Sanjeev Naik

Sanjeev naik

bookmark on deepenrich
Followers of Sanjeev Naik12 followers
  • Timeline

  • About me

    Engineering Manager - Structural Engineering (Ducts, Structure & Absorber) at GE Power India Limited

  • Education

    • Karnataka university, dharwad

      1993 - 1997
      B.e mechanical engineering
  • Experience

    • Nestler limited - bombay

      Sept 1997 - Jan 2001
      Design engineer

      The company is involved in design & manufacturing of FBC / Non-FBC Single / Bi-Drum Water Tube Boiler Waste Heat Recovery Boilers for DG/GT Exhaust, Sulfuric Acid Plant etc.Packaged Steam Boilers. Effluent Treatment Plants.Nature of work :The job involves offering proposals for the enquiries and making detail engineeringAfter the order.

    • Thermal systems (hyderabad) pvt. ltd.

      Feb 2001 - Oct 2004
      Assistant manager

      A leading firm ISO 9001 Certified and authorized to use ASME ‘U’ and ‘S’ Stamps engaging in Heavy fabrication of pressure vessels, Heat exchangers and Boilers etc.Nature of work :• Mechanical design of pressure parts as per ASME Codes , IBR & Finalization of General Arrangement Drawings.• Detailed Engineering of Equipment. • Approval of Designs / Drawings from clients/consultants.• Site drawings for installation.

    • Ge power

      Oct 2004 - now

      • Leading a team of Engineers & Modelers, which delivers conceptual and Basic Engineering solutions for all Boilers, ESP & FGD proposals and Projects.• Effective utilization of resources to achieve targeted productivity, first pass yield and on time performance and update management with KPI reports & Score card.• Generate and implement cost out ideas to meet estimated target price for Boiler, ESP & FGD Projects.• Support to Tendering, Manufacturing team, Construction team, Supply Chain & Project Management teams during tender and project execution. • Support to Product qualification, Vendor selection,Achievements: • Received award for Above and beyond for Effective Managing skills & Inspiration to Ducting team.• Received d2e award for major project contribution for Boiler product platform. • Lead a Duct cost out Initiative for developing of New Boiler duct design with multi-disciplinary teams and achieved 500kUSD savings to GE • Introduced 24X7 working method at Windsor and Delhi using time difference with effective coordination, communication and planning. Reduced Ducting Conceptual design cycle time in CEL2 project. By 4 weeks.• Instrumental in completing the TOT of Power plant duct design which is need of the hour to address the upcoming projects in India.• Developed Ducting & Enclosure & Structural teams to deliver with minimum supervision.• Achieved full technical competency for Ducting , Strcture & Absorber teams in 2 pass technology & CFBC Boilers & FGD Projects.• Contributed in CTSM format and monitoring every month to ensure that all trainings planned for every month is executed for all Engineering sub functions. Show less • Lead a team of Engineers & Modelers, which delivers conceptual and Basic Engineering solutions for all Boilers, ESP & FGD proposals and Projects.• Develop team competency through Technology transfers and gain lead center (Windsor/Stuttgart/Massy) confidence for maximum work transfer to India.• Effective utilization of resources to achieve targeted productivity, first pass yield and on time performance and update management with KPI reports & Score card.• Generate and implement cost out ideas to meet estimated target price for Boiler, ESP & FGD Projects.• Support to Tendering, Manufacturing team, Construction team, Supply Chain & Project Management teams during tender and project execution. • Support to Product qualification, Vendor selection, • Coordination with H.O in Windsor USA for Design Review.• Coordination with Steel COE in China for Tools and Processes. Show less • Lead a team of Engineers & Modelers, which delivers conceptual and Basic Duct Engineering solutions for all Boilers proposals and Projects.• Develop team competency through Technology transfers and gain lead center (Windsor/Stuttgart/Massy) confidence for maximum work transfer to India.• Effective utilization of resources to achieve targeted productivity, first pass yield and on time performance and update management with KPI reports & Score card.• Generate and implement cost out ideas to meet estimated target price for Boiler, ESP & FGD Projects.• Support to Tendering, Manufacturing team, Construction team, Supply Chain & Project Management teams during tender and project execution. • Coordination with H.O in Windsor USA for Design Review. Show less Lead a team of Engineers & Modelers, which delivers conceptual and Basic Ducts , Buckstay& RIS Engineering solutions for all Boilers proposals and Projects.• Develop team competency through Technology transfers and gain lead center (Windsor/Stuttgart/Massy) confidence for maximum work transfer to India.• Effective utilization of resources to achieve targeted productivity, first pass yield and on time performance and update management with KPI reports & Score card.• Generate and implement cost out ideas to meet estimated target price for Boiler, ESP & FGD Projects.• Support to Tendering, Manufacturing team, Construction team, Supply Chain & Project Management teams during tender and project execution. • Coordination with H.O in Windsor USA for Design Review. Show less Lead a team of Engineers & Modelers, which delivers conceptual and Basic Duct Engineering solutions for all Boilers proposals and Projects.• Develop team competency through Technology transfers and gain lead center (Windsor) confidence for maximum work transfer to India.• Effective utilization of resources to achieve targeted productivity, first pass yield and on time performance and update management with KPI reports & Score card.• Generate and implement cost out ideas to meet estimated target price for Boiler, ESP & FGD Projects.• Support to Tendering, Manufacturing team, Construction team, Supply Chain & Project Management teams during tender and project execution. • Coordination with H.O in Windsor USA for Design Review. Show less

      • Engineering Manager - Structural Engineering (Ducts, Structure & Absorber) at GE Power India Limited

        Nov 2021 - now
      • Engineering Manager – ESP & Duct Engineering at GE Power India Limited

        Mar 2019 - Oct 2021
      • Team Leader – Mechanical components (Duct Engineering) at GE Power India Limited

        Jan 2015 - Feb 2019
      • Manager (Ducting, Buckstay & RIS) at Alstom Projects India Limited

        Jan 2011 - Jan 2015
      • Manager Ducting at Alstom India Limited

        Jan 2007 - Jan 2011
      • Project Engineering Manager at Alstom India Limited

        Oct 2004 - Jan 2007
  • Licenses & Certifications

    • Trained in alstom power windsor usa for 16 months in power plant duct design.

      Alstom power ltd
      Jan 2010
    • • people leader expectations • performance management and talent development • 3 weeks people manager program• developing leader in you

      Ge power
      Jan 2019
    • Trained in pdms by aveva information technology.

      Aveva
      Jan 2010
    • Internal quality auditor for iso 9001 - 2000 system.

      Thermal systems (hyderabad) pvt. ltd.
      Jan 2000