Shaun Sun

Shaun Sun

Manufacturing Engineer

Followers of Shaun Sun78 followers
location of Shaun SunHangzhou, Zhejiang, China

Connect with Shaun Sun to Send Message

Connect

Connect with Shaun Sun to Send Message

Connect
  • Timeline

  • About me

    Quality Manager

  • Education

    • Hangzhou University

      1990 - 1993
      Associate’s Degree Industrial Safety Management
    • Hangzhou Mechanism Industrial School

      1978 - 1981
      High School machinery graduation certificate
  • Experience

    • Hangzhou Power Equipment Company

      Aug 1981 - Apr 1996
      Manufacturing Engineer

      Manufacturing Engineer ,wrote work instruction. The product was the hydro power equipment.

    • Kvaerner ( Hangzhou) Power Equipment Co., Ltd

      May 1996 - Dec 2002
      EHS Supervisor

      I was responsible of the safety and health and environment of the company and reported to Manufacturing Leader immediately. Established the EHS operation system of the company.

    • GE Hydro Asia Co., Ltd

      Jan 2003 - Dec 2008
      Director of Manufacturing

      Major Responsibility: Charged of the responsibility of four shops plus Maintenance and Warehouse & Crane team. The product was the hydro power equipment.Key Achievements 1.Passed 7 FPQs ( first piece qualification) of GE successfully . 2.Developed planning & control system, making sure production schedule link up with the sales plan, made remarkable contribution to achieve 45M$ sales revenue and 89.5% on time delivery rate in 2006. 3.Took lead the relocation of the plant successfully, therefore, obtained the special award from GM. 4.Developed inventory control process, enhanced inventory turn from 2.13 in the Nov.2003 to 3.54 in the Oct. 2004. Show less

    • GE Energy Hangzhou Co., Ltd

      Jan 2009 - Oct 2013
      Operations Leader

      Major Responsibility:Charged of the operation of the Steam/Generator COE which included Quality, EHS, Cost , Productivity, On time delivery etc. the products were the components of the Steam Turbine/Generator, such as LP Hoods, Standards, Diaphragm, Generator frames, End Shields etc. Key Achievements1.Developed a quality control process which was fully meet the GE criteria.2.Passed 18 FPQs ( first piece qualification) of GE successfully. 3.Developed the manufacturing capacity of 24 generator frames & 7 LP Hoods per year. 4.Reduced the cycle time of the generator frames to 43 weeks vs 62.5 weeks FPQ within two years. Show less

    • GE Dresser Wayne fuel Equipment (Shanghai) Co., Ltd

      Nov 2013 - Nov 2014
      Plant Manager

      Major Responsibility:Charged of the operation, which included Quality, EHS , manufacturing, material planning, material purchasing, inventory etc. The major products are fuel dispensers and the components related. Key Achievements1.The score of EHS frame work was improved from 11 to 18 in eight months, it met the GE’s criteria.2.Productivity improved from 83% in 2013 average to 93% by the Sep.2014. 3.On time delivery rate improved significantly, it was 100% in the Nov.2014 vs 83% in the Jan.2014. Show less

    • Zhejiang Jiali Technology Co., Ltd

      Nov 2014 - Apr 2016
      Executive Director

      Major Responsibility Charged of the operation, which included quality/QMS, manufacturing,sourcing, service, EHS etc. The major products are petroleum pipeline pumps.Key Achievements 1.Successfully passed the renewal & annual audit of ISO9001 & ISO14001 & OHSAS18001 in July 2015. 2.Developed a planning & control systems, which includes sales & operation &material, inventory control etc. 3.On time delivery ratio was improved significantly from 87% in 2014 to 95% in 2015.

    • Citylift Parking LLC

      Jun 2016 - now
      Quality Manager

      Major Responsibility:To ensure all products (automatic parking system) shipped from manufacturing facility in China to USA is accurate and meets all structural, mechanical, and electrical requirements. Monitor project schedule to ensure on-time delivery. Responsible for translation of drawings and technical documents.Key Achievements:1.Developed quality control/inspection process in the partner plant, which included structure & mechanical parts & electrical parts; developed a labeling process for all shipping components, to ensure the installation was done smoothly in the America field.2. Participated four times of application of the ETL certificate for the electrical control cabinets & EV adaptor plug of the vehicle and succeed.3. Completed the review and translation on electrical and mechanical installation drawings AutoCAD and packing lists of 110 of automatic parking projects.4. As a major link of the communication between the Citylift Parking LLC and the China Plant, whatever electrical / mechanical or language, coordinated effective & timely to solve all kinds of issues during material receiving, installation, commissioning and after-sales, 100 plus projects of automatic packing system were installed and run succeed.5. Conducted RCA and followed up the preventive actions in the China Plant until it was done as required per the feedback from the America field. Show less

  • Licenses & Certifications

    • Graduation certificate

      Hangzhou University
  • Volunteer Experience

    • OMLP Assignment Leader

      Issued by GE Power & Water
      GE Power & WaterAssociated with Shaun Sun