Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, Electrical

Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, Electrical

Site Electrical Engineer

Followers of Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, Electrical13000 followers
location of Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, ElectricalDoha, Qatar

Connect with Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, Electrical to Send Message

Connect

Connect with Abhishek Goyal B.E-E.E (WES), MBA (WES), PGDBA, Electrical to Send Message

Connect
  • Timeline

  • About me

    Project Manager , Sr. Consultant, Testing & Commissioning Lead, Lead Electrical Engineer

  • Education

    • RIET - Rajasthan University

      2002 - 2006
      B.E Degree 4 Years Electrical Engineering Approved from WES Canada 70%

      Activities and Societies: Volunteer in college Tech festival. I have 4 years regular engineering degree in Electrical branch. I have done some below technical Summer Training related to Electrical field: • Summer training in N.T.P.C Dadri. • Summer training in B.H.E.L Bhopal. • Rajasthan Rajya Vidyut Prasaran Nigam Limited, 220Kv grid sub-stations Jaipur.

    • PIMSR Mumbai

      2010 - 2012
      Master of Business Administration (M.B.A.) Business & Marketing Management Approved from WES Canada A+

      Activities and Societies: Volunteer in college festival (Nirmiti) I have 2 Years Regular MBA degree in Marketing Management from Mumbai University. I have also sound knowledge about finance department related to costing, billing and accounts.

    • Symbiosis (SCDL), Pune

      2007 - 2009
      PGDBA Operation Management

      Activities and Societies: Debates & Quiz etc. I completed 2 years distance program course in Operation Management and i obtained 2 years PGDBA degree from Symbiosis Pune.

  • Experience

    • ABB

      Aug 2006 - Jan 2007
      Site Electrical Engineer

      Survey and proposal of drawing of existing lines, Survey Report preparation, Erection, Testing & Commissioning of 11/33/132kV lines of LVDS system and 3-phase transformers with proper safety and quality and planning as per our client R.S.E.B. requirement .Planning of old feeder 11/33 kV HT line & 230 Volt LT line change into new layout single line drawingEstimation the required total quantity of materials.Controlling of man power and maintain the documentation & checklistControlling of quantitative & qualitative problem of electrical equipment. Show less

    • BC Jindal Group

      Apr 2007 - Feb 2009
      Electrical Engineer (E & I)

      Installation, T&C, Maintenance and Operation of 11/132kV Substation, transformer, HT/LT breakers, motors, VFD, PCC/MCC panel, ETP and utility plant.Commissioning, Maintenance & troubleshooting of LT & HT motors (Compressors , Pumps, Fans, Blowers etc) ,6.6KV/415V with various manufacturers like ABB, Siemens, CGL, Bharat Bijli etc. Well versed in Hazardous area classification in context with a Chemical Plant.Interpretation of different wiring schemes & there implementation. Attended the various FAT of HT/ LT switchgear panels at Siemens and L&T. Maintenance & troubleshooting of Battery charger (Make –Mastech), Batteries (Ni-Cd, VRLA, Make - HBL). Maintenance & troubleshooting of TATA Liebert, Gutor, Hi-Rel make-UPS system. Installation, commissioning and maintenance of Carriers make chiller, VFD (ABB, Siemens, Danfoss, Yaskawa, Allen Bradley), air compressors & Instrument equipment like pressure transmitters, level transmitters, flow meter, RTD, gauges etc. Show less

    • Ziemann Holvrieka

      Feb 2009 - Aug 2010
      Site Electrical Engineer (E & I)

      HT Switch Board with validation, scheme checking & Auto/Manual change over facilities with 2 I/C and 1 B/C. Handled project work of electrical & instrumentation equipment.Planned and managed job distribution with German people for smooth working of operation.Controlled man power, Contractor, machine, store stocks & indents.Planning and implementation of project work & predictive project schedules.Maintained and monitored the documentation & checklist.Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments.Responsible for Project of Electrical Equipment’s like Transformer 33KV/440V, LT/HT MCC Panel, LT Motor, LT/HT Circuit Breaker, VFD, LV/MV Switchgear Equipment & Panels etc. Show less

    • BC Jindal Group

      Aug 2010 - Jun 2012
      Electrical Engineer (E & I)

      The manufacturing plant at Nasik, Maharashtra is the world's largest facility for the production of BOPET and BOPP films.Planning and execution of installation, commissioning, maintenance & testing work of PCC/MCC panel, motor, switchgears, generators, field equipment, VFD, UPS, AC/DC drive and cable laying work. 31.5 MVA & 2.0 MVA Transformers & which includes all transformer testing, HT feeder scheme checking for transformers, marshalling box operations, transformer fault simulations, transformer stability checking, etc.Formulate strategies for the projects planning, detail engineering like verifying and studying of single line and scheme drawings of all switch gears, preparation of pre-commissioning check lists, data sheet review, technical projections and vendor management. Planning and execution of erection, installation & commissioning work of L&T and Siemens make LT & HT breakers, MCC and PCC.Maintenance and operation of transformer, HT/LT breakers, LT/ HT motors, EOT crane, ETP and utility.Well versed in Hazardous area classification in context with a Chemical Plant.Engineering, designing and selection of cables, Motors.Monitor work execution and providing guidance and technical advice on Safety, Quality, Operations & Maintenance of the Plant Equipments to ensure conformity to statutory and company regulations. Maintaining the Quality standards (ISO 9001 and ISO 14001) and using SAP operational tool.Identifying the trouble and trouble-shooting the same, completing the why-why analysis. SAP MM module for controlling inventory, managing material, estimating consumption & ensuring the availability of material for timely completion of projects targets and Proactive / Preventive maintenance. Show less

    • Sikraft Infotech Pvt Ltd.

      Jul 2012 - Jul 2014
      Lead Electrical Engineer/ Lead Project Engineer

      Leading the team of Electrical Installation, Testing & Commissioning for high voltage Substations, HVDC, SVC & Transmission Project (6.6–500kV) in Energy sector:A) Hiteen (KSA), B) Safinya (KSA), C) Eddy County (USA), D) Transpower (SVC PLUS Marsden, New Zealand) (Selected for Pre-commissioning Activities) E) ATCO & WATL Electric Canada 500kV HVDC F) 11/33/132kV- Transmission & Substation Project Siemens India • Leading the team of protection specialists and commissioning electrical engineers;• Development of Test Plan, Test sheets, protection philosophy for substations & Equipment’s;• Current Transformer and Voltage Transformer sizing calculations;• Preparation of technical data sheets for electrical equipment’s & protection systems in tender documents;• Calculations of relay protection settings & testing;• Review of suppliers' technical document’s, protection design documents, protection schematics, relay configurations;• Factory acceptance testing, site acceptance testing and site integration testing;• Assistance in preparation of substation interlocking logic and SCADA signal lists;• Preparation of electrical logic and Simatic TDC signal lists for HVDC & SVC System;• Preparation of electrical drawings & circuit diagrams for SVC Protection Panels. •Preparation of SLD & Protection coordination study documents for HVDC & SVC System. • Interface management for protection, automation, control and monitoring systems;• Investigation of high-voltage faults using relay disturbance records and technical reporting;• Testing of Non FPT Panels (DIGSI/ Omicron/ Meggar etc.) in Germany. Show less

    • Prime Electrical Contracting Company LLC UAE

      Aug 2014 - Jul 2015
      Site In-Charge/ Sr. Electrical Engineer

      Installation, testing & commissioning of substation equipment’s, relay protection, automation, control systems for high voltage substation, transmission and generation projects - 11/33/132 kV:Development of technical requirements for installation, protection & control systems;Revived design of electrical layout, Installation drawings & technical sheets;Development of Test Plan, Test sheets, protection philosophy for substations & Equipment’s;Design of substation interlocking logic and control philosophy;Providing field support during the procurement & construction phase; Providing P&C drawings modifications on-site;Developing the clearance plan and schedule for construction;Updating the drawings and providing as-built;Providing assistance to the on-site construction manager. Show less

    • IMCO Engineering & Construction Co . W.L.L.

      Aug 2015 - Jul 2019
      Site In-Charge / Senior Electrical Engineer

      Installation, testing & commissioning of substation equipment’s, relay protection, automation, control systems for high voltage substation, transmission and generation projects - 11/33/132 kV:Designed, Installation, Testing & Commissioning done of MV Switchgear Panels-(VCB, AIS), 3MW MV Pumps, MV VFD (Siemens- SINAMICS), MV Transformers, DG’s, UPS & Substations equipment’s. Development of technical requirements for installation, protection & control systems;Revived design of electrical layout, Installation drawings & technical sheets;Development of Test Plan, Test sheets, protection philosophy for substations & Equipment’s;Design of substation interlocking logic and control philosophy;Providing field support during the procurement & construction phase; Providing P&C drawings modifications on-site;Developing the clearance plan and schedule for construction;Updating the drawings and providing as-built;Providing assistance to the on-site construction manager. Show less

    • HBK Contracting Company W.L.L

      Jul 2019 - Feb 2024
      Commissioning Lead / Sr. Electrical Engineer / Project Management / Construction

      Leading an engineering teams and ensures the EPC contractor develops detailed design in accordance with local regulatory requirements, as per international standards, project contract and any approved variations. Coordinate and analyses discipline issues for resolution. Designed, Installation, Testing & Commissioning done of world 2nd biggest submersible pumps, VFD (ACS2000 ABB), 11kV MV Siemens Switchgear Panels, Transformers & 11kV 3MW MTU DG sets with 11kV Sync Panels. Review technical aspects of electrical equipment’s, review purchase orders with EPC Contractor and vendors in accordance with the roles and responsibilities stated in applicable contract(s) to ensure safe and seamless integration of electrical systems to the existing operating facilities.Leading construction team on site & giving guidance to site teams & EPC Contractor day by day activities to ensure key discipline deliverables, progress/milestones are met as per planning scheduled. Preparing hookup drawings, panel wiring drawings, method statements related to Installation, Testing & Commissioning of 3.3KV 3MW Motors, Transformers, 11kV panels, DG & GE VFD (MV7000) etc. Show less

    • GPEG FREELANCE

      Feb 2023 - now
      Freelance Electrical Specialist / Automation/ Consultant

      I have 17 years of solid experience in the electrical areas of Project Management/ Automation/ Consultant/ Installation/ Testing & Commissioning in EPIC Project, Oil &Gas, Water Pumping Stations, Data Center, Energy Field (HVDC Protection, SVC, Substations) Switchgears, UPS, Large Motors, Large VFD, Large Generators, Protection, Control & Automation Engineering / Design /On-site Management, besides others.

    • Chevron Phillips Chemical Company

      Feb 2024 - now
      Sr. Electrical Engineer - Ras Laffan Petrochemical Project

      Project Details: The 435-acre project site will include an ethane cracker with a capacity of 2080 KTA of ethylene, making it the largest ethane cracker in the Middle East and one of the largest in the world. It will also include two high-density polyethylene derivative units with a total capacity of 1680 KTA.Responsibility: My responsibility is delivery of project on time with high safety measures. I have to check daily activity on site (HV/MV & LV- Substations/ turnkey electrical equipment's) related to Construction, Installation, Pre-commissioning and Commissioning. Show less

  • Licenses & Certifications

    • PMP

      Chicago Training and Consultancy, Doha Qatar
    • SVC AND HVDC PROTECTION DESIGN AND INSTALLATION

      Siemens Erlangen Germany
      Jun 2013
    • SIEMENS LV AND HV EQUIPMENT INSTALLATION & MAINTENANCE

      Siemens Technology India
      Sept 2012
    • Master of Management Studies Canada

      World Education Services
      Sept 2014
    • SEA SURVIVAL OPITO APPROVED

      OPITO
      Mar 2018
    • PRINCE2® Foundation Certificate in Project Management

      AXELOS Global Best Practice
      Jul 2019
      View certificate certificate
    • Scrum Fundamentals Certified (SFC)

      SCRUMstudy - Accreditation Body for Scrum and Agile
      Aug 2019
    • PROFESSIONAL SCRUM MASTER 1

      Scrum.org
      Sept 2019
      View certificate certificate
    • PRINCE2 Agile® Practitioner Certificate in Agile Project Management

      AXELOS Global Best Practice
      Jul 2019
      View certificate certificate
    • Six Sigma Black Belt (CSSBB)

      6sigmastudy - The global certification body for six sigma certifications
      Jan 2020
      View certificate certificate
    • MV Switching Authorized Engineer

      Qatar General Electricity & Water Corporation (Kahramaa)
      Jul 2022
    • BE Electrical Engineering from Canada

      World Education Services
      Sept 2014
    • H2S OPITO APPROVED

      OPITO
      Mar 2018
    • Six Sigma Yellow Belt (SSYB)

      6Sigma Services
      Aug 2019
    • MMUP Engineer Registration (UPDA) QATAR

      Ministry of Municipality and Environment, Qatar
      Jul 2019
    • Work Permit

      QatarEnergy
      Jun 2016
    • THUET OPITO APPROVED

      OPITO
      Mar 2018
    • Kahramaa LOA Permit

      Qatar General Electricity & Water Corporation (Kahramaa)
      Jan 2019