Kaveh Hezaveh

Kaveh Hezaveh

Followers of Kaveh Hezaveh397 followers
location of Kaveh HezavehIran

Connect with Kaveh Hezaveh to Send Message

Connect

Connect with Kaveh Hezaveh to Send Message

Connect
  • Timeline

  • About me

    Senior Petroleum Production Engineer at Iranian Offshore Oil Company

  • Education

    • Islamic Azad University

      1999 - 2003
      B.Sc Chemical Engineering, Petroleum Industry Processes Design 15.84 of 20 (B)

      Final Project: Spinel Ceramics; Production and Applications.

    • Amirkabir University of Technology - Tehran Polytechnic

      2010 - 2012
      Master of Engineering - MEng Chemical Engineering, Advanced Chemical Engineering 17.17 of 20 (A)

      Final Project: Field H2S removal from crude oil using gas stripping process and study of effective variables.

  • Experience

    • Iranian Offshore Oil Company

      Jun 2006 - now

      - Supervising and conducting the production engineering activities for oil wells stimulation and productivity condition improving e.g acid job, acid wash, nitrogen lift, ....- Analyzing diversity kinds of data e.g. production test, pressure test survey (build-up, static, flowing) using Metrowin. Monitoring ESP daily condition report to predict or/and improve the production ability of wells and designing some plans to get reach the targets compatible with company production policies and based on comparing predicted vs. actual rates, water cuts, GORs and pressures. Use these to identify possible problems or bottlenecks and advise some practical solutions.- Observing the daily well's inspection report and make needed activities to maintain the wells productivity on the best efficiency point.- Recording the production data and preparing back allocation for each well, keep the database update and perform medium/long term decline analysis and forecasting. - Performing the calculation and criteria analysis of pipeline design and selection using appropriate software and calculator besides of design and advise using correct flow meter equipment and calibrating transmitters.- Selection and recommending for improving the pump performance especially focused on centrifugal ones, design and order brand new pumps according to projects needs and their future horizons getting help of performance curve and related softwares.- Making PFD and P&ID drawings and doing corrections and get updating the drawings to be as-built versions. Show less - Supervising board men & power technicians for controlling all units (separation, crude oil stripping, exporting), processes and utilities, gas turbo generators… and conducting them in necessary situations to control the process.- Reporting the mechanical and rotary equipment conditions to OIM (Offshore Installation Manager) for maintenance planning.- Monitoring oil production rates and reporting to OIM and OFM (Offshore Field Manager) daily.- Analysing of oil wells status, documentation of laboratory results and preparing the comparison charts, BS&W and GOR trends, monitoring and preparing the analytic graphs and reports for OIM and OFM.- Planning for daily and weekly visits of satellite wells by well service guys and maintenance programs if it is necessary.- Supervising on permits issuing, morning HSE meetings and coordinates the sections for site-preparing activities before maintenance jobs.- Observing and training the site men to prepare them for unexpected shut-down conditions and routine hourly/daily operational duties.- Preparing the daily reports mainly included the production rate, rotary and mechanical equipment condition, PMR progress... for installation & field manager.In 2011 we had involved to some challenges in BAHREGANSAR offshore complex due to BS&W and sand production mainly lead to export booster pumps failure. After some investigations and days discussion with co-workers in the plant, we decided acting in two different ways:- Reducing the source of casualty that involved separation more brine in three-phase separators. Besides of operational improvements, redesign the separator internal focused on weir had considered. Neccessary calculations and maintenance hard workings made it successful. - Injection a kind of chemical to inhibit producing scales in pumps' casing and therefore their failure. Some kind of sea water scale inhibitor with specified dozen selected.Now our novel method works very well and the problem already disappears. Show less - Membership in pre-commissioning and commissioning team for starting up the new installation facilities (OSBL) included three phase separators, bubble cap tray stripper columns, gas turbo generators (GTG), fuel gas compressors, export booster pumps, RO water maker plant …. - As a CRO, controlling and monitoring all systems and units, process, utilities, power plant (gas turbines), HVAC, and solving any proccess problems happened during production and starting up again the plant after its probable shut-downs. - Daily controlling the productive wells status in cooperation with outside operator and well service guys and report it to shift controllers (production heads), - Monthly wells’ test to determine their productivity status and phases' condition. Show less

      • Senior Petroleum Production Engineer

        Feb 2013 - now
      • Operations Supervisor

        Jul 2009 - Feb 2013
      • Control Room Operator

        May 2007 - Jul 2009
      • Site Operator

        Jun 2006 - May 2007
  • Licenses & Certifications

    • PIPESIM software course

      FARAGOSTARAN institute
      Jan 2009
    • Pipeline pigging in oil industry

      Pars-Hydrocarbon institute
      Sept 2007
    • Process Safety Management (PSM)

      Iranian Offshore Oil Company
      Nov 2013
    • Asphaltenes & Wax in Oil Industry

      Research Institute of Petroleum Industry (RIPI)
      Sept 2013
    • CENTUM CS 3000 R3 fundamental course

      Yokogawa Middle East & Africa B.S.C.
      Oct 2007
    • Worthington pumps type 4-UXH 104L and 4-UXH 105L mechanical and operator

      Flowserve Corporation
      Mar 2008
    • Coiled Tubing

      Iranian Offshore Oil Company
      Aug 2014
    • Basic, structure, documentation & auditing of health, safety and environmental management system, HSE-MS

      TÜV NORD GROUP
      May 2010
    • PIPESIM software, Advanced

      Iranian Offshore Oil Company
      Sept 2012
    • Well Test Course (PanSystem Software)

      Iranian Offshore Oil Company
      Jan 2015