Chris Taylor

Chris Taylor

Project Manager Intern

Followers of Chris Taylor128 followers
location of Chris TaylorSan Francisco, California, United States

Connect with Chris Taylor to Send Message

Connect

Connect with Chris Taylor to Send Message

Connect
  • Timeline

  • About me

    Senior Project Engineer at CDIM Engineering, Inc.

  • Education

    • University of Tennessee, Knoxville

      1992 - 1995
      Bachelor of Science (B.S.) Civil Engineering

      Activities and Societies: University of Tennessee Rowing Team

  • Experience

    • City of Alcoa

      Aug 1994 - Dec 1994
      Project Manager Intern

      Supervised staff of 15 and was responsible for Alcoa-Maryville-Blount County Landfill Improvements. Worked directly with Landfill Manager to create efficient, user-friendly layout of landfill. Determined watershed area and design runoff flow. Designed maintenance building and scale house. Evaluated and offered alternatives for road design and traffic flow characteristics. Submitted plans and cost estimates to be bid upon by local contractors.

    • Metropolitan Washington Airports Authority

      Feb 1996 - Apr 1996
      Office Engineer Intern

      Assigned to Parsons Management Consultants for New Terminal Project at Reagan National Airport (main airport for Washington D.C.). Performed field inspections and reported findings to construction managers. Upheld compliance to design specifications and drawings. Maintained schedule updates. Documented plan revisions. Received Building Officials Code Administrators (BOCA) training.

    • The Neel Company

      Apr 1996 - Feb 1999
      Design Engineer

      Designed precast modular retaining walls from conceptual design to construction. Fully involved in submittal/tender packages, including cost estimating and design calculations. Served as technical consultant for architects, Engineers of Record, contractors, and precast concrete facilities. Provided national and international on-site construction/technical assistance. Conducted site investigations. Created macros to enhance CAD applications. Trained new employees on software applications.

    • Freewill Enterprises

      Dec 1998 - Sept 2001
      Owner

      Responsibilities involved the start up and successful management of a business manufacturing and distributing gardening systems. Coordinated & supervised production schedule with 25 suppliers, 6 subcontractors and 2 employees. Focused on customer relations, budget forecasting, inventory control, financial and legal affairs, bookkeeping, computer maintenance and operations, database implementation, website operations, and sales. Sold business to partner after 2nd profitable year.

    • Akers & Associates

      Sept 1999 - May 2003
      Project Engineer

      Responsible for preparing all drawings for projects ranging from USD$100,000 to USD$2,000,000. Typical duties include preparing grading and drainage plans, erosion control plans, site plans, tentative maps, utility plans, surface/terrain modelling and drainage calculations. Created computer library of standard details. Maintained and managed office-wide computing system. Representative projects ranged in size from 0.2 to 26 hectares and included residential properties, subdivisions and small business/government developments (e.g. medical centres, libraries, etc.). Show less

    • Concept Marine Associates

      May 2003 - Sept 2003
      Project Manager

      Coordinated and oversaw technical & financial aspects of harbours and dock structures. Performed cost estimates, cost analysis and design. Representative projects include sea harbours, recreational lake docks, and Long Beach Marina Improvements.

    • Greenwood & Moore, Inc.

      Nov 2003 - Jan 2005
      Project Manager

      Head of Engineering Department, supervising five employees. Project Manager for “Eden Medical Center Improvements”, a 10-year, US$330 million dollar project. Developed multi-phase design under constraint of uninterrupted hospital operations. Oversaw all infrastructure design and utility relocation, mass and fine grading, roading, and traffic flow. Restructured CAD operations and policies for optimal efficiency. Created and implemented company-wide automated scheduling / resource management system. Representative projects include residential properties, shopping mall outparcels and business/municipal developments (e.g. churches, hospitals). Show less

    • Berenyi, Inc.

      Jan 2005 - Nov 2006
      Staff Engineer

      Head of Commercial Division, Civil Engineering Department. Responsible for complete scope of work for all commercial and industrial land development projects including client liaison, tender packages, and consenting. Representative projects include Daimler Chrysler Sprinter Vans Plant Improvements, multi-unit strip malls, office buildings and warehouses.

    • Trico Engineering Consultants, Inc.

      Nov 2006 - Mar 2007
      Senior Engineer

      Supervised engineering design of several commercial land development projects and additions. Wrote proposals, completed due diligence site analyses and performed large scale drainage basin studies.

    • Davis & Floyd, Inc.

      May 2007 - Jun 2008
      Senior Engineer

      Project Manager for “Navy Yard at Noisette”, a 137 hectare sustainable urban redevelopment (high density urban, suburban, residential subdivisions) of the abandoned Charleston Naval Base under the Leadership in Energy and Environmental Design for Neighborhood Development (LEED-ND) pilot program. Prepared work breakdown structure and budget. Produced plans, specifications and design reports. While supervising a design team of five, helped to reduce project cost by 28% and maintained project programme. Created agendas and liaised with client, architect, and various county and city agencies as needed in weekly internal design meetings and monthly external design meetings. Technical aspects of project included roading, utilities, hydraulic and hydrological modelling, water supply, stormwater and wastewater management. Created and directed AutoCAD policies that enhanced overall AutoCAD production. Show less

    • Weiss Associates

      Oct 2008 - Sept 2014
      Senior Project Engineer

      Design and provide complete functional environmental remediation systems for clients and stakeholders in the private and public sectors. These projects involve ground water extraction well networks, dual-phase (ground water and soil vapour) remediation systems, secondary containment, and treatment system relocations. Project management duties include maintaining great client and stakeholder relations, developing proposals (scope, programme and budget) for targeted projects, analyzing programme and budget/effort during the project, preparing invoices and administering project closeout. Technical duties include engineering design from concept and detailed design through to construction administration, preparing pressure flow and pump balancing calculations, pipe sizing, trenching methodology and reinstatement, seismic calculations, structural concrete calculations, materials and instrumentation research, controls and logic design, and contract specifications. Show less

    • Beca

      Sept 2014 - Feb 2015
      Civil Engineer

      (Fixed-Term Contract)Directed tender-level (NZS 3910) civil technical package for stormwater management plan using a constructed wetlands within multi-disciplinary team environment. Liaise with client at key intervals to ensure overall vision was achieved. Negotiated client-initiated work order changes to design scope and budget. Participated in weekly management meetings to maximize resources effectively. Technical elements of package included earthworks, modelling, open channel, pressure, and gravity flow, pipe sizing, pump station design, trenching and reinstatement, road geometrics, pavement design, controls methodology. Project capital cost valued at $1.5M. Show less

    • Airey Consultants Limited

      Jul 2015 - Jun 2017
      Senior Civil Engineer

      In this role I oversaw the civil engineering department for the Pukekohe office, reporting to the Managing Director who oversaw the structural engineering services for the office. I have worked with in Auckland and Waikato regions to provide services including stormwater and wastewater reports, flood assessments, utility capacity checks, resource consent applications, engineering plan approval, engineering support during construction, as-built certifications, 224(c) approval process. My role also focused on maintaining great client relations, producing fee estimates, and being responsible for civil engineering invoicing and revenue receipts. Representative projects include rural production industries (greenhouses, fruit produce packing facilities, nurseries), subdivisions, light industry, office buildings, small hospitals, schools and residential areas. Show less

    • CKL Surveys, Ltd.

      Dec 2017 - Mar 2019
      Senior Civil Engineer

      In this role I lead the technical design of civil works for land subdivisions in the primary sectors (Residential, Commercial and Industrial). I am involved in the entire project cycle, from initial client interaction, developing detailed civil design (calculations, drawings and specifications), drawing up contract documents, awarding the successful tenderer, construction administration, through to 224(c) certification. I mentor and train junior engineers on an ongoing basis. I have also taken on additional managerial duties while the Engineering Manager role for the company was vacant. Representative projects include general land subdivision projects. Show less

    • CDIM Engineering, Inc.

      Jan 2019 - now
      Senior Project Engineer
  • Licenses & Certifications

    • Confined Space Non-Entry Rescue Training

      California Division of Occupational Safety and Health (Cal/OSHA)
    • CPR

      Red Cross
    • First Aid

      Red Cross
    • Fonterra Contractor Induction

      Fonterra
    • Hazardous Waste Operator

      California Division of Occupational Safety and Health (Cal/OSHA)
    • Engineer In Training

      Commonwealth of Virginia
    • Level 1 Basic Traffic Controller (Inspector)

      NZ Transport Agency
    • Civil Engineer

      State of California
  • Honors & Awards

    • Awarded to Chris Taylor
      Facilities & Infrastructure Directorate Award for outstanding performance Lawrence Livermore National Laboratory 2012 TFA Arroyo Seco Pipeline Extension Project
    • Awarded to Chris Taylor
      Engineering Excellence Award American Council of Engineering Companies of South Carolina 2008 Master Planning for Navy Yard at Noisette
    • Awarded to Chris Taylor
      Certificate for Outstanding Workmanship Mayor of Alcoa 1994 City of Alcoa landfill Redesign