Igor Povod

Igor Povod

Technical buyer

Followers of Igor Povod236 followers
location of Igor PovodMoscow, Moscow City, Russia

Connect with Igor Povod to Send Message

Connect

Connect with Igor Povod to Send Message

Connect
  • Timeline

  • About me

    Director

  • Education

    • Stupino School №1

      1971 - 1981
      Primary education

      Activities and Societies: Sport team - country sky, mathematic team. Permanent memeber of school sport team (swimming, biathlon), 1 year mathematical circle for young students, 3 years study of ballroom dances in Palace of Culture, dancing show in Сity holidays.

    • Russian State Technological University named after K.E. Tsiolkovsky (MATI)

      1981 - 1986
      Mechanic engineer acraft engine

      Activities and Societies: member of University sport team (swimming, country ski, jogging) member of City club of ballroom dances Learning of design development, metal-working technology, manufacturing of jet engine.

  • Experience

    • Mars

      Sept 1994 - Jun 2002
      Technical buyer

      Commercial support for the different projects:1. Investment projects - Organisation models, Scope of works into Gantt diagramm, Supplier's audit, Risks assessement, Requests for Quotation, Tender selection, Purchasing cycle, Follow up, Authority interaction.2. Supply chain project - substitution of import raw materials for domestic. Obtaining of vendor assurance through co-operation with local Suppliers, planning of technology development, leasing contracts under term the modern equipment in exchange to high quality by-products, HACCP installation on the place. Work in cross-functinal team with R&D, Engineers, Logistics and Operations. Show less

    • SUN Interbrew

      Jun 2002 - Dec 2004
      Technical development manager

      Renovation of brownfield. Development of design for small-batch production by LEAN concept, modification of brewery capacity from 1mln. to 3mln.hectoliters per year. Utilities integration (boiler house, fuel station, waste water treatment plant, NH3 cooling system, access railway). Obtaining of all permissive documents for site development, including an enhanced limit for Gas and Electrical power, object commissioning.

    • Valio Center Odintsovo

      Sept 2008 - Feb 2011
      Managing director

      I am in charge of the day-to-day management of the Company in accordace with the instructions and orders given by the Chairman of the Board and/ or the Executive Management Board.

    • MEGAPACK LLC

      Jun 2011 - May 2012
      Technical director

      Re-engineering of business processes in the technical department in touch of Director's board. Managing of investment projects under 'tern key' term: from business case to the order of pack materials. Installation of performance management system for energy recourses consumption. Providing of all requierments for co-manufacturing so products as: Pepsi, Adrinaline Rush, Hooch, GreenMe, Fanta, Cofola and etc.

    • Baltika Breweries

      May 2012 - Dec 2013
      Deputy Director -Chief Engineer

      Management of chief engineer department including the technical service team (40 employees), energy service team (42 employees), team of integrated control (3 employees), 3 spare parts engineers, 2 civil engineers and metrologist. Insuring of the smooth uninterrupted operation of the plant in line with production plan, providing of high quality of products in accordance to specification at the minimum cost of the business. Control of KPIs, managing of OPEX and CAPEX, budgeting, labor relation and motivation, planning of skills training and leader’s development. Project’s management: TPM (PM leader), Lean energy, SLA, HR future, Best Practice, Capacity increase.To provide that business is running in compliance with industry safety, labor safety, sanitary safety, ecology safety, fire safety as well as other requirements of the laws of the Russian Federation. Business includes the following departments: melt plant, brew house, bottling shop, Goods in & out, shops of granular dry sparging, pack manufacturing, power generated unit, deep wells and waste water treatment. Accomplishments- Built the new org.structure, decreased the staff from 111 to 93 employees due to redistribution of functions by the service level agreement and remote control of hazardous objects.- Improved energy consumption due to technical and organization actions, including the factor’s analysis, usage of recycling energy resources, expansion of automatic system of technical accounting.- Improved MTTR & MTBF up to rate №1 in Carlsberg group, decreased maintenance expenses on 15%.- Introduced 3 levels KPI system which is compiled to Company goals - Completed the investment projects: multipacks for can and bottle lines, renovation of blending shop, the new waste water treatment plant, building management system, the new grain storage, realized around 460 ideas for improvements. Created the team of winners, self-focused on the best result, opened for sharing of knowledge. Show less

    • STiS group of companies

      May 2014 - Aug 2014
      Production Director

      Change management into production system of 13 factories which are produced the glass units for windows and architect forms. Annual yield (B2B) is 6,5 mln.m2, workforce rises to 1100 with outsourced personnel at pick times. General priorities are to install LEAN+TPM and re-engineering of business processes and communications. Achievements: Deployed strategy to up skill people, value adding management and systematic elimination of waste. 20 mln.RUR saving for 3 months. Reviewed of management control reporting system, KPIs focused onto customers and expert level performance. Achieved 3d level in 5S, enhanced quality index for product and service up to 99,6%. Show less

    • Fresenius Group

      May 2015 - now
      Director of Production

      Project management, start-up of operation of medical goods.Operating managment of the plant

  • Licenses & Certifications

    • SGS for HACCP, RTN for all type of Hazard industry objects

      May 2013