Md.  Mubarak Hosen

Md. Mubarak Hosen

Quality, Sewing

Followers of Md.  Mubarak Hosen141 followers
location of Md.  Mubarak HosenDhaka, Dhaka, Bangladesh

Connect with Md. Mubarak Hosen to Send Message

Connect

Connect with Md. Mubarak Hosen to Send Message

Connect
  • Timeline

  • About me

    Quality Assurance Management Professional

  • Education

    • Bangladesh Technical Education Board

      -
      Diploma ENGINEERING
    • Madrasha Education Board

      -
      Secondary School Certificate - SSC Science
    • Northern University

      -
      Bachelor of Science - B.Sc Textile Engineering
  • Experience

    • Textrim International Ltd.

      Jan 2015 - Feb 2016
      Quality, Sewing
    • Pacific Quality Control Center L Td.-Pqc

      Mar 2016 - Nov 2018
      Quality Control Officer

      Achievement: • Successfully ensured 0% customer claim in last 3 years of tenure • Solely performed & handled the whole quality control activities• Improved quality control system gradually and ensured smooth growth of the business

    • Epic Group

      Feb 2019 - Mar 2025
      Quality Executive

      Core Function:• Perform technical audit and ensure standard of quality • Monitor & supervise WIP and submit report on regular basis• Ensure a well-maintained housekeeping system • Conduct fabric inspection • Check all types of samples like counter, fit, size set, pps before sent buyer approval • Check sewing & packing materials in-house status• Check fabric inspection report, GSM & shrinkage test report • Ensure wash standard with approval• Find out problems & solve technical issues• Conduct several meetings & inspections like PP meeting, pilot run inspection, inline inspection & final inspection • Follow up time & action calendar and ensure on time shipment • Review report after processing samples to internal and 3rd party wash Achievement:• Successfully ensured 0% customer claim against inspected goods• Improved overall quality standard of the factory and housekeeping system• Rewarded as the best employee (verbally) which was measured through KPI • Successfully introduced and implemented new system and improved product quality Show less

  • Licenses & Certifications

    • Root Cause Analysis & Corrective Action Plan

      Epic Group
    • Hazardous objects Management standards

      Epic Group
    • Audit Rules

      Epic Group
    • Needle detection management standards

      Epic Group