Ankit Shrivastav

Ankit Shrivastav

Asst. Engineer

Followers of Ankit Shrivastav85 followers
location of Ankit ShrivastavAhmedabad, Gujarat, India

Connect with Ankit Shrivastav to Send Message

Connect

Connect with Ankit Shrivastav to Send Message

Connect
  • Timeline

  • About me

    Maintenance Engineer | SAP(PM) | Client: NATIONAL HIGHWAY AUTHORITY OF INDIA(NHAI)| 9yrs. of exp. in Plants & Equipment

  • Education

    • CAD STUDIO

      2008 - 2008
      Diploma in Auto CAD (2D&3D) Design and modeling 1st Division
    • Dr.D.Y.Patil Institute Of Management and Research

      2022 -
      Master of Business Administration - MBA Logistics, Materials, and Supply Chain Management
    • Integral University, Lucknow, Uttar Pradesh

      2006 - 2010
      B.Tech. Mechanical Engineering 1st Division

      Activities and Societies: Dissertation project on “Analysis of Welded joints” Trainee at Fuel Factory (HAL- Hindustan Aeronautics Ltd. ) • Participated in Udaan- the glider design and flying contest of “Fiesta 08” the technical. It was aLiterary & artistic annual festival of Integral University, Lucknow

  • Experience

    • Technical Fire Protection Service

      Oct 2013 - Oct 2015
      Asst. Engineer
    • G R INFRAPROJECTS LTD.

      Dec 2020 - now
      Senior Mechanical Engineer

      Project 3: Supervised the construction of a six-lane road between Mojrapur to Bijaura Section of Purvanchal Expressway (Package-VII). Design Chainage 246+500 km to 292+530 in the state of Uttar Pradesh on EPC Basis.• Client : UPEIDA• Designation : Engineer (Plant & Equipment)• Project mode : EPC• Period : Sep 2018 to till date.Project 2: Supervised the construction of a two-lane road with paved shoulder of Biharsharif-Barbigha-Mokama section of NH-82 from design change km 94.478 (Existing chainage 119.320 of NH-31) to Km.149.053 (Existing chainage Km149.020 of NH-82) (Total design length-54.575 Km) in the state of Bihar on EPC mode.• Client : NATIONAL HIGHWAY AUTHORITY OF INDIA(NHAI)• Designation : Engineer (Plant & Equipment)• Project mode : EPC• Period : April 2018 to Sep 2018.Project 1: Supervised the construction of a two-lane road between the Chhapra-Rewaghat-Muzaffarpur belt of NH – 722 from Design Chainage km 1+300 to Km 74+349 (Approx. Length 73.049Km) (397.27 Crore INR).• Client : NATIONAL HIGHWAY AUTHORITY OF INDIA(NHAI)• Designation : Engineer (Plant & Equipment)• Project mode : EPC• Period : June 2016 to January 2018. Show less

  • Licenses & Certifications