Lakshan RR

Lakshan RR

Site Execution & Control

Followers of Lakshan RR922 followers
location of Lakshan RRMadurai, Tamil Nadu, India

Connect with Lakshan RR to Send Message

Connect

Connect with Lakshan RR to Send Message

Connect
  • Timeline

  • About me

    Project Coordinator

  • Education

    • Amrita Vishwa Vidyapeetham, Coimbatore

      2016 - 2020
      Bachelor of Technology - BTech Civil Engineering
    • National Institute of Construction Management & Research (NICMAR)

      2020 - 2022
      PGDM Advanced Construction Management
  • Experience

    • Vaishnavi Group

      Apr 2021 - Jun 2021
      Site Execution & Control

      The era of precast construction taking over conventional method is near. I was lucky to work as an intern in one such site. The whole structure is being construction by precast methodology with "Vaishnavi Infrastructure" being the client and "Katerra" being the contractor.

    • Shapoorji Pallonji - Engineering & Construction (SP E&C)

      Jun 2022 - Aug 2022
      Post Graduate Management Trainee

      Construction of a hospital in remote part of Odisha was challenging, got to know how location of site is one of the integral factor that affects the progress of work. I had a hands on experience on various document preparation under the planning department starting from daily DPR to WPR, MPR, MIS, Labour Productivity, PR/PO Tracking, Concrete Reconciliation.

    • Developer Group India

      Sept 2022 - Jul 2024

      Pre-Construction of low rise mixed used residential spread across an area of 6.84 Acres. Looked into land survey, obtaining planning permit to appointment of various consultants and finalizing the tenders.

      • Chief Manager

        Apr 2023 - Jul 2024
      • Senior Manager

        Sept 2022 - Mar 2023
    • Cushman & Wakefield

      Jul 2024 - now
      Project Coordinator

      August 2024 - September 2024Raintree, Anna SalaiRefurbishment of an existing 5 star hotel. Closely monitored and handed over 2 floors of 28 rooms each by coordinating with the operations, housekeeping and vendors to complete the pending works and rectify the snags to complete it on time.July 2024 - August 2024BAM DLR, Ambattur (MAA10) GIS Building230kv/11kv GIS for the 10.4 acre Data Centre campus. Looked into the coordination and procurement of LLEs by various vendors and monitoring the site progress. Show less

  • Licenses & Certifications