Yasin Karataş

Yasin Karataş

Project Engineer

Followers of Yasin Karataş3000 followers
location of Yasin KarataşIstanbul, Istanbul, Türkiye

Connect with Yasin Karataş to Send Message

Connect

Connect with Yasin Karataş to Send Message

Connect
  • Timeline

  • About me

    Managing Director

  • Education

    • Karadeniz Teknik Üniversitesi

      2003 - 2009
      Bachelor of Engineering (B.Eng.) Mechanical Engineer
  • Experience

    • Ceta Makina

      Jul 2010 - Dec 2010
      Project Engineer

      o Limak Cement Plant Installation in Urfa-Turkiye ; Raw and coal mill installation and tie installation with system, Pre-Heater installation and connection with cement kiln.o Preparing of monthly progress paymento Fabricate of the production line (big diameter (4000mm; 12000mm) pipes, cyclones,) at the workshop in site.o Control the fabrication on site

    • NEUMO-Ehrenberg-Gruppe

      May 2011 - Jul 2016

      PROJECT ENGINEER; DUTIES; • Managing projects from conception, pre-production through to completion. • Providing technical support to the project team and wider regional teams. • Responsible for overseeing the review, initiation and execution of contracts. • Overseeing the maintenance of projects after completion. • Responsible for the completion of all documentation. • Producing Test Plans and reports. • Prepare contract documentation for procurement services and materials. EXPERIENCES;o Coca Cola Elazığ Plant; Process and filling lines installation.o Deva Pharmaceutical Plant, in Çerkezköy; installation and commissioning of deionized water storage and distribution system.o Zentiva Pharmaceutical Plant, in Lüleburgaz; installation and commissioning of wfi (water for injection) water storage and distribution system.o PharmActive Pharmaceutical Plant, in Çerkezköy; installation and commissioning of deionized water storage and distribution system.o IFF Gebze Plant, Phase-I Expansion Project; Installation and commissioning of CIP system distribution. Installation of liquid raw materials storage, charging and discharging system.o I have been doing preparatory work for IFF Gebze Plant, Phase-II Expansion Project; Installation and commissioning of process lines and systems, installation of equipment, installation of utilities,PRODUCTION ENGINEER; DUTIES;o Design, project planning, production planning, production and transportationo Manufacture of customers’ special requests,o Manufacture of vapour, gas and liquid filter housings.o Manufacture of UV disinfection devices’ housing.o Manufacture of mobile tank with or without mixer.o Manufacture of Powder Mixer which is used melt sugar. Show less

      • Technical Services Manager

        Feb 2015 - Jul 2016
      • Project & Production Engineer

        May 2011 - Apr 2015
    • GENTECH Process Engineering

      Jul 2016 - now

      Project management of the pure water systems design, preperation of the data sheet of the equipments, installation, site managements and quality documents for pharma industries. Process design, installation and managements for Food & Beverage, dairy, cosmetics and chemical industries.TURK ILAÇ ve SERUM PROJECT;Project Management of the below systems;- Pre-treatment systems for PW production system- 15.000 LT/H PW production system desig and Project,- 50.000 LT storage and distribution system project design and application- 10.000 LT/H WFI system Project management- 50.000 LT WFI storage and distribtion system Project desing and aplication- Quality and validation documents Show less

      • Managing Director

        Jun 2019 - now
      • Chief Technical Officer

        Jul 2016 - Sept 2019
  • Licenses & Certifications

    • Health, Safety and Environment Specialist - Class C

      Republic of Turkey, Ministry of Labor and Social Security
      Jan 2014