Rizwan Ali

Rizwan Ali

Electrician

Followers of Rizwan Ali335 followers
location of Rizwan AliLahore, Punjab, Pakistan

Connect with Rizwan Ali to Send Message

Connect

Connect with Rizwan Ali to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager of Network Services & Strategic Projects at Wateen Telecom Limited.

  • Education

    • Government College of Technology Rawaind Lahore

      2003 - 2006
      Associate’s Degree Electrical Engineering
    • Al Dawa model High School Kasur

      2001 - 2003
      High School Bio Science

      Matric

    • Preston University

      2011 - 2013
      B-Tech (Hons) Electrical
    • Preston University

      2007 - 2009
      B-Tech (Pass) Electrical Engineering
  • Experience

    • High Tech Engineering (Pvt) Limited Lahore

      Feb 2007 - Oct 2008
      Electrician

      1-Operation and maintenance of Rectifier units at Warid Telecom GSM sites2- Operations and maintenance of Generator sets, ATS panels and three phase powersupply system at Warid Telecom GSM sites.

    • EnerCom Solution (Pvt) Ltd Lahore

      Oct 2008 - Aug 2012
      Electrical Supervisore

      1-Finding the problems and suggest the best possible solution.2- Operations and maintenance Power-one rectifiers 1300 & 1600 series, ZTE ZX3000rectifiers.3- Operations and maintenance holding Devices like an IPS, Gem2, Gem3 and alsodistribution systems.4- All type of Gensets module Installation and configuration.5- Operations and maintenance of Generator sets, ATS panels and three phase powersupply system at Telenor GSM sites.6- Processing of Electricity Bills including all BSC, HUB, BTS, sites and Miscellaneoussites. Show less

    • Extreme Engineering Solutions (Pvt) Lahore

      Aug 2012 - Apr 2013
      Area Coordinator

      1-Executing and maintaining the various plans.2- Preparing electrical drawings and specifications3- Presenting the model in front of seniors and elaborate it.4- Responsible for designing, price evaluation, calling quotation and procuring all sort ofmaterial related to construct Telenor sites.5- Responsible for preventive and corrective actions related of area on Telenor GSMProject.6- Operations and maintenance of Power-one rectifiers, ZTE ZX3000 rectifiers andholding Devices like an IPS, Gem2, Gem3 and also distribution systems7- Project management of infrastructure projects.8- Processing of Electricity Bills including all BSC, HUB, BTS, sites and Miscellaneoussites9- Responsible for managing facility services (i.e. commercial & Genset Power, Rectifiersystem etc.10- Site Surveys and complete follow up the CME work.11-Act as a role model for the facility management team to provide infrastructure supportto meet unmatched quality.12-Identify team development requirements and groom the team for improved technicalskills and efficient support operation.13- Ensure day to day operations related to my area of work. Show less

    • Vitel Tech Engineering (Pvt) Ltd Lahore

      Oct 2013 - Apr 2014
      Aera Coordinator

      1-Act as a role model for the facility management team to provide infrastructure supportto meet unmatched quality.2- Responsible for preventive and corrective actions related to facility management team.3- Ensure day to day operations related to my area work.4- Responsible for designing, price evaluation, calling quotation and procuring all sortof material related to bank sites.5- Resolve the power outage issue.6- Operations and maintenance of Generator , Power supply system at UBL Banksites in different cities. Show less

    • Wateen Telecom Limited

      Apr 2014 - now

      • Responsible for the Operational delivery as per KPI and SLA regarding the effective implementation of network surveillance, fault management, performance reporting & network change control according to the processes while enforcing strict business controls for all the domains.• Responsible for preventive and corrective actions related to all power types of equipment in the region and Data Center.• Power & Energy Management which includes complete InfraStructure of “Hosted Data Center”.Complete Electrical Circuit Analysis of “Hosted Data Center”.• Genset maintenance, Services, coordination with maintenance teams for timely facilitation and restoration of problems• Building Repair & Maintenance (Corrective/Preventive Schedules) Distribution Boxes and LT, HT Panels.• Daily Inspection of Equipment rooms (Switch, Power, Battery, Transmission, Data Center)O&M of Power and involved in related activities/PARs if any.• Responsible for designing, price evaluation, calling quotation, and procuring all sort of material related to construct Tier leveled Data Center..• Identify team development requirements and groom the team for improved technical skills and efficient support operation.• Serve as the primary point of contact 24/7.• Coordinating critical disaster recovery procedures directly impacting the stability/working of data center operations.• Responsible for managing facility services (i.e. commercial & Genset Power, Rectifiers, Inverters, UPS power, HVAC system, Access control, Fire, Detection/suppression, surveillance, etc.• Preparing electrical drawings and specifications.• Project Implementation plans and preparing BOQs.• Inventory Management. Show less

      • Assistant Manager

        Apr 2024 - now
      • Senior Executive Infrastructure and Team Lead

        May 2021 - Apr 2024
      • Executive Infrastructure

        Apr 2014 - Apr 2021
  • Licenses & Certifications

    • Ms Office

      Civic Computers Training Institute
      Aug 2014
    • Advance Electrical Safety Training

      OSALP INTERNATIONAL OCCUPATIONAL SAFETY & LOSS PREVENTION
      Mar 2017
    • Appreciation for Energy Conserving

      Wateen Telecom Limited
      May 2018
    • Genset Operation and Maintenance Certification

      HITECH NETWORK PVT. LTD.
      Sept 2018
    • Perkins Genset Installation Certification

      Ghaddar Machinery Co.
      Sept 2017
    • Solar PV Certification

      Prenac
      Mar 2019
  • Honors & Awards

    • Awarded to Rizwan Ali
      Energy Conserving Project Wateen Telecom Mar 2018 Energy conserving project and saved millions of rupees.
  • Volunteer Experience

    • New Genset 630Kva installed in our old system,New Module DSE 7420 ,Le-grand ACB,Socomec Aty S 3S

      Issued by Wateen Telecom on Apr 2016
      Wateen TelecomAssociated with Rizwan Ali