Ahmed Mallah

Ahmed mallah

bookmark on deepenrich
location of Ahmed MallahKarāchi, Sindh, Pakistan
Followers of Ahmed Mallah24000 followers
  • Timeline

  • About me

    Manager HSE Field at UEP

  • Education

    • Mehran university of engineering & technology jamshoro sindh pakistan

      1984 - 1989
      B.e mechanical engineering a
  • Experience

    • M/s. suleman & sons (pvt) ltd.

      Sept 1989 - Mar 1990
      Assistant engineer

      Project: Bin Qasim Thermal Power Station extension unit # 5.RESPONSIBILITIES: Erection, installation of steel structure, fabrication of piping for boilers in the supervision of Marubeni Corporation.

    • Descon engineering limited

      Mar 1990 - Aug 1990
      Mechanical engineer

      Project: Thermal Power Station, Kot Addu - PAKISTANRESPONSIBILITIES: Erection, installation of steel Structure, piping systems, sand blasting and painting, hydrostatic testing and commissioning of plant.

    • M/s. fair field (pvt) ltd.

      Sept 1990 - Dec 1991
      Site engineer

      Projects: WAPDA, (Water & Power Development Authority) & oil & gas fields of PAKISTAN. RESPONSIBILITIES: Erection, installation, fabrication, welding, coat wrapping of piping, pigging, cathodes Protection, sand blasting & painting, oil storage tanks, cross country pipelines, repair & maintenance and commissioning of systems / plant under the supervision of:• Union Texas of Pakistan Inc. (U.S.A) • Mitsui (Japan).• Gibbs & Hill Inc. (U.S.A).• General Electric (Germany). • SNGPL (Sui Northern Gas Pipeline Ltd). Show less

    • M/s. gibbs & hill inc. (u.s.a.).

      Feb 1992 - Feb 1993
      Inspection engineer

      Project: Combine cycle of 300 MW thermal power stations located at Guddu Barrage - PAKISTANRESPONSIBILITIES: Inspection & maintain the quality of job, of supreme contractors; • Siemens AG of Germany. • Noel of Germany.• Descon Engineering (Pvt.) Ltd.• Suleman & Sons (Pvt.) LTD.

    • M/s. al abbas sugar mills ltd, mirwah gorchani

      Feb 1993 - Oct 1996
      Shift engineer

      RESPONSIBILITIES: Commissioned the plant successfully during trial season, under the supervision of French Experts. To run the plant during crushing season, and perform the operation and maintenance job during & after crushing season of the plant.

    • M/s abdul wasay siddiqui & co.

      Oct 1996 - Oct 1997
      Project engineer

      Project: kaza Pipeline project, Turk flow pipeline & Bukhari oil & gas facility upgrade of M/S Union Texas Pakistan Inc. at Badin Sindh. RESPONSIBILITIES: Erection, welding, painting /coating, installation & fabrication of piping in the facilities / plants compression stations, cross Country pipelines, oil storage tanks, repair & maintenance and commissioning of plant under the supervision of: • Union Texas of Pakistan Inc. • SGS Pakistan Limited.

    • M/s. flex engineering (pvt) ltd.

      Oct 1997 - Oct 1998
      Project manager

      Project: M/S. Habibullah coastal 140 MW combine cycle power plant Quetta, - Pakistan.RESPONSIBILITIES: Erection, installation of steel structure, fabrication of piping for HRSG boilers, oil & water, Storage tanks, sand blasting and painting, hydrostatic testing, installation of fire fighting system and commissioning of plant under the supervision of: • Habibullah Coastal (U.S.A.). • BW & G (Turkey). • Fiat-Avio (Australia).• Cetic (China).

    • M/s. gresham eastern (pvt) ltd.

      Jan 1999 - Oct 1999
      Project engineer

      Project: M/S Chemi-visco fiber Ltd. at Nawabshah Sindh, (Textile / Chemical) plant.RESPONSIBILITIES: Erection, installation of equipment’s, fabrication & welding of piping, storage tanks and Commissioning of systems/ plant under the supervision of Chinese Experts

    • M/s. safec engineering (pvt) ltd.

      Oct 1999 - Apr 2000
      Project manager

      Project: Parco Mid Country Refinery in Multan.RESPONSIBILITIES: To carry out construction & commissioning activities and Coordinate with the client, under the supervision of: • Marubeni Corporation of Japan as Lead Construction Contractor.

    • M/s. teams international inc

      May 2000 - Aug 2001
      Project engineer

      Project: Oil & gas projects of BP Pakistan formerly (Union Texas Pakistan Inc.) Badin Pakistan.RESPONSIBILITIES: Erection, welding, painting / coating, installation of all oil & gas pipelines, plant piping, cross country pipelines, Equipment’s, repair and maintenance and commissioning of systems under the supervision of: • BP- Pakistan Exploration & Production Inc. • SGS- Pakistan Limited.

    • Siemens pakistan. engg. co. ltd

      Jan 2001 - Jan 2002
      Piping engineer

      M/S. SIEMENS PAKISTAN LTD.Project: LASMO Oil & Gas Bhit field for development project phase-I (gas treatment and compression plant).RESPONSIBILITIES: Fabrication, welding, painting / coating, erection, installation piping, cross country pipelines, equipment’s, Commissioning & maintenance of systems/ plant under the supervision of: • LASMO Oil Pakistan Ltd.• Snamprogitti Egg. Limited. • Aquater (Italy).

    • M/s. pipe link construction (pvt) ltd.

      May 2002 - May 2003

      Project: BP Pakistan Exploration & Production Inc. Oil & Gas facility at mazari for upgrading.RESPONSIBILITIES: Fabrication, welding, painting / coating ,erection, installation of plant piping, cross country pipelines, equipments, steel structure, calculation the BOQ according to drawings, reconciliation of material, as built drawings, commissioning & maintenance of the plant under the supervision of: • BP- Pakistan Exploration & Production Inc. • SGS Pakistan Limited. • Moody International Pakistan Show less

      • PROJECT ENGINEER

        Sept 2002 - May 2003
      • PROJECT ENGINEER

        May 2002 - Sept 2002
    • M/s. moody international pakistan.

      Jun 2003 - Sept 2003
      Inspection engineer

      Project: Papco white oil project (W.O.P.P) at shashi steel Mills Karachi, for 26”- spiral weld fabrication of pipe line.RESPONSIBILITIES: To inspect and maintain the quality of the job of Supreme Contractors.• Techno Engineering Services.• Shashi (China)

    • M/s. pak-arab pipeline company limited.

      Apr 2004 - Jan 2005
      Commissioning / start-up engineer

      Project: Oil pipe line project, 26-dia, 780 km long, cross country pipe line from Karachi Port Qasim to Mahmood Kot. • To carry out the Pre-Commissioning, Commissioning activities. • Performance Test of the Equipments, Stations/Terminals, and Test-run of the whole system for 7- days Trouble free Operation.

    • سابك

      Jan 2005 - Jun 2008

      SABIC (SAUDI BASIC INDUSTRIES CORPORATION), engineering & project management Riyadh site projects (RSP), at their pilot plant and catalyst projects in Riyadh industrial city-II, kingdom of Saudi Arabia.To inspection and maintain the quality of the job by Global Contractors.Carry out the all the construction, Pre-Commissioning, Commissioning & Maintenance activities.Leading, developing and improving as Client Representative the construction and commissioning activity for rotating equipment and packages. Witness FAT/SAT and handover to client. Verify EPC Contractor’s site heavy rotating machinery and installation works as per approved ITP/project requirements / QA/QC plan. Carry out Mechanical Completion punch listing and site hydro testing for all equipments. Witness and accept the operational tests on behalf of company project team. Endorse all mechanical system commissioning dossiers at hand over stage. Show less

      • PROJECT ENGINEER- CONSTRUCTION & COMMISSIONING

        Mar 2005 - Jun 2008
      • Construction Engineer

        Jan 2005 - Jan 2008
    • Sabic pmt, yanbu national petrochemical company,

      Jun 2008 - Jun 2009
      Senior engineer-inspection

      SABIC PMT, YANBU NATIONAL PETROCHEMICAL COMPANY, at their Polyolefin’s Project (YANBU) Plant in Yanbu industrial city, kingdom of Saudi Arabia.•To inspection and maintain the quality of the job by Global Contractors.•Carry out the all the construction, Commissioning & Maintenance activities, performance test of the plants /equipments, and test run of the whole system.

    • Arab tank terminals ltd.(enoc)

      Jun 2009 - Jun 2012
      Terminal engineer

      Worked with Arab tank Terminals Ltd.Member of Horizon Terminals Group,Yanbu Al-Sinaiyah, Kingdom of Saudi Arabia, at their Terminal in Yanbu industrial city, kingdom of Saudi Arabia.To take care daily bases maintenance activities, ships, road tankers and ISO tankers loading unloading.Inspection and maintain the quality of Tank form Phase-I and Phase-II..Carry out the all the construction, Commissioning, Maintenance activities, - Field Engineering, Specifications, Data Sheets, Bid Evaluations and Requisitions, Supplier Document Requirement Lists, RCM, troubleshooting, standards, procedures, SAT, performance testing and failure investigations. Job assignments include equipments in oil and gas as well as all associated systems, instruments and electrical equipment, cooling, cryogenic equipment , protections and safety systems, FPSO, platform, equipment, pig launchers, port facilities /Jetty, -Oil terminal, mechanical seal, furnaces, boilers, HRSG, Screen, pumps, gear boxes, refrigeration equipment, hydraulic/lube oil, vibration monitoring , fuel and gas, valves, piping, etc. performance test of the plants /equipments.Maintenance and overhauling for mechanical equipment. Vibrations control and diagnoses for rotating equipment. Carried out general safety awareness training for the workforce at regular intervals. Responsible for Utilities and Jetty (Oil terminal), QC up-date and Inspection activity after monthly/annually overhauling. Establish warehouse spare parts (CMMS) and coding department to complete Material/Spare parts Specifications for equipment. Show less

    • United energy pakistan

      Jun 2012 - now

      Manage and plan a construction project.Survey a construction site, give a description about how would like to complete the project and its consequences.Liaise with federal entities, environmental agencies and local authorities on the implications of the construction.Ensure the site sanitation and cleanliness.Juniors are helped with appropriate information related to construction.Address the concerns of the workers and advice them on the subject of the construction process.Solve the construction problems efficiently.Conduct a study on the site of construction.Provide quality control and quality assurance to make sure that the purposes of the project are achieved.Make sure that the entire safety rules related to construction work are observed.Obtain the materials required for construction and check them.Supervise the work of contractor and maintain the quality of job. Prepare drawings, work of scope for new modifications, award work to contractor and supervise construction activities. Show less

      • Manager HSE Field

        Apr 2024 - now
      • Sr. Staff Engineer-Construction

        Jun 2012 - Apr 2024
  • Licenses & Certifications

    • Liquid penetrant testing (p.t) level-ii

      Arif ali- (asnt level iii, p.t, mpt, r.t. examinar)
    • Magnetic particle testing (m.p.i) level-ii

      Arif ali- (asnt level iii , p.t, mpt, r.t. examinar)
    • Radiographic interpretation & testing (r.t)-level-ii

      Arif ali- (asnt level iii , p.t, mpt, r.t. examinar)
    • Hazard recognition training

      Bp pakistan exploration & production inc khaskheli east camp.
      Oct 1996
    • First aid training

      Union taxes pakistan inc.
      Apr 1989
    • Head and heart: the art of modern leadership

      Linkedin
      Aug 2024
      View certificate certificate
    • The leap to leader: go from management to leadership

      Linkedin
      Aug 2024
      View certificate certificate
    • How to be an inclusive leader (getabstract summary)

      Linkedin
      Aug 2024
      View certificate certificate
    • The six morning habits of high performers

      Linkedin
      May 2024
      View certificate certificate
    • How to use linkedin learning

      Linkedin
      May 2024
      View certificate certificate