
Timeline
About me
Manager at ROBI Axiata Ltd.
Education

Rajshahi university of engineering & technology,bangladesh
1999 - 2004B. sc. engineering electrical & electronic engineering (eee)Activities and Societies: B.Sc. Engineering in Electrical & Electronic Engineering Department. Result : First class, CGPA: 3. 08 in the scale of 4.00 Name of Institute : Rajshahi University of Engineering and Technology (RUET) Year of Passing : 2004

Darul ihsan university,dhaka,bangladesh
2007 - 2008Master of business administration mba in marketingActivities and Societies: MBA in Marketing Result : First class, CGPA: 3. 88 in the scale of 4.00 Name of Institute : Darul Ihsan University (DIU) Year of Passing : 2008

Rajshahi govt. city college,bangladesh
1997 - 1998Higher secondary certificate(hsc) scienceActivities and Societies: H.S.C. (Science) Result : First Division (736 Marks) Name of Institute : Rajshahi Govt. City College. Board : Rajshahi Year of Passing : 1998.

Seroil govt. high school, bangladesh
1991 - 1996Secondary school certificate(ssc) scienceActivities and Societies: S.S.C (Science) Result : First Division (758 * Marks) Name of Institute : Seroil Govt. High School. Board : Rajshahi Year of Passing : 1996
Experience

Power trade engineering ltd
May 2004 - Sept 2005Site and project engineer (project manager) in teletalk,aktel & bangla link projectProject: Teletalk,Aktel & Bangla Link Position: Site and Project Engineer (Project Manager)Job Responsibilities: • New sites Implementation scopes define of the monthly assign sites. Managing a group of Engineers & ASP’s of about 08 to 15 for Implementation, dismantle & refurbish to simply the work. Allocate supervisor for supervise installation work in accordance with applicable instructions for handling, assembly, wiring, checking and work environment. • Installation, Testing & Commissioning of RBS & TX.• Prepare weekly activity reports/activity prediction for customer. Show less

Ock setia engineering sdn. bhd, malaysia
Oct 2005 - Apr 2006Commissioning engineer & document controller in gp-ericsson projectProject: GP-Ericsson Project Position: Commissioning Engineer & Document Controller Job Responsibilities: • Installation, Testing & Commissioning of Ericsson RBS 2000 family such as (RBS 2206, 2206 V2, 2106).• Responsible for MW Installation, Testing & Commissioning (Ericsson,NEC, Siemens transmission equipment)& PCM through.• Also control & prepare all site related document.

Lm ericsson bangladesh ltd.
May 2006 - Nov 2008Project:Warid Project Phase 1A,1B,1C & 1E Position: Project co-ordinatorResponsibilities:• New sites Implementation scopes define of the monthly assign sites. Managing a group of Engineers & ASP’s of about 08 to 15 for Implementation, dismantle & refurbish to simply the work. Allocate supervisor for supervise installation work in accordance with applicable instructions for handling, assembly, wiring, checking and work environment. • Flow up with TI supervisor for perform various type of testing such as performance test, BER test, interference test, Battery backup test, VSWR & DTF test.• Flow up with TI supervisor for troubling shooting of Receiver diversity, RF loop test fault, TX saturation fault, High SSI value, TMA fault, Climate control unit (CCU) fault of RBS 2106i and Climate unit (CLU) of BBU 9500i, and any fault identify by OMT.• Flows up with TI supervisor for rectify Internal and external alarm problem, Trouble shooting on system failure at site as failed to operate.• Prepare report for internal customer. Show less Project: Warid Project Phase 1A,1B,1C Position: Senior Telecom supervisorJob Responsibilities: • Prepare weekly activity reports/activity prediction for customer.• Installation, Testing & Commissioning of Ericsson RBS 2000 family such as (RBS 2206, 2206 V2, 2106).• Installation & Commissioning of different types of Battery Backup Unit (BBS 9500, BBS 9500i, PBC6500, PBC02).• Perform various type of testing such as performance test, BER test, interference test, Battery backup test, VSWR & DTF test.• Troubling shooting of Receiver diversity, RF loop test fault, TX saturation fault, High SSI value, TMA fault, Climate control unit (CCU) fault of RBS 2106i and Climate unit (CLU) of BBU 9500i, and any fault identify by OMT.• Rectify Internal and external alarm problem, Trouble shooting on system failure at site as failed to operate.• Quality Audit (Civil and TI part) before acceptance any site.• Performing PAT (Provisional Acceptance Test) & handle every sort of document for handover the site to Operator.• Perform the Traffic Routing of new sites. Show less Project: Warid Project Phase 1A,1B,1C Position: Telecom supervisorJob Responsibilities: BTS : • Installation, integration & Commissioning of BTS (RBS2206, 2106, 2106i) & Katherine sectored antenna at different BTS sites.• Installation of TMA, antenna tilting and orientation to ensure effective coverage, • Site Installation Test, Visual Installation test, Checking MDB. • Cable Loss, Bell Test, VSWR, DTF, DTF Return loss measurement using Site master,Transmission: • Installation, Operation and Commissioning of Ericsson PDH Minilink-TN. • Installation, Operation and Commissioning of Marconi SDH link.• Site Acceptance test, Loop test, Maintenance & Troubleshooting. Show less
RAN Implementation Coordinator in Warid Project
Sept 2007 - Nov 2008RAN Senior Telecom Supervisor in Warid Project
Jan 2007 - Aug 2007RAN Telecom Supervisor in Warid Project
May 2006 - Dec 2006

Lm ericsson kenya ltd.
Dec 2008 - Sept 2009Ran implementation coordinator in orange projectProject: Orange Project_ KenyaProject co-ordinatorResponsibilities:• Implementation scope simplify of the total project. Present forecasted execution plan, time line, resource plan & costing .Managing a group of Engineers & ASP’s of about 08 to 15 for implementation, dismantle & refurbish to simply the work. Allocate supervisor for supervise installation work in accordance with applicable instructions for handling, assembly, wiring, checking and work environment. • Synchronization with respective department• Flow up with TI supervisor for installation, Testing & Commissioning of Ericsson RBS 2000 family such as (RBS 2206, 2206 V2, 2106, 2216, 2116, 2308, 2309).• Flow up with TI supervisor for perform various type of testing such as performance test, BER test, interference test, Battery backup test, VSWR & DTF test.• Flows up with TI supervisor for rectify Internal and external alarm problem, Trouble shooting on system failure at site as failed to operate.• Flow up with TI supervisor for performing PAT (Provisional Acceptance Test) & handle every sort of document for handover the site to Operator. Show less

Lm ericsson bangladesh ltd.
Oct 2009 - Dec 2009Ran implementation coordinator in axiata(robi) projectProject: Axiata (ROBI) ProjectPosition: Project co-ordinator(Implementation , Dismantle & Upgradation )Responsibilities:• Plan, allocate staff and supervise installation work in accordance with applicable instructions for handling, assembly, wiring, checking and work environment. • Demonstrate and give installers instructions about installation activities. • Directly in contact with Civil Works, RF (Planning and Optimization), Transmission Network Design, RBS Integrator, Radio Installation Engineering, Radio Installation Team (Service Provider) and Logistics for a smooth roll out of the project. • Flows up with TI supervisor for prepare weekly activity reports/activity prediction for customer.• Flow up with TI supervisor for Installation, Testing & Commissioning of Ericsson RBS 2000 family such as (RBS2202, RBS 2206, 2206 V2, 2106, 2216, 2116, 2308).• Flow up with TI supervisor for to perform various type of testing such as performance test, BER test, interference test, Battery backup test, VSWR & DTF test..• Flow up with TI supervisor for quality Audit before acceptance any site. Show less

Lm ericsson bangladesh ltd
Jan 2010 - Aug 2010Ran implementation manager in warid projectProject: Warid Capacity Expansion Project Position: Implementation ManagerResponsibilities:• Prepare project plan with time line and resources mapping for project.• Assign Ericsson certified ASP companies for implementation, monitor their service quality, evaluate performance, reject those who are below quality. • Work with solution, IE dept. for preparing TI material BOQ for ordering.• Generating PR, PO, and MBC for supplier and ASP according to site BOQ. • Give instruction and supervise during work ongoing on live network (MW HUB sites, BSC, MSC) where the disturbance in customer premises is high.• Attend meetings with the Customer to re-solve installation, material, Power, CW and engineering related issues on weekly basis.• Bridge RND, TND, IE, logistics, BSC, MSC group with RAN for smooth integration process. • Work on clearance of PAC, FAC from customer. Checking and monitoring different type of survey reports (PSS, TSS, TSSR, RSID, and RSDD). Show less

Lm ericsson bangladesh ltd.
Sept 2010 - Dec 2010Ran implementation manager in airtel projectProject: Airtel EGSM Project Position: Implementation ManagerResponsibilities:• Prepare implementation scope of the total project (EGSM 900 frequency conversion) in very short time with limited resource. Calculate execution plan, critical time line, limited resource plan & costing.• Assign Ericsson certified ASP companies for implementation, monitor their service quality, evaluate performance, reject those who are below quality. • Work with solution, IE dept. for preparing TI material BOQ for ordering.• Generating PR, PO, and MBC for supplier and ASP according to site BOQ. • Give instruction and supervise during work ongoing on live network (MW HUB sites, BSC, MSC) where the disturbance in customer premises is high.• Attend meetings with the Customer to re-solve installation, material, Power, CW and engineering related issues on weekly basis.• Bridge RND, TND, IE, logistics, BSC, MSC group with RAN for smooth integration process. • Work closely with Managed operations/Acceptance group for generating PAT checklist, acceptance procedure and schedule for site handover to customer.• Responsible for the mentoring, transfer of knowledge to team leaders and engineers related with the project. Technical and site solution content quick support in any situation• Send daily project update to internal and external customer. Show less

Senior implementation manager
Jan 2011 - Dec 2013Ran implementation manager in airtel projectProject: Airtel MC Project Position: Experience Implementation ManagerResponsibilities• Prepare proper project plan and define implementation scope of the total project. Present forecasted execution plan, time line and resource plan.• Find dependencies in site completion, risk analysis, material call off, ASP selection and evaluation, define ASP scope, ASP training and price fixation. • Warehouse material management, Telecom and local installation material mapping, PR/PO processing, checking daily delivery stock of warehouse.• Co-ordinate to synchronize all project departments (BSC,NOC,RF, TX, CW, TI, IE, Doc etc) for smooth transition of information for site implementation according to plan.• Responsible for the mentoring, transfer of knowledge to team leaders and engineers related with the project Ensure site implementation quality with optimize price to customer.• Listen and give solution in customer complain regarding equipment performance, service etc. • Technical and site solution content support in any situation.• Preparation of project rollout tracker, update tracker and reporting tracker daily basis. Show less

Lm ericsson bangladesh ltd.
Jan 2012 - Nov 2014Senior implementation managerProject: ROBI 3G Project Position: Senior Implementation ManagerResponsibilities• Prepare proper project plan and define implementation scope of the total project. Present forecasted execution plan, time line and resource plan.• Find dependencies in site completion, risk analysis, material call off, ASP selection and evaluation, define ASP scope, ASP technical & OHS training, and price fixation. • Warehouse material management, Telecom and local installation material mapping, PR/PO processing, checking daily delivery stock of warehouse.• Co-ordinate to synchronize all project departments (RNC,SOC,RF, TX, Infra, TI, IE, Doc etc) for smooth transition of information for site implementation according to plan.• Responsible for the mentoring, transfer of knowledge to team leaders and engineers related with the project Ensure site implementation quality with optimize price to customer.• Listen and give solution in customer complain regarding equipment performance, service etc. • Technical and site solution content support in any situation.• Preparation of project rollout tracker, update tracker and reporting tracker daily basis. Show less

Robi axiata limited
Nov 2014 - nowSenior techno-commercial manager (functional role)Project Governance, Budget Management. Quality Management , Material Management & Vendor Management.Position: ManagerResponsibilities• End to End all project planning & follow up, ROC Management and Edotco Governance
Licenses & Certifications

Project management foundations
Jun 2017
Project management: government projects
Jun 2017- View certificate

Developing a learning mindset
LinkedinSept 2019 - View certificate

Developing your professional image
LinkedinSept 2019 - View certificate

Coaching skills for leaders and managers
LinkedinSept 2019 - View certificate

Project management: iterative methods
LinkedinSept 2019 - View certificate

Delivery tips for speaking in public
LinkedinSept 2019 - View certificate

Building professional relationships
LinkedinSept 2019 - View certificate

Lead like a boss
LinkedinSept 2019 - View certificate

Project management foundations: schedules
Lynda.comAug 2017
Languages
- enEnglish
Recommendations

Hannah ovcharchyn
Investigative Assistant at DuPage County State's AttorneyGreater Chicago Area
Dimitrios kokkalis
OWNER at D. KOKKALIS EngineeringGreece
Kellen macedo
Analista de Adm de Pessoal na Agrichem do Brasil S.ARibeirão Preto, São Paulo, Brasil
Aurélien pouxviel
Data Scientist @ CegidFrance
Laszlo kiraly
CMO & Co- founder SMILEEYES GROUPLeipzig, Saxony, Germany
Jennifer schreiner
Clinical Audiologist at South Texas VA Health CenterSouth Texas Veterans Health Care System
Gaurang singh
Driving Digital Growth: Experienced SEO Executive Ready to Optimize Your Online PresenceNoida, Uttar Pradesh, India
Cyril augustine
Personal Banker | Customer Satisfaction | Mobile Applications | Sales | IFIC CertifiedCambridge, Ontario, Canada
Angel roberts
Administrative Office AssistantLumberton, Texas, United States
Dorothy ann cross
Project Manager at Charles Cross ArchitecturePhiladelphia, Pennsylvania, United States
...