Ir. Basit Sidiq

Ir. basit sidiq

bookmark on deepenrich
location of Ir. Basit SidiqKlaten, Jawa Tengah, Indonesia
Phone number of Ir. Basit Sidiq+91 xxxx xxxxx
Followers of Ir. Basit Sidiq601 followers
  • Timeline

    Jan 2017 - Jan 2017

    Survey Engineer

    PT Jhonlin Batu Mandiri
    Jan 2018 - Nov 2018

    Mine Engineer

    CV. VTA Consulting
    Jan 2018 - Jan 2021

    Mineplan Engineer PPA - BIB

    Putra Perkasa Abadi
    Tanah Bumbu, South Kalimantan, Indonesia
    Current Company
    Feb 2021 - now

    Engineering Superintendent

    PT Adimitra Baratama Nusantara
    Current Company
    Nov 2023 - now

    Technical Manager

    PT Manggala Indo Lisah
  • About me

    Mining Professional | Technical Strategic Planning

  • Education

    • Institut teknologi nasional (itn) yogyakarta

      2013 - 2018
      Bachelor of engineering - be mining and mineral engineering
    • Universitas mulawarman

      2022 - 2023
      Chartered professional engineer (cpeng) engineering

      Aktivitas dan Kegiatan Sosial:The Institution of Indonesian Engineers (PII) Chartered Professional Engineer

  • Experience

    • Pt jhonlin batu mandiri

      Jan 2017 - Jan 2017
      Survey engineer

      - Analyze the land function map- Create a boundary of the region application of the company- Revise and evaluate the boundary area of the company’s application- Determine the division of area functions- Create progress report based on actual progressSoftware Autocad, Arcgis

    • Cv. vta consulting

      Jan 2018 - Nov 2018
      Mine engineer

      - Running Pit Optimization based on market coal price index- Provide LOM Pit Design based on Pit Optimization- Running LOM Mine Planning- Provide Design Pit and Waste Dump- Provide Water Management ProjectSoftware : Minescape 4, Minex 6, Xpac 7.12, Arcgis, WMS (Water Management System)

    • Putra perkasa abadi

      Jan 2018 - Jan 2021

      Volume 20 unit PC20001. Provide plan and meeting monthly, quarterly and yearly mine planning2. Produce, maintain and modify designs for pit and dump3. Do coordination with owner Geotech about recommendation pit and dump design4. Dewatering plan and monitoring due to mining progress5. Monitor production performance and ensuring it is in alignment with mine plans and schedule6. Do reconciliation with geologist and survey about coal mining activity7. Maintain mine safety standards at all time8. Provide weekly drill blast planning based on mine planning9. Make coordination with survey for field guidance stake out10. Make coordination and give guidance for Drill Blast Supervisor to location that needed to be prepared11. Do weekly drill blast meeting with owner, other contractor and explosive subcontractor12. Provide and review weekly mine planning meeting based on long term mine planning13. Provide daily coordination and review meeting with operational14. Provide and make coordination with operational about daily mine planning15. Provide temporary pit design16. Make coordination with survey for field guidance stake out17. Control and monitor actual daily mining operational18. Provide report and review for daily activity and actual production19. Make three month rolling plan base on yearly mine planning20. Make the detail of monthly mine planning base on three month rolling plan21. Make weekly forecast production planning base on equipment productionSoftware : Minescape 4., 7., Xpac 7., Spry1.5 Lihat lebih sedikit Volume 4 unit PC2000 and 3 unit PC1250and thanVolume 1 x PC2000 and 5xPC1250-Provide Daily, Weekly, and Monthly Plan-Running 3Month Rolling Plan-Running Scheduling with RPM Xpac 7.13-Provide all design pit, waste dump, general, etc-Provide blasting location plan based on scheduling-Provide weekly and monthly review-Do all coordination with production department to do the plan-Do all coordination with owner engineer for all plan and targetSoftware : Minescape 7, Xpac 7. Lihat lebih sedikit

      • Mineplan Engineer PPA - BIB

        Jan 2020 - Jan 2021
      • Mineplan Engineer PPA - ABN

        Jan 2018 - Jul 2020
    • Pt adimitra baratama nusantara

      Feb 2021 - now

      -Running Pit Optimization -Running & Create LoM Document-Running & Create Yearly Mine Plan-RKAP RKAB-Pit Development -Project Development-Technical Pit Review for Bussines Development-Pit Extension Project-Expansion IUP project-CAPEX with multi scenarios -Create technical Joint Operation Option, technical, mineplan, scema, etc, document to jo company-Simple costing financial pit/project development Achievement - On First 3 Month, saving cost +$240.000- Second 3 Month on this position, saving cost +$45.000 Lihat lebih sedikit Developing FS project- Pit X - Pit Y - Pit Z .-. Provide details technical data - Pit design - Dump design - SP design - Weightbridge - Public road - LOM Fleet and Production Planning - Detile scheduling scenario based on manual and auto scheduling with RPM Xpac - Face Position based on Scheduling with RPM Xpac - Disturbed boundary area - Data for land acquisition - Reclamation Planning - Dewatering Planning - Detile simple costing LoM PitProvide equipment requirement - OB Coal Loader & Hauler - Support Equipment Doozer, Pump, WT, etc*Running LoM Stage Options for best revenue*Running LoM Stage Options based on changing conditions*Running LoM Stage Options based on conditions that may occur-Provide RKAP and RKAB -Provide production schedule and Weekly, Monthly, 3Month Rolling Plan, and Yearly PlanSoftware Minescape 2021, Xpac 7.15 Lihat lebih sedikit

      • Engineering Superintendent

        Jan 2024 - now
      • Mineplan Superintendent

        Jan 2023 - Jan 2024
      • Senior Mineplan Engineer

        Jun 2022 - Jan 2023
      • Spv Mineplan Engineer

        Feb 2021 - Jan 2022
    • Pt manggala indo lisah

      Nov 2023 - now
      Technical manager
  • Licenses & Certifications

    • Corporate financial distress

      Pt portal aplikarya indonesia
      Jan 2018
    • Precourse lower operation authority

      Pt. sinergi safetypreneur multiusaha
      Jan 2018
    • Open cut coal mine scheduling & haulage modeling

      Vta consulting
      Jan 2018
    • Open cut coal mine scheduling

      Vta consulting
      Apr 2018
    • Class d firefighters

      Pt. sinergi safetypreneur multiusaha
      Mar 2018
    • Training geology database estimate reserve pit optimization and pit design in gold deposit

      3dmine mining software
      Mar 2016
    • Ceo talk ogip 2018

      Himpunan mahasiswa teknik perminyakan (hmtm) upn "veteran"​ yogyakarta
      Feb 2018
    • The lower operation supervisor (pop)

      Ppsdm geominerba
      Jan 2019
    • Advance mine scheduling

      Lenusa consulting
      Mar 2018
    • Hazard identification risk assessment & determination control

      Pt adimitra baratama nusantara
      Jan 2018