Yanjun Lu

Yanjun Lu

Welding Inspector

Followers of Yanjun Lu262 followers
location of Yanjun LuSuzhou, Jiangsu, China

Connect with Yanjun Lu to Send Message

Connect

Connect with Yanjun Lu to Send Message

Connect
  • Timeline

  • About me

    project engineer

  • Education

    • Hubei xiangfan university

      2002 - 2005
      Machinical & electronic profession

      Activities and Societies: organizate the picnic all of my class students.

  • Experience

    • Xinfeng steel instructure company

      Jul 2005 - Feb 2006
      Welding Inspector

      as factory welding inspector, responbile for general welding inspection, welding current and volt check with the WPS, grinding check before welding, groove check, the welding wire brand and type check, preheat check, welding heat input calculate, welding visual and size check.

    • Haoda steel structure Co,Ltd

      Mar 2006 - Jun 2008
      Welding Inspector

      As factory Quality department welding team leader, responsible for arranging fabrication inspection and coordinating the project owner, prepare project require WPS and welder test and so on. Apply standards: AWS D1.1, GB50205, JGJ81, SSPC and so on.

    • SGS

      Aug 2008 - Jan 2011
      Project inspector

      Position: project structure inspectorApplication standards: GB50205, JGJ81, AWSD1.1,SSPC and so on Job responsibilities: steel structure fabrication and coating quality supervising, the detail as below:Review relevant documents such as WPS, PQR, welder qualifier, ITP, shop drawing and so on.Raw material inspection including mill certifier, MTR, visual, dimension, mark checked against the corresponding mill certificateCutting and fit-up inspection including visual, dimension and raw material according with the shop drawing.Welding preparation inspection including groove, root opening, welding material, welding parameters, dimension and visual according with WPS and the shop drawing.Fabrication inspection including fabrication progress inspection, witness NDT, dimension, visual and so on according with ITP and relevant standards, codes and the shop drawingPainting inspection inclusion blasting, preparation of the shoot packing, spraying condition inspection, painting film thickness and visual inspection.Packing and shipment inspection inclusion marking inspection and loading supervision Show less

    • 福陆

      Jan 2011 - Jan 2013
      Project engineer

      Position: Associate Quality Assurance Engineer IIApplying standards: AS1554, AS1580,AWS D1.1, SSPC and so on. Job Responsibilities: the steel structure and pipe fabrication, coating quality supervising for the BHP transportable building supply, the content is as below:Review relevant documents such as WPS, PQR, welder qualifier, ITP, shop drawing, raw material retest report and so onRaw material inspection including mill certifier, MTR, visual, dimension, mark checked against the corresponding mill certificateCutting and fit-up inspection including visual, dimension and raw material according with the shop drawing.Welding preparation inspection including groove, welding material, welding parameters, preheating, dimension and visual according with WPS and the shop drawing.Fabrication inspection including fabrication progress inspection, witness NDT, dimension, visual and so on according with ITP and relevant standards, codes and the shop drawing.Painting inspection inclusion blasting, preparation of the shoot packing, condition inspection,painting wet and dry film thickness and visual inspection.Fit-out inspection for the module house inclusion level checking of CFC floor, plumbing checking of light steel, insulation heat inspection, furniture inspection, electronic equipment checking, the coating inspection for wall, holistic visual inspection and so on. Show less

    • Victor

      Jan 2013 - Mar 2017
      Project engineer

      As hunter company staff, work for Akersolution, responsbile for supervising the fabrication of steel structure, pipes, press vessel, as CWI , SSPC PCI grade II and CCS RT II, using professional technology to control the LNG module quality, contain material coming inspection, cuting inspection, fit-up inspection, welding inspection, dimension inspection, module assemble inspection,vertical check, levelness check, globle dimension check before and after welding, witness NDT and pression test, leak test, blasting and coating inspection, roughness check, salt test after blasting, witness the adhesion test, DFT check, galvanize check. Show less

    • Fjords

      Mar 2019 - now
      QA/QC engineer

      Resident SHANGHAI Yanda CHEMCAL INDUSTRY FACTORY for manage structure, the pipe and pression vessel assembling, coating and manual valve assemble and fabrication quality supervising for Liquefied Natural Gas onshore project, the content is as below:Review relevant documents such as WPS, PQR, welder qualifier, ITP, shop drawing, raw material test report and so onRaw material inspection including mill certifier, MTR, visual, dimension, mark checked against the corresponding mill certificateCutting and fit-up inspection including visual, dimension and raw material according with the shop drawing.Welding preparation inspection including groove, welding material, welding parameters, preheating, dimension and visual according with WPS and the shop drawing.Fabrication inspection including fabrication progress inspection, witness NDT, witness hydrostatic test for pipe, final assembling dimension checked, PID checking, witness leak test, dimension, visual and so on according with ITP and relevant standards, codes and the shop drawing.Moving and static Equipment assembling inspection, the static equipment assembling inspection include location, levelness or vertical and elevation inspection; the moving equipment assembling inspection include location, levelness, elevation, soft foot, shaft inspection and so on.Painting and galvanize inspection inclusion abrasive salt test, blasting, preparation of the shoot packing, spraying condition inspection,painting wet and dry film thickness and visual inspection, witness coating adhesion test.Packing and delivery inspection according to the project code. Show less

  • Licenses & Certifications

    • CWI, sspc PCI class II,RT II

      AWS, SSPC,PCN