Md Farhan Alam

Md Farhan Alam

Supervisor

Followers of Md Farhan Alam388 followers
location of Md Farhan AlamTabuk, Saudi Arabia

Connect with Md Farhan Alam to Send Message

Connect

Connect with Md Farhan Alam to Send Message

Connect
  • Timeline

  • About me

    Electrical QA/QC Engineer at Air Products

  • Education

    • Maharshi Dayanand University

      -
      Bachelor of Technology - BTech Electrical and Electronics Engineering
    • Jamia Millia Islamia

      2004 - 2006
      10+2 PCM
  • Experience

    • ETA Engineering Private Limited

      Apr 2007 - May 2009
      Supervisor

      Job Responsibilities - Monitor Daily/Weekly/Monthly Progress Generate, Daily/Weekly/Monthly Activity Report as per project specifications. Review of engineering documents/Drawings with Engineers. Preparation of Installation Earthing, Lighting & Cable Tray Layouts. Preparation of Installation of Transformers, Motors, Generators and Electrical equipment’s. Installation of Support for tray and Lightings. Supervise the work of electrician and worker and ensure them to use proper safety ppe’s during the work. Responsible for laying of power and control cable, cable glanding and cable termination. Performing other duties such as reporting job completion and any problems encountered to engineer, obtaining tools and spare parts from warehouse. Observed all safety and loss prevention procedure, and exercises good housekeeping practice, keeping workshop and job sites clean and tidy. Obtain required work permit and particular care attention prior to work. Show less

    • Excel Control Linkage Private Limited

      Dec 2012 - Dec 2013
      Graduate Engineering Trainee

      Chief Tasks Handled Plan and schedule projects, estimate time and materials, supervise subordinates. Maintain records and files and prepare reports. Plan and supervise the work of electricians. Plan and estimate electrical jobs. Maintain records on electrical jobs and assign to appropriate personnel. Assist in coordinating job assignments with the other trades, e.g., plumbers, Carpenters, etc Assist contractors on jobs. Maintain knowledge of electrical materials in warehouse. Advice coordinator and assistant director of technical problems concerned with modification and repair of electrical assignments. Change notes for any required modification Show less

    • Vijai Electricals Ltd.

      Dec 2013 - Dec 2016
      QA/QC Electrical Engineer

      Responsibilities as QA/QC Electrical Engineer- Electrical Design including wiring diagrams, Selection of Electrical Equipment’s such as Circuit breaker, Cable sizing, Voltage drop calculations, Distribution board, Transformers etc. Material receiving inspection/storage and Preservation Installation of Power Generators, NGR, Switchgears installation and testing of Motors. As per Project Specifications Received Electrical materials visual inspection and storage Preservation. Material inspection based on international Standards. NEEMA, IEC, ASTM, ANSI/IEEE. Material items P.V.C. Conduits, HDG Conduits, Cable Tray and Fitting, Power and Control Cables. Distribution boards, Low Voltage and Medium Voltage Switchgears, Motor control Centres, LCS, UPS and Battery Charger Normal and Emergency Lighting Fixtures, Fire alarm materials, Building electrical materials and Building and Plant Telecom materials (Telephone, PAGA system, CCTV, LAN & Radio system). Switchgear and Motor control centre function test with Vendor: • Bus bar Conductivity and hi -pot test. • CT/VT Polarity and Ratio test. • CT/VT Insulation and winding Resistance Test. • Function test of relay protection. • VCS and VCB Contact Resistance test. • Function test of VCB, VCS and Earth Switch. Responsible of Preparation of Bill of Quantity of material for Supply, Testing and Commissioning of projects. DB, SMDB, MDB, MCC Load Scheduling. Sizing of Transformer, Capacitor Bank, Standby Generator. Internal wiring of Building along with Fire detection system. Installation of LT Panel, Synchronization of Panels, Including Copper/ GI Strip Earthing. Installation of Distribution Board Internal Wiring of Raw power & Lightning. NGR installation and Insulation Resistance test, final visual inspection, 33KV Switchgear installation inspection and function test with Vendor. Show less

    • Saudi Services For Electro Mechanic Works co. (Closed Joint Stock Company)

      Jan 2017 - Dec 2024

      Construction Of Shoibah SWCC-2 380KV Substation (SHB SWCC-2) And Expansion Of Existing Modon BSP & S-IWPP Substation.Client: Saline Water Conversion Corporation (SWCC)Consultant: Saudi Electricity Company (SEC).• Review Daily Progress Report & Three Week Schedule and submitted to Client.• Installation of Gas Insulated Switchgear (GIS)• Installation of all Control & Protection Panels and lighting system as per approved drawings.• Installation of Cable Tray, Grounding System, Lightning Protection System.• Responsible for any type of correction / modification made in the IFC Drawings as per requirement at site has to notify the same in As-Built drawings. Show less 550MW Duba green solar integrated Combined Cycle Power Plant. GE frame 7FA.04 & 7FA.05 GTGs. 385MVA STG and integrated 50MWe CSP Generation project.Client: Saudi Electricity Company.Consultant: Tractebel Engie (Saudi Arabia)• 02 No’s of Gas Turbine 7F.04,7F.05 (General Electric)• 380/132 KV Gas Isolated Substation (GIS) System.(ABB/HUUNDAI)• 3 No’s of Transformers 250MVA (HYUNDAI )• 26 No’s of total MV & AUX Transformers. (HYUNDAI)• BSDG 1X10 MW.( ALEXMAR)• 150 No’s of 13.8/4.6 KV Switch Gears. (Siemens).• Isolated Phase bus duct (IPBD), SPBD’s & NSBD’s 18/13.8/0.48 KV.(ALFA STANDARD/AZZ)• Review Daily Progress Report & Three Week Schedule and submitted to Client.• Installation of all Control & Protection Panels, Aux. Transformers and lighting system as per approved drawings.• Installation of Cable Tray, Grounding System, Lightning Protection System.• Installation of Cathodic Protection system for fuel and water tanks.• Responsible for any type of correction / modification made in the IFC Drawings as per requirement at site has to notify the same in As-Built drawings. Show less

      • QA/QC Electrical Engineer

        Oct 2021 - Dec 2024
      • QA/QC Electrical Engineer

        Jan 2017 - Sept 2021
    • Air Products

      Feb 2025 - now
      Electrical QA/QC Engineer

      NEOM GREEN HYDROGEN PROJECT (NGHP)Construction of Wind Farm 380kV Switching Substation and 380kV OHTLs connecting the 380kV Load Substation at HyLIOS Green Hydrogen Plant with Wind Farm 380kV Switching SubstationClient: Neom Green Hydrogen Company (NGHC)

  • Licenses & Certifications

    • SCE

      Saudi Council of Engineers
      Jul 2020
      View certificate certificate
    • Certified Quality Inspector (CQI)

      Saudi Electricity Company