Mohammad Makhdumi

Mohammad Makhdumi

Piping QA/QC Inspector

Followers of Mohammad Makhdumi819 followers
location of Mohammad MakhdumiAl Jubayl, Saudi Arabia

Connect with Mohammad Makhdumi to Send Message

Connect

Connect with Mohammad Makhdumi to Send Message

Connect
  • Timeline

  • About me

    CBT PASS :- ARAMCO APPROVED PIPING INSPECTOR (SAP NO- 80005560) working in Hyundai Engineering CO. LTD group as a QA/QC INSPECTOR (MIP PROJECT) TANAJIB GAS PLANT

  • Education

    • Bharath Institute Of Science And Technology

      2010 - 2014
      Bachelor of Technology - BTech Mechanical Engineering FIRST CLASS

      Activities and Societies: Participated in Several Sports and Community Services Activities. B. TECH IN MECHANICAL ENGINEERING FROM BHARATH UNIVERSITY, CHENNAI, SECURING 1ST DIV. IN THE YEAR OF 2014

  • Experience

    • Arabian Pipeline & Services Co. Ltd. (ANABEEB)

      Aug 2014 - Feb 2015
      Piping QA/QC Inspector

      Client : SABICProject Nature : Multi Turn-Arounds / Shutdowns Short Duration Projects.ANABEEB carry-outs major project activities on Reactors, Heat Exchangers, Tanks, Columns, Furnaces, Static equipment and other plant critical equipment with vast amount of equipment and experienced multi-disciplinary in-house team. With ANABEEB as Piping QA/QC Inspector, I was involved in several turn-arounds / shut down Projects of IBN-ZAR, YANPET, MAADEN, SHARQ, TASNEE.Designation : Piping QA/QC InspectorTenure : From Aug 2014 to Feb 2015Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

    • Integrated Oilfield Supply & Services

      Mar 2015 - Oct 2015
      Piping Inspector

      Client. : GALFARProject Nature : Construction and Installation of Gas Gathering System Phase-1Construction of Approx. 220 km DSS Underground Gas Pipeline for Gas Gathering System, Block 61 Khazzan. Total 37 Lines which includes Main headers, Sub Header & Flowlines. Designation. : Piping InspectorTenure : From Mar 2015 to Oct 2015Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

    • China National Chemical Engineering Company Pvt. Ltd.

      Dec 2015 - Jun 2018
      Piping QA/QC Inspector

      Client : SABIC (Chem Tank)Project Nature : PQC-2 (SAB TANK)PETROCHEMICAL QUAY – 2 (PCQ-2) project was located in Jubail KFIP, east of Saudi Arabia. The end-user is SABIC. The total storage capacity of the project was approx. 220,000m3.It was turn-key project with Engineering, Procurement and Construction scope of work. Designation : Piping QA/QC InspectorTenure : From Dec 2015 to Jun 2018Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items.Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items.Inspection of the Re-instatement activities until the certification Mechanical Completion.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

    • Oil Gas Petroleum Jobs

      Aug 2018 - Jul 2021
      QA/QC Inspector
    • Nasser S Al- Hajri Corporration

      Aug 2018 - Sept 2021

      Client : SAIPEMProject Nature : JAZAN Integrated Gasification Combines Cycle (JIGCC Package 1) Saudi Aramco.This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project.SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Designation : Piping QA/QC InspectorTenure : From Aug 2018 to Sep 2021Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Inspection of Raw Materials, Testing, Painting, Hydro testing, Release/Dispatch of the Fabricated ItemsInterpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes/Fittings, Edge Preparation, Welding quality during the Fabrication activities Inspection of Erected Pipelines/Structures/Spools/Tank’s/ Vessel’s Internals and Enlisting Punch Items.Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure in line with client’s standard.Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items.Inspection of the Re-instatement activities until the certification Mechanical Completion.Coordination with the Safety Officers to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jizan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.• Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

      • Piping QA/QC Inspector

        Aug 2018 - Sept 2021
      • QA/QC Inspector

        Aug 2018 - Sept 2021
      • QA/QC Inspector

        Aug 2018 - Sept 2021
      • QA/QC Inspector

        Aug 2018 - Sept 2021
      • QA/QC Inspector

        Aug 2018 - Sept 2021
    • Meraki Global Energy LLC

      Oct 2022 - Mar 2023
      Mechanical Engineer

      T-BOX REINFORCEMENT, TOGGLE ARM REPLACEMENT & REPAIR, LANDING BAR, ADDITIONAL JACKET PLATE, PUTTING INSULATION IN LANDING BAR,REPLACEMNT OF BUSH PIN & WELDING,  GT left and right side of boiler installation of H-Beams to reduce vibration. Modification of the feet with required clearance level on the guide bar. Replacement of toggle arm & welding with toggle arm shaft  Installation of new jacket plate & stiffener plate Removal & installation of landing bar Galantine damper Show less

    • Ajyaal fiberglass

      Jul 2023 - now
      RTR/GRP/GRE INSPECTOR🕵
    • Hyundai Engineering Co. Ltd.

      Sept 2024 - now
      QA/QC PIPING INSPECTOR

      QA/QC PIPING INSPECTOR

  • Licenses & Certifications

    • APPROVED QC PIPING INSPECTOR

      Aramco
      May 2019