
Mohammad Makhdumi
Piping QA/QC Inspector

Connect with Mohammad Makhdumi to Send Message
Connect
Connect with Mohammad Makhdumi to Send Message
ConnectTimeline
About me
CBT PASS :- ARAMCO APPROVED PIPING INSPECTOR (SAP NO- 80005560) working in Hyundai Engineering CO. LTD group as a QA/QC INSPECTOR (MIP PROJECT) TANAJIB GAS PLANT
Education

Bharath Institute Of Science And Technology
2010 - 2014Bachelor of Technology - BTech Mechanical Engineering FIRST CLASSActivities and Societies: Participated in Several Sports and Community Services Activities. B. TECH IN MECHANICAL ENGINEERING FROM BHARATH UNIVERSITY, CHENNAI, SECURING 1ST DIV. IN THE YEAR OF 2014
Experience
.webp)
Arabian Pipeline & Services Co. Ltd. (ANABEEB)
Aug 2014 - Feb 2015Piping QA/QC InspectorClient : SABICProject Nature : Multi Turn-Arounds / Shutdowns Short Duration Projects.ANABEEB carry-outs major project activities on Reactors, Heat Exchangers, Tanks, Columns, Furnaces, Static equipment and other plant critical equipment with vast amount of equipment and experienced multi-disciplinary in-house team. With ANABEEB as Piping QA/QC Inspector, I was involved in several turn-arounds / shut down Projects of IBN-ZAR, YANPET, MAADEN, SHARQ, TASNEE.Designation : Piping QA/QC InspectorTenure : From Aug 2014 to Feb 2015Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

Integrated Oilfield Supply & Services
Mar 2015 - Oct 2015Piping InspectorClient. : GALFARProject Nature : Construction and Installation of Gas Gathering System Phase-1Construction of Approx. 220 km DSS Underground Gas Pipeline for Gas Gathering System, Block 61 Khazzan. Total 37 Lines which includes Main headers, Sub Header & Flowlines. Designation. : Piping InspectorTenure : From Mar 2015 to Oct 2015Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

China National Chemical Engineering Company Pvt. Ltd.
Dec 2015 - Jun 2018Piping QA/QC InspectorClient : SABIC (Chem Tank)Project Nature : PQC-2 (SAB TANK)PETROCHEMICAL QUAY – 2 (PCQ-2) project was located in Jubail KFIP, east of Saudi Arabia. The end-user is SABIC. The total storage capacity of the project was approx. 220,000m3.It was turn-key project with Engineering, Procurement and Construction scope of work. Designation : Piping QA/QC InspectorTenure : From Dec 2015 to Jun 2018Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Interpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items.Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard.Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items.Inspection of the Re-instatement activities until the certification Mechanical Completion.Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less

Oil Gas Petroleum Jobs
Aug 2018 - Jul 2021QA/QC Inspector
Nasser S Al- Hajri Corporration
Aug 2018 - Sept 2021Client : SAIPEMProject Nature : JAZAN Integrated Gasification Combines Cycle (JIGCC Package 1) Saudi Aramco.This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project.SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Designation : Piping QA/QC InspectorTenure : From Aug 2018 to Sep 2021Responsibility Synopsis:Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications.Inspection of Raw Materials, Testing, Painting, Hydro testing, Release/Dispatch of the Fabricated ItemsInterpretation of Radiography of Joint, Manual UT, Penetration Test.Visual Inspection of Pipes/Fittings, Edge Preparation, Welding quality during the Fabrication activities Inspection of Erected Pipelines/Structures/Spools/Tank’s/ Vessel’s Internals and Enlisting Punch Items.Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure in line with client’s standard.Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items.Inspection of the Re-instatement activities until the certification Mechanical Completion.Coordination with the Safety Officers to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jizan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP.• Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less This project involved the Gasification Unit, the Soot/Ash Removal Unit, the Acid Gas Removal and the Hydrogen Recovery Units. This package was part of the current Saudi Aramco development of the largest gasifier based power facility built in the world, adjacent to its new Jazan Refinery & Terminal project. SAIPAM has been awarded the this project with scope of engineering, procurement, construction, pre-commissioning, assistance to commissioning and performance tests of the concerned facilities.Preparation of Inspection and Test Plans (ITP’s), and follow Project quality plan PQP. • Verifying Fabrication / Erection being done according to Approved (AFC) Drawings, and Specifications. • Inspection of Raw Materials, Testing, Painting, Hydro testing, Release and Dispatch of the Fabricated Items • Interpretation of Radiography of Joint, Manual UT, Penetration Test. • Visual Inspection of Pipes and Fittings, Edge Preparation, Welding quality during the Fabrication activities • Inspection of the Erected Pipelines / Structures, Spools, Tank’s/ Vessel’s Internals and Enlisting Punch Items. • Raising NCR’s/Punch and Maintaining the NCR Log Book with Closure action in line with client’s standard. • Attending and Giving Toolbox Talk and Explain to Maintain Quality work to minimize Punch Items. • Inspection of the Re-instatement activities until the certification Mechanical Completion. • Coordination with the Safety Officers (HSE) to execute the work safely based on site HSE rules & regulations. Show less
Piping QA/QC Inspector
Aug 2018 - Sept 2021QA/QC Inspector
Aug 2018 - Sept 2021QA/QC Inspector
Aug 2018 - Sept 2021QA/QC Inspector
Aug 2018 - Sept 2021QA/QC Inspector
Aug 2018 - Sept 2021

Meraki Global Energy LLC
Oct 2022 - Mar 2023Mechanical EngineerT-BOX REINFORCEMENT, TOGGLE ARM REPLACEMENT & REPAIR, LANDING BAR, ADDITIONAL JACKET PLATE, PUTTING INSULATION IN LANDING BAR,REPLACEMNT OF BUSH PIN & WELDING, GT left and right side of boiler installation of H-Beams to reduce vibration. Modification of the feet with required clearance level on the guide bar. Replacement of toggle arm & welding with toggle arm shaft Installation of new jacket plate & stiffener plate Removal & installation of landing bar Galantine damper Show less

Ajyaal fiberglass
Jul 2023 - nowRTR/GRP/GRE INSPECTOR🕵
Hyundai Engineering Co. Ltd.
Sept 2024 - nowQA/QC PIPING INSPECTORQA/QC PIPING INSPECTOR
Licenses & Certifications

APPROVED QC PIPING INSPECTOR
AramcoMay 2019
Languages
- enEnglish
- arArabic
- hiHindi
Recommendations

Yiqing bao
Search for the next step in career with finance expertise and willingness to try new thingsBasel Metropolitan Area
Namrata tripathi
IIM Ahmedabad PGP '24 | RIL | NIT Calicut' 19Ahmedabad, Gujarat, India
Beatriz weege
Assistente Contábil II na Cooperativa Central AilosBlumenau, Santa Catarina, Brazil
Ahmed osama
Senior System Administrator| Certificated | NCA 6 |OCI 1Z0-1072-23 | AZ104 | MSCA 2016 | ITIL 4Cairo, Egypt
Supriya adiga, icf acc
Business / Executive / Career / Life CoachHyderabad, Telangana, India
Alan nolan, cfa
Investment Specialist Emerging Markets | Intl Operations DirectorLondon, England, United Kingdom
Sarah higgins
Registered Nurse at Northside Hospital ForsythCumming, Georgia, United States
Rinzin dorji
Technical officer at Bhutan TelecomBhutan
Shantanu dixit
Under ConstructionDurg, Chhattisgarh, India
Anwar budiyarto
System Engineer | System Administrator | Server & Virtualization Engineer | Wintel Engineer | Linux ...Area DKI Jakarta
Michael moffat
Coaching Motivated Accountants to Progress in their Career with Advanced English Communication and I...Bangkok, Bangkok, Tayland
Hollie stenson
Founder & CEO at WOOMIR (WorldWide Offices of Making It Right)Los Angeles County, California, United States
Brice lambin
Chief Revenue Officer (CRO) - Ex-CriteoGreater Lille Metropolitan Area
Jonathan smith
Senior Microsoft Support / IT Systems EngineerCity of Johannesburg, Gauteng, South Africa
Fahima bintee jamal
Senior Manager, Corporate AffairsDhaka, Bangladesh
Alejandro montes de oca padilla
--Mexico
Ayesha leena
HR Delivery Specialist at Ericsson Bangladesh LtdDhaka, Bangladesh
Ashish soundalkar
Senior Product Designer at HowNowMumbai, Maharashtra, India
Wasilios lekkas
Performance Marketing @Personato Deutschland | SEA | Google Ads | BBA, International BusinessKrefeld, North Rhine-Westphalia, Germany
Sarah west
Senior Manager of Product Development & Cost Accounting at Nectar Life | Driving Innovation, Product...Las Vegas, Nevada, United States
...