Muhammad Attia

Muhammad Attia

Project Engineer

Followers of Muhammad Attia121 followers
location of Muhammad AttiaCairo, Cairo, Egypt

Connect with Muhammad Attia to Send Message

Connect

Connect with Muhammad Attia to Send Message

Connect
  • Timeline

  • About me

    Industrial Systems Engineer (ISE)| Data Analysis | Advanced Management Program (AMP) Certified Industrial Engineer (CIE) | Quality Management | Systems & Processes.

  • Education

    • University of Greenwich

      2010 - 2015
      Bachelor's degree Industrial Engineering Third Degree Honors
    • Modern Sciences and Arts University

      2010 - 2015
      Bachelor's degree Industrial Engineering Good
  • Experience

    • Palm Hills Developments

      Dec 2016 - May 2017
      Project Engineer

      • Fiber optics earth material, network infrastructure, Routing layout of each compound on-site for each• Singlehandedly shielded “Network & infrastructure drawings” for a commercial Mall.• In charge of observing & following up 3 Major e-compound projects “Hacienda Bay & HaciendaWhite & Palm Hills Zayed” in collaboration with Project Managers, Civil, IT & Sub-contractors.

    • Gulsan Holding

      Jun 2017 - Oct 2022
      Production Quality Engineer

      • Attended weekly meetings with sales team, for order planning & production plans in accordance to predetermined quality and safety standards.• Responsible for commissioning & installation for caballing layouts for RF4+ line & covering label trays, design & numbering.• Ensured my 3 teams (of 12-17 member each) have access to proper knowledge, training matrix met, quality standards met on daily basis, hygienic status & overall performance.• Recommended preventive maintenance initiatives to maintenance team based on machinery performance supervision.• Reported directly to Production Manager & Prepared Project Documentation such as (Operating Manuals, FAT procedures, SAT procedures)• Coordinated with the Maintenance department on the implementation of maintenance schedules so as not to disrupt production targets• Establish “Quality system” procedures, documents & forms, with serials, controlling charts (upper & lower control limits), Root cause analysis & Problem-solving reports.• Proposed & implemented a solution to prevent recurring mix-up of master batch percentages reducing production waste. Show less

    • The German University in Cairo

      Dec 2022 - Mar 2024
      Quality Management Consultant

      PROJECT #1: GUC Clinic (Processes improvement)• Addressed rising “time spent by employees/patients within University’s clinic” by re-evaluating plans, processes, and re-calculating clinic’s flow charts, and proposingsolutions consequently in RF.• Escorted my 2 teammates into better technical understanding, through regular.trainings on “Value stream mapping” (value added time, non-valued added time,cycle & ideal times measurement & how to get process efficiency from the measuredvalue stream). (On-site & off-site)• Settled on projects rules, important definitions and standard operating procedures,ensuring smooth workflow and effective internal communications within the team.• Conducted measurements in person using stopwatches within the clinic and compiledreports respectively.• Allocated the tool to represent measured process. (vim).• Proposed recommendations (for medical records selection & labeling & time spent bypatient) for future improvements to the upper management.PROJECT #2: Warehousing improvements for factories within GUC Industrial Park Zone• Analyzed the improvement points for “CNC Factory Warehouse” within the Park. For (inventory tracking, storage & picking) systems establishment.• Implemented “5S - methodology”, under the observation of quality office.• Simulated a mock-up test to determine improvement measurements. Depending on warehouse layout, forms, rules, outdrawing, Technical art.• Conducted 5S training for warehouse employees increasing effective internal communications.• Established Standard operating procedures SOPs and quality standards for material storage, entry & exist; using identification labeling, racks coding, referencing, realizing material retrieve time of 18-60 seconds compared to 15 minutes’ pre-system improvement. (complicated testing)• Provided work-training documentation for future employee onboarding.• Succeeded in reducing the occupied space by 4.2% free space post 5Simplementation. Show less

    • Methode Electronics

      Jul 2024 - now
      Senior Process Engineer
  • Licenses & Certifications

    • Advanced Management Program

      AUC School of Business Executive Education
      Nov 2023
      View certificate certificate
    • Google Data Analytics Specialization

      Coursera
      Nov 2022
      View certificate certificate
    • Certified Industrial Engineer

      International Business Driving License - IBDL
      Jul 2021
    • Solidworks

      CAD MASTERS
      Jan 2021