JINWOO LEE

JINWOO LEE

Assistant Manager

Followers of JINWOO LEE114 followers
location of JINWOO LEE대한민국 경기도

Connect with JINWOO LEE to Send Message

Connect

Connect with JINWOO LEE to Send Message

Connect
  • Timeline

  • About me

    Self-employment

  • Education

    • INHA UNIVERSITY

      -
      BS Electronics Engineering

      동아리와 학회:ROBOT RESEARCH CLUB HAM ROBOT Resarch CLUB - Designed the micromouse .HAM (HL0ZX)

    • 인하대학교

      -
      Bachelor's degree Electronics Engineering

      동아리와 학회:ROBOT Rearch Club HAM Robot Research club.Amature wireless communocation (HAM)

  • Experience

    • HYNIX

      Jun 1994 - Apr 1998
      Assistant Manager

      Engineer for HW development  Development IOP board of Super MINI Computer (TICOM II) Acquisition of utility model patent an Data path controller Design IOP board and VME Adaptor Board charge of PCB artwork by allegro layoutEngineer for production engineering Production engineering IOP board and memory board of super mini computer III Development and manufacturing the integrating board of SCSI and VME ( 30% material cost reduction )Engineer for product engineering Product engineering for 8way PC Server of AXIL Company in USA Charge of mass production transfer a product of AXIL Company Building production line and charge of initial production in USA Solved major quality issue in outsourcing SMT process in USA 더보기 취소

    • UNIWIDE Techonolgy

      Apr 1998 - Dec 1998
      System Engineer

      Engineer for HW development  Development X86 based PC Server System integration Super Mini Computer for government Line up the INTEL White Box Servers Making proposal and demonstration for HA Solution Participate in BMT for Post Information Network Participate in examine proposal for ICT education project

    • Netcomstorage

      Dec 1998 - Apr 2000
      Team Manager of development 3rd team

      Team managing for system integration Development X86 & SUN SPARC Based PC Server Engineering for high level storage system of LG Hitachi- Configuration and sizing- Installation and technical maintenance. System engineering for building Internet portal site.- Proposal HW configuration and solution- Sizing for hardware specification of systems- System and solution configuration & installation. Proposal and demonstration for HA Solution- Veritas , MSCS Project history - Supply of hardware for building Good morning stock ARS System front-end server- Supply of hardware and backup solution for Chosun Ilbo WebSite Supply of 4 way server for KBS Media Server- Supply of whole systems for internet broadcasting server system of Dongkuk university- Tech support for maintenance contract for KEB card computer room 더보기 취소

    • UNIWIDE Technology

      Apr 2000 - May 2001
      Senior Engineer for HW development and System integration

       Development X86 based server system for Internet Data Center (2 way , 4 way Server ) Outsourcing HW & Network solution - Traffic management solution of RADWARE- Making proposal for IDC Development SUN SPARC Based 4way server system Charge in technical part of proposal for government and military network.  System engineering for building Internet portal site. Major Project History- Supply of 1000 units pc server for colocation service of Internet Empire in KIDC.- Supply of hardware(server,storage,network) and solutions for building home-page of korea.internet.com- Supply of midrange server HW for I love school home page.- Supply of high level PC server for KEB information system- Supply of hardware and solution for game server and DB Server of online game site that must have higher performance than 120,000 transaction per second.- Supply of PC Server for Army battalion command network. Making Proposal & demonstration for High availability Solution 더보기 취소

    • Secure Tech

      Jun 2001 - Sept 2004
      System Development Team manager

       Development manufacturing process for yield enhancement. Tune up the wafer wedge bonding machine. Development the test method and test tool for test capability enhancement. Setup the LCOS Wafer finishing process in 100class cleanroom Setup the wafer post-processing factory. Performed the initial delivery of the LCOS image engine module to LG Elec.

    • Spatialight Korea.

      Oct 2004 - May 2005
      Process Development Team Manager

       Development manufacturing process for yield enhancement. Tune up the wafer wedge bonding machine. Development the test method and test tool for test capability enhancement. Setup the LCOS Wafer finishing process in 100class cleanroom Setup the wafer post-processing factory. Performed the initial delivery of the LCOS image engine module to LG Elec.

    • POSCO ICT

      Jun 2005 - Sept 2009
      Production Engineering Team Manager

      1. Leader of cost renovation task (June 2009 to September 2009) Deduct the major root causes of cost increase 2. Production Engineering Team Manager (June 2005 to March 2009) Setup the Mass Production process for Mobile WiMAX Macro BTS  Build the pilot production Line ( 20 Cell ) Charge in mass-production for Mobile WiMAX Macro BTS Development Test Automation System for Mobile WiMAX BTS Setup the ERP for Manufacturing ( ORACLE INV,PLAN,WIP ) Implementation Value Engineering (Cost Reduction) Outsourcing the Rectifier & Battery Backup System for Base station (40% downsizing, 35% Cost down) 더보기 취소

    • JUNI KOREA

      Jul 2009 - Mar 2015
      Production Engineering Team Manager

      : 1. Managing Telstra project (July 2013 to March 2015) Shipped LTE Enterprise indoor FEMTO BTS and EMS Server , Fibre channel External Storage  Cost Analysis Making server redundancy and disaster recovery solution Proposal Making Server migration solution proposal 2. Team Manager of Production Engineering (July 2009 to July 2013) Director Manufacturing of all product of Juni Korea Setup the mass production process the mobile WiMAX PICO Outdoor BTS & LTE Small Cell BTS Managing production plan and quality control Setup ERP for production Setup Auto test system for BTS 3. Development and System Engineering (concurrent)  Design the mechanical structure and exterior for BTS Downsizing and thermal control for indoor and outdoor system Technical Support KT BMT Making the uninterruptable Power Supply Structure for Outdoor BTS proposal to Malaysia Making the core network for mobile wireless communication Making the high availability solution for back-end server of mobile wireless communication network 더보기 취소

  • Licenses & Certifications

    • Engineer Information Processing the 1st degree

    • CompTIA Network+ Certified professional

      CompTIA
  • Volunteer Experience

    • 88 Seoul Olympic volunteer

      Issued by Korea Olympic Organizing Committee on Jun 1988
      Korea Olympic Organizing CommitteeAssociated with JINWOO LEE