Innocent Mhuriengwe

Innocent Mhuriengwe

Engineer Intern (Operations and Maintenance)

Followers of Innocent Mhuriengwe2000 followers
location of Innocent MhuriengweZimbabwe

Connect with Innocent Mhuriengwe to Send Message

Connect

Connect with Innocent Mhuriengwe to Send Message

Connect
  • Timeline

  • About me

    MEng Manufacturing Systems & Operations Management| Mechatronics Engineer | Electrical & Instrumentation | Solar System Design | Maintenance & Reliability | Project Management | Quality Control |

  • Education

    • Chinhoyi University of Technology

      2015 - 2019
      Honours degree Mechatronics Engineering 2.1 - Upper Second Class

      Activities and Societies: Chess

    • National University of Science and Technology

      2023 - 2024
      Master of Engineering in Manufacturing Systems and Operations Management ENGINEERING
  • Experience

    • ZIMBABWE POWER COMPANY

      Mar 2018 - Dec 2018
      Engineer Intern (Operations and Maintenance)

      • Calculation of plant efficiency and making recommendations on operational improvements.• Monitoring plant set parameters and carrying out optimisation.• Calibration and installation of process instruments.• Attending to faulty process control equipment, which include measuring instruments, indicators, control valves, controllers...etc• Troubleshooting telephone network systems and hardware to detect faults and implement corrective actions.• Carrying out preventive and corrective maintenance on electrical and mechanical equipment (conveyer belts, pumps, motors, boilers...etc)Participated in continuous plant operational improvement projects, such as the condenser cleaning project, which helped increase power generation from a range of 12–16 MW to a range of 20–28 MW. Show less

    • Golden Springs Academy of Science and Technology

      Jan 2020 - Apr 2021
      Solar Technician

      • Preparing quotations for clients (schedule of labour, materials and costing).• Design and installation of solar systems.• Design and installation of steel structure stands, for solar panels and tanks• Industrial and domestic electrical wiring.• Installation and sizing of pumps, for irrigation systems.

    • Maka Irrigation

      Apr 2021 - Oct 2021
      Quality Control Engineer/Supervisor

      • Introducing tools and procedures that would help enhance the quality system.• Ensuring that the supplied material meets the set specifications. • Testing for mechanical conformance on produced components (measurements, quality of welds, and stress analysis).• Collaborating with the design and production teams to ensure that all faulty components get rectified on time.• Providing approved drawings on every workstation and making changes to design recommendations, where necessary.• On-site inspections of the performance of installed pivots.• Compilation of daily and monthly quality reports.• Carrying out investigations on root causes of noted defects and providing long term solutions.• Supervising the quality department personnel. Achievements:• Managed to reduce the production of defective components, from a defect range of 10-15% to a defect range of 0-3%.• Championed the production of a fault card system, which helped facilitate investigations and corrective actions on noted faulty products, thereby preventing the production of large volumes of faulty components and hence reducing production costs.• Introduced a traceability checking system, which effectively helped to track the specific work stations through which produced components would have gone through and also responsible production operators. Show less

    • SINOHYDRO GROUP LIMITED

      Oct 2021 - Apr 2022
      Assistant Mechanical Engineer

      I was part of the team that was responsible for the construction of the Hwange Power Plant Expansion Project (2 x 335 MW, valued at US $1.5 billion), and my responsibilities included:•Carrying out onsite safety inspections on machinery and specific work areas.•Reviewing installation procedures and making recommendations, where necessary.•Inspection of onsite installations•Assessing the quality of raw materials and performing compliance tests, such as hydraulic tests on valves to be used.• Facilitating the performing of non-destructive welding tests on pressure parts.• Systematic reporting on project status and organising necessary project elements, to help ensure that works get completed on time.• Training operators on safe equipment operational and diagnostic procedures.• Hazard Identification and Risk Assessment (HIRA) documentation.Major Test Participation:•Successful unit 7 Boiler hydraulic pressure test.•Successful condenser water filling test.Standards:ASME, IEC, RGN 279 Show less

    • ZIMBABWE POWER COMPANY

      Apr 2022 - Apr 2024
      Graduate Engineer Control & Instrumentation

      I have had the privilege to work at the organisation's Hydropower and Thermal power plants. I have managed to work across most sections (Operations, Mechanical, Electrical and Control & Instrumentation). Part of the team that was responsible for successfully commissioning the Hwange Power Plant Expansion Project (2 x 335 MW units). Successfully installed conveyer belt scales on the Harare Power Station’s conveyer belts installation project. Initiated the design and installation of a turbine condition monitoring system panel for Harare Power Station. Responsibilities:• Installation, calibration, commissioning, and repair of electrical, control, and instrumentation equipment.• Analysing data trends from monitoring systems, for optimisation to enhance plant performance, reliability and efficiency.• Carrying out quality checks on control and instrumentation systems, and electrical installations to ensure compliance with industry standards and regulatory requirements.• Involved in project planning, progress monitoring, and review of installation procedures.• Preparing maintenance test results reports, troubleshooting steps, and coming up with technical justifications for new plant equipment. Show less

  • Licenses & Certifications