RACK, 50,000 MT• Fulfil an initiative role in the promotion of the project safety programme for the yard and implementation of actions to improve and enhance safety behaviour. • Review relevant design drawings/vendor drawings/fabrication method statements.• Review and sign off material requisition form from contractor as per fabrication schedule.• Participate in regular internal meetings with the fabricator to maintain a common approach to the direction of the work. Prepare the MOM.• Establish and maintain a good working relationship with the Module Fabricator and provide positive input to methods and solutions for improvement. • Ensure that subcontractors executed their work in a technically competent manner as per the drawings and specifications. • Supervise piping and structure fabrication/erection progress against the scope of work/project schedule; ensure that Fabricator and lower-tier subcontractors are aware of every relevant Field Change, Site Instruction and Contractor’s reply to Site Query, etc. and take actions accordingly.• Monitor the quality performance of lower-tier subcontractors; cooperate with Quality Control team to ensure that every quality observation is rectified. • Assist the Test Pack Coordinator with line checking and punch confirmation. 收起

    • Technip

      Aug 2015 - May 2017
      Line Checker

      JSC YAMAL LNG MWP01, 200,000 MT• Assist Test Pack Coordinator with Test Pack reviewing before issued for line checking. Ensure that the PID and isometric drawings attached in the Test Pack are of latest revision; ensure that the test limit of each Test Pack is in accordance with the approved Test Block Diagram. Assist Test Pack Coordinator with maintaining the overall test pack control sheet and tracking test pack handling progress. • Perform line checking based on the Test Pack scope for the readiness of hydrostatic or pneumatic test. Instruct lower-tier erection subcontractors of the punches found during the line checking to be cleared before the hydrostatic or pneumatic test.• Prepare punch list for the whole project based on line checking performed by all the other line checkers and piping supervisors. Double check their comments to avoid missing of any important checking point.• Perform punch confirmation/killing. 收起

    • 福陆

      Oct 2017 - Dec 2019
      Pressure Test Package Engineer

      Al-Zour Refinery Project, 62,000 MT• As the focal point of Pressure Test Package, coordinate reviewing and approving the Test Packages prepared by Fabricator CFHI.• Coordinate with Engineering and Commissioning Section on the unclear/controversial issues regarding Test Package document, such as module break, line class break, test limit, TOS (Turn-over System) break on the PID, isometric drawings and TOS PID.• Coordinate with Quality and Construction section on pre-test line checking, punch clearing, pressure test witnessing and re-instatement. • Maintain and monitor the overall progress report of 1). Test Package preparation/reviewing/approving and 2). Handling status of line checking/pressure test/reinstatement for around 9,000 Test Packages.• Coordinate with Turn Over group with punch carrying-over identification and the Test Package related completion data book finalizing. 收起

    • JGC

      Feb 2020 - Apr 2023
      • Structure Superintendent

        Apr 2021 - Apr 2023
      • Structure Supervisor

        Feb 2020 - Apr 2021
    • BASF

      Jun 2023 - now
      Module Construction Manager

      With Owner BASF, assume the position of Module Construction Manager in charge of module fabrication for the New Steam Cracker Plant for BASF Integrated Site (Guangdong) Co. Ltd Project.• Set up the yard management team. Interview and select proper candidates for the team. • Review the project procedures related to HSE management, module construction and quality control. To make sure that the modules are constructed in reasonable sequence. • Supervise all disciplines of the module construction activities through the whole process from the steel first-cut to module load-out to make sure they are performed following the approved procedures, project requirements, applicable industry codes and standards.• Monitor the module construction progress against the level 4 schedule. Review and analyze weekly reports from EPC, identify the main concerns accordingly, like shortage of manpower/material/fabrication equipment, late engineering deliverables. Coordinate and expedite EPC to take appropriate and timely measures accordingly to mitigate the impact caused by the concerns, to make sure that the modules are delivered in a timely and safe manner to the project quality standard. • Make sure that there is no violation of the Safety/Health/Environmental requirements of the government and the project during the module construction. • Ensure that all the project personnel attend the HSE-related training relevant to the job. Monitor the construction HSE KPI report, including safe working hours, number of near misses (NM), field safety observations (FSO), lost time injury (LTI), fatal accident (FAT), first aid case (FA), property damage case (PD), etc, and to organize refresh training and adopt the correct precautions accordingly. • Act as a focal point between the module fabrication team and the site integration team. 收起

  • Licenses & Certifications

    • CWI

      AWS
    • PMP

      Project Management Institute