Eko Suharwanto

Eko Suharwanto

Utility Supervisor

Followers of Eko Suharwanto1000 followers
location of Eko SuharwantoWest Java, Indonesia

Connect with Eko Suharwanto to Send Message

Connect

Connect with Eko Suharwanto to Send Message

Connect
  • Timeline

  • About me

    Sustainable Engineering

  • Education

    • Jakarta Fisheries University

      1997 - 2001
      Bachelor's degree Mechanical Engineering

      Activities and Societies: 1. Basket Ball Team 2. Tapala (Taruna PEncinta Alam) 3. Team Lari Api Pon tahun 2000

    • SMA Negeri 1 Kota Bekasi

      1994 - 1997
      Natural Sciences
  • Experience

    • PT. Fresh On Time Seafood

      Jan 2005 - Feb 2009
      Utility Supervisor

      PT. Fresh On Time Seafood is a food company with their products such pasteurized crab meat canning and all of frozen seafood.As utility and engineering Supervisor i handled the unit all of the utilities machine which care of the operation production well such as:• Boiler Cap 2000 kg• Pasteurized refrigration machines ( single step bitzer compressor @ 10 HP)• Frozen refrigation machines ( single step bitzer compressor @ 15 HP)• Refrigrated Containers (single step carrier compressor @ 7,5 HP)• Chill refrigated room ( single step Bitzer compressor 7,5 HP)• Semi Contact Frezer cap.2000 kg ( 2 stage Bitzer Compressor 30 HP)• Diesel Generator Setting (Cummins Diesel with Stamford Altenator @350KVA)• Air Compressor @10 HP• Water threatment system and PumpsThe other side as my position as the Supervisor, i make dailly,weekly,monthly and yearly for maintaining schedule in order all the unit can operate properly and reducing broken point unit and costing for buy the hard spare part. I create all the Journal reading every hour for controlling the pressure,temperature and checking level Fuel Boiler, Softener water tank, Sendimentation Tank and Main Tank for Supply. Show less

    • W Hotels

      Feb 2009 - Feb 2010
      Sr.HVAC Tecnician

      The maintenance of engineering departement in Hotel handle of consumen complains from the user of departement until guest home. As the Ac Engineer, i controll of the refrigated machines condition such as the chiller,FAU (Fan Air Unit),AHU (Air Handling Unit),all the cold storage Unit and Ice Cube Maker. As the senior Staff i make the maintaining schedule all refrigated unit to cleaning evap filter, cleaning Condensing, Cleaning Water Strainer (for AHU), checking the V-belt, and also making the dailly journal (Reading Temperature) for Cold storage,Main Chiller,and refrigated machine for wine chiller and undertable chiller. For main chiller, we have 6 unit chiller, 1 chiller theres 4 unit compressor (@70 horse power each compessor power) and are equipted with 6 primary pump for flow out the cold water from chiller to building (the average temperature between 50C -7,50C, we called this Supply) and 3 unit Secondary pump for flow in the cold water from building to main Chiller (the average Temperature between 90C-110C, we called this return). But in condition the air is not difficult to exchance become normal air, we have FAHU (fresh Air Handling Unit).In this Unit the outside air we handle be Supply fresh Air. All the conditioning air system we can controll all the temperature with the BMS (Buiding Management System), eventhought so many kind of funtion of BMS using. The other side at Kitchen Equipment, there are 14 cold store for SpiceMarket Kitchen, 10 cold store unit for Green Room Kitchen,15 cold store for Market kitchen, 15 cold store for main kitchen, 2 unit for Pastry and 3 unit for beverage store. Show less

    • PT. Yupi Indo Jelly Gum

      Jul 2010 - Apr 2013
      Sr.Utility Technical Supervisor

      PT. Yupi Indo Jelly Gum is company which producing Gummy Candy In Indonesia. The Factory has some certificates to supporting their product , such as ISO 22000 and HACCP for safety food and issues GMP (Good Macufacture Production) standard for their rules of production.In this Factory My Position is as the Utility Supervisor (At Engineering Department) that has a responbility to maintain all the Utility Machine on the good condition and can be run properly.I handle all the utility system to support the production and beside my field job, i also work to input the progress done and incoming plan such as Log Book, Materials need and shift schedule and reported to my Engineering Manager. Production operate 24 hour fully eventhough holiday and it mean utility is never stop controlling the auxiliary engine.The utilitas/Auxiliary engine and the scope are:1. HSD Fuel Boiler, Maxiterm 1000 kg and 2000 kg @1 unit2. Natural Gas Boiler, Maxiterm 3200 kg @ 1 unit3. Coal Boiler, Alstoms 5000 kg@1 unit4. Large AC, Chiller unit with Carrier compressor and AHU@26 unit5. Small AC, Split AC and Cassete AC6. Screw Air Compressor “Atlas Copco” GA55, P7Bar@6 unit7. Air Drier @6 Unit8. Generator Setting 500 Kva @8 unit9. Water Threatment Plant system10. Pump And Plumbing Show less

    • Club Med

      May 2013 - Aug 2015

      After more than 1 year i have completed to lead Technical Department at Cherating-Malaysia, my Management for Regional Asia office at Singapore gave me the affectation to request me leading and Assist Technical department at Club Med Bintan Islands-Indonesia. As the Asst. Chief Engineeeing except to make a good Achieve for our department, I do to make a schedule for E-Crystal Audit such as collect all the data that have related with the safety and hygine (at food Factory we are more familiar with HACCP). The data that be collected like preventive Maintenance,sample water and hygiene at the kitchen and Restaurant. I have to concern and focus to do refresh the guest Room and scheduling in order we get the optimal target. Show less

      • Asst. Technical Service Manager

        Jul 2014 - Aug 2015
      • Asst.Technical Service Manager

        May 2013 - Jul 2014
    • Hotel Horison Bekasi

      Aug 2015 - Dec 2017
      Chief Engineering

      Hotel Horison Bekasi is one of famous and Credibility Hotel in Bekasi Area especially on Bekasi Barat circle Area which dominanted by Star Hotels. Hotel Horison is 4 stars Hotel that have 266 rooms (100 rooms on extention area), 1 Ball Room (on this end of october will be lunching the another Ball Room at 10th Floors next to Metsky Restaurant. Hotel Horison Bekasi also provide parts of small and Medium Meeting Room that be specialled for Government event/meeting.As Chief Engineer at Hotel Horison Bekasi has a similar Job Describtion such as the the another Hotel normally.1. Rensposible to GM anything about technical System.2. Create a new program Fix and Refresh the rooms3. Start to do the fabrication and project with our teams (like make a vertical garden, Hi Cloudly Bar at Metsky, etc)4. Controll and Handle the Quality Of Target for Engineering Team5. Controll and Monitoring the Electricity Cost 6. Rensponsible to make an annual budgeting and Capital Expenditure Show less

    • Bawah Reserve

      Jan 2018 - May 2023

      Goverment Of Indonesia Has declared that Pandemic was over and Open for Traveling both of local and International. I have Promoted as Asst DOE when Bawah was busy to preparing the REOPENING. Pulau Bawah will Reopening on August 2022 and Pulau Bawah will Grand Opening On September 2022. I have Focussed with Pulau Elang because Pulau Bawah will be Handled by My Assistant Chief Engineer (before My DOE arrive in island). I have did extra Monitoring for Solar Panel Operational because during Pandemic we only distribute the Minimum power and this time to overview when we use the Maximum capacity. Generally we used 18 floating Platform solar Panel with 1 platform has 65 Panels which has 365 wph Power each Panel. our Plant also equipped by 455 KW lithium Batteries as the Back Up by Samsung Company and Inverter by Huawei. if the Sun have a great shine so from the Morning (totally 6-7 Hour) we use fully with Solar Panel Plant and Generator Diesel Will be Off. if the Sun is Low Shine and Solar Panel will syncrone with Batteries to distribute our electricity Consume. when The Batteries is down also so the system will Call the Generator to running and Auto load for Our Electricity Consume. Maintenance Operation for Solar Panel is Very Easy, the simple Thing we just need to watch the Pysical solar Panel such as from the cracked. Except the Floating Platform Panel we Provide also the Back Up Solar Panel around Staff Accommodation. We Install the Panel at Roof Staff Housing. Total Power capacity in Roof Panel around 135 Panels (more than 50 Kwph). Show less just several Months after my Promotion the Pandemic covid 19 influenced the world disasters. The resort was not Reserving the guests but several Employees still hire to maintain the resort including my Self. I was in charge for Director Engineering to do hotel property maintenance and supervise the Project. we renovated the several villas as upgrade with own pool, Project Installation Additional Our Sea Water Reverse Osmosis 100 CMD, project Installation Floating Solar Panel with has power 450 KW and Pulau Elang Resort Project. Actually Pulau Elang Was built before pandemic but still have many Revise from the Owner. Pulau Elang Has 6 Residence Villas, restaurant with Private Bar, Swiming Pool and SPA Treatment. Show less The luxury Resort Concept with 11 Suite Water Villas, 21 Deluxe Beach Villas and 3 Deluxe Garden Villa. We Reserve the natures around the Jungle, Beachs and Sea. We Are producing our fresh water from Sea Water with RO technology. We Maintain also our Local Sewage in order to be use as The Recycling water as the garden consuming and Toilet Flaushing. The Electricity power also has sourced by Generator Setting with Mic fill Filter Technology that not to replace oil not reguraly every 250 Hours but We Replace in every 1200 Hours. Our Engineering Department also maintain the Boats for Activities Sport mostly for Water sport Activities such snorkling and Diving. Show less

      • Assistant Director of Engineering

        Aug 2022 - May 2023
      • Chief Engineering

        Jan 2020 - Jul 2022
      • Asst Chief Engineering

        Jan 2018 - Jan 2020
    • PT. ABDI KARYA

      May 2023 - Feb 2024
      Project Manager

      PT. Abdi Karya is one of service company that move on water plant production such as water treatment plant, sewage water treatment plant, waste water treatment plant, sea water reverse osmosis, brackish water reverse osmosis, ultra filtration treatment. My Role as the Project Manager.1. Design the Water treatment concept for propose to main contractor or direct company which is need our service.2. Looking For manner and train them for alocate them as the technician to maintain the property that user request.3. Looking for Suitable material or Spareparts in general market and consindering with Online Market before deside to buy for continously.4. Make schedule for team roaster and they should give for daily and monthly report.5. Arrange to do water check inspection to Laboratory (Succofindo/Surveyor Indonesia) every 6 Month.6. Conduct the Meeting Report for our work Performances to the Customer. Show less

    • TA'AKTANA, a Luxury Collection Resort & Spa, Labuan Bajo

      Mar 2024 - Aug 2024
      Chief Engineer

      Preparation Team for Opening Property such as operational preventive maintenance, check list table for reading meter and monitoring, Training team for operational equipments such as RCU (Remote Controll System) and BMS (Building Management System. Currently we still have many coordination with vendor/Main contractor for the deffect list and also additional facilities for maintenance activities. Luxury Collection Labuan Bajo Has 45 Room Building, 17 Standard Villas with Own Private Pool, 7 Sea Water Villas and 1 Residential. Another Facilities such As 3 Restaurants, Main pool, Olympic Pool and Kid Pool, Gym, SPA, Meeting Room, Wedding Hall, Library, Coffe Corner, Pool Bar, Beach Bar and Sea Port Jetty For Island Hopping. For a moment Engineering Manner we have 6 General Technicians, 3 Pool Attendant , 1 Engineering Admin, Chief Engineer and Director Of Engineering. My Role as Chief Engineering will report to Director Of Engineering. Show less

    • Metland

      Sept 2024 - Oct 2025
      Cluster Chief Engineer
    • Cap Karoso

      Oct 2025 - now
      Director of Engineering
  • Licenses & Certifications

    • Ahli K3 Umum

      Kementerian Ketenagakerjaan Republik Indonesia
      Oct 2020
    • ServSafe Food Handler

      ServSafe Food Protection Manager Instructor
      Apr 2024
    • Ahli K3 Thermography

      Ministry of Energy and Mineral Resources (ESDM)
    • Fishery Vessel Engineer class 1

      Ministry of Transportation Republic Indonesia
      Jul 2001
  • Volunteer Experience

    • Team Support Logistik

      Issued by Yayasan Metland Peduli on Oct 2016
      Yayasan Metland PeduliAssociated with Eko Suharwanto