Abraham Ramirez

Abraham Ramirez

Store Manager

Followers of Abraham Ramirez137 followers
location of Abraham RamirezLas Cruces, New Mexico, United States

Connect with Abraham Ramirez to Send Message

Connect

Connect with Abraham Ramirez to Send Message

Connect
  • Timeline

  • About me

    Facilities Engineering Manager at Lockheed Martin Skunk Works

  • Education

    • Universidad de Monterrey (UDEM)

      2008 - 2010
      Bachelor of Science (BS) Industrial Engineering
    • New Mexico State University

      2011 - 2014
      Bachelor of Science (B.S.) Industrial Engineering

      Activities and Societies: IIE Member Institute of Industrial Engineering from January 2014- May 2014

  • Experience

    • Hommework

      May 2013 - Dec 2013
      Store Manager

      Collect and input data to prepare daily sales, reports, and regularly use weekly and monthly data to develop sales and promotional strategies.Trained staff to deliver outstanding customer service.

    • Lucchese bootmaker

      Jan 2014 - May 2014
      Entry Level Engineer

      Worked within a project: Improving and increasing the production by a 50% going from 100 boots/day to 150, doing critical analysis, time, and motion studies by meeting high quality control standards, and saving significant percentage on supply cost and downtime. Applying engineering methodologies of line clearance at every step of batch manufacturing, in order to have an effective line production. Some of them are 5S, ergonomics, and facilities planning and design.

    • Active Grid System, NMSU

      Jan 2014 - May 2014
      Team Manager

      Designed, manufactured and installed a system focusing on generating homogeneous turbulence in a wind tunnel all this by meeting high quality control standards.Project Management: Supervised project production efforts to ensure projects were completed to company standards, on time and within budget constraints.

    • Adidas group

      Oct 2014 - Dec 2014
      Sales Assiociate

      I gained the knowledge in providing exceptional customer service and creating a customer centric environment. I am a goal oriented individual who embraces the challenge of mediocrity and pushes past it. Possessing extensive knowledge of basic retail concepts, visual merchandising and loss prevention techniques has allowed me in the past to achieve all goals that have been set for me in the group of adidas.

    • Azar Nut Company

      Dec 2014 - Jun 2016

      Analyzed production`s procedures and proposed changes that were implemented with a positive result on cost & scrap; savings of 100k. Finalized time and motion studies, to obtain a 30% improvement on machine efficiency. Deployed, maintained, and leaded QCDSM Lean Manufacturing Methodology. Provided mentoring and support to all personnel involved. Monitored below goal numbers and apply corrective & preventive actions. Lead regular Lean Manufacturing workshops (5s, SMED), reducing 50% down time on changeovers. Show less Validated 30+ items, and all new products, thus eliminating 95% material variances on different items. Assessed relevance of every process and arranged engineering equipment accordingly – Reviewed existing data to ensure sufficient information for process to be executed. Analyzed training needs creating a yearly Master Training Schedule, maintaining a grade ≥ 94%/month. Keeping track of all documentation, specifications and processes, ensuring that everyone uses the correct processes and specifications according to SQF Level III code scoring a grade of 99%. Received an internal promotion. Show less Quality Assurance daily duties:Perform inspections and set quality assurance testing models for analysis of raw materials, materials in process and finished products at a company the produces more than 1,000,000.00 pounds of finished product per week. Prepared standard test reports by analyzing collected weights, O2 levels among other data on specific tests for a constant quality improvement, operated optical comparing and measuring instruments to analyze any fault, calibrated gauges and test equipment according to calibration procedures. Helping in the development of processes and procedures, deciding on the standards to be achieved, identifying problems and making improvements, training new staff involved in the processes. Show less

      • Industrial Engineer

        Jan 2016 - Jun 2016
      • Process Engineer / Training Coordinator / Document Control Coordinator

        Jun 2015 - Jan 2016
      • Quality Assurance Engineer technician

        Dec 2014 - Jun 2015
    • Corekits INC

      Feb 2017 - Jun 2018
      Quality Engineer

      Monitor processes and analyze data using SPC techniques to improve production processes. Used PPAP on every new/modified project gathering MSA studies (GRR), doing capability studies, performing inspections etc. Improved packaging and tracking process by bringing new technology on the production lines, thus reducing cost and increasing efficiency. Implementing 5S methodology to production lines, currently working on a new project for the implementation of a bar coding system, always meeting guidelines and expectations. Show less

    • Lockheed Martin

      Jul 2018 - now

      Promoted to be Associate Manager at Skunk Works Site, leading our internal engineering team, Jacobs Engineering tech planners and Unisource services. Manage OPAL SOPs in depth analysis/improvement/implementation. Overseeing Facilities Overhead, constant mentoring to new and existing team members on project management and LM procedures. Promoted to be Staff Lead over Facilities Engineering. Provide daily mentorship, training, and guidance to new/existing technical and construction trade employees. Constant focus on process improvement to make the OPAL team more successful. Designee during management absence. Helped on Team Building efforts by participating on employee recruitment and provide strong input on planning hiring needs for the department. Promoted to be a Sr. FE. PM for multi-million-dollar projects. Finalized the design of a key $24M capital project. Manage scope, schedule, and budget for buildings, structures, space reconfiguration and other facilities construction projects. Built several ICD705 classified office and lab spaces, proposing several layout options. Executed corrective action plans to mitigate unnecessary impact to cost and schedule. Led an extensive team of engineers and contractors for each project. Constant communication with upper management on key projects. Show less Promoted to be Staff Lead over Facilities engineering staff. Provide daily mentorship, training, and guidance to new/existing technical and construction trade employees. Constant focus on process improvement to make the OPAL team more successful. Designee during management absence. Helped on Team Building efforts by participating on employee recruitment and provide strong input on planning hiring needs for the department. Promoted to be a Sr. FE. PM for multi-million-dollar projects. Finalized the design of a key $24M project. Manage scope, schedule, and budget for buildings, structures, space reconfiguration and other facilities infrastructure projects. Built several ICD705 classified office and lab spaces (capital projects). Executed corrective action plans to mitigate unnecessary impact to cost and schedule. Led an extensive team of engineers and contractors for each project. Host status meetings with stakeholders. Constant communication with upper management on key projects. Show less Provide project management for multi-million dollar projects. Manage scope, schedule, and budget for buildings, structures, space reconfiguration and other facilities infrastructure projects. Executed corrective action plans to mitigate unnecessary impact to cost and schedule. Lead an extensive team of engineers and contractors for each project. Host status meeting with stakeholders. Constant communication with upper management on key projects. Currently working on a key $24M project to allow a major program meet their customer needs. Built several ICD705 classified spaces. Provided mentorship to new employees. Received internal promotion to be a Sr Engineer. Show less

      • Facilities Engineering Manager

        Sept 2023 - now
      • Lead Facilities Engineer

        Apr 2022 - Sept 2023
      • Senior Facilities Engineer

        Jul 2019 - Apr 2022
      • Facilities Engineer

        Jul 2018 - Jul 2019
  • Licenses & Certifications

  • Volunteer Experience

    • charity events

      Issued by Rotary International on Jan 2010
      Rotary InternationalAssociated with Abraham Ramirez