  • Timeline

  • About me

    Project Manager at BWID

  • Education

    • Truòng Dai hoc Giao thông vân tai Thành phô Hô Chí Minh

      2003 - 2008
      Bachelor's degree Civil Engineering
    • Ho Chi Minh University of Technology

      2013 - 2017
      Master's degree Underground construction
  • Experience

    • MCC

      Jun 2008 - Jun 2010
      Site Engineer

      o Project : Phu My bridge- Approach bridgeo Duties : Site task as assignments

    • BAUER

      Jun 2010 - Feb 2012
      Site & QC Engineer

      o Project : - Khai Thong complex & The Everich 2: DW and bored pile packageo Duties : Site task as assignments

    • Wadrillco

      Feb 2012 - Dec 2014
      Site Engineer - Site Manager

      o Project : - Serenity : DW & Bored pipe package- The One HCM: DW & Bored pipe package- Ong Co bridge: Bored pile package- Neak luong bridge: Bored pile package - Cambodiao Duties :- Site overall operation & managing subcontractor - Shop, method preparation & Site quality assurance.- Cost control: Cash flow, tracking, payment with sub-con & client- Tendering preparation: Method preparation & cost estimation

    • Obayashi Corp

      Jan 2015 - Dec 2015
      Senior Site Engineer

      o Project : Nam Ngiep 1 Hydropower: Regulation Dam - Laoso Duties : Managing sub-contractor to ensure site quality, safety and schedule

    • KELLER

      Jan 2016 - Mar 2018
      Senior Engineer

      o Project : - Changi Airport Expansion: Vibro compaction - Singapore - Rapid Refinery: Infrastructure package - Malaysiao Duties : Managing sub-contractor and site operation, ensure site progress, quality, safety and schedule

    • Kolon Global Corp (003070)

      Mar 2018 - Dec 2018
      Project Assistant Manager

      o Project : Binh Duong Environment Improvement: Sewage treatment systemo Duties :- Checking site progress- Control monthly payment, variations of sub-con.- To assist in looking for new project

    • Bwid

      Jan 2019 - now
      Project Manager

      o Project: • Ready built Factory: BB_3.6 ha, MP3_10.2 ha, MP4: 11 ha • Ready-built Warehouse: Vsip2a_8.0 ha, MP4: 27.0 ha; TDHB: 5.3 ha (2 stories with Ramp) • Built to suit warehouse: TPT4.TT1: 5.9 ha, TT4.KB4-1: 6 ha (Grade 1 & Type A Project)o Position: Project Managero Duties: Manage project from permitting stage to final inspection prior to operation- Coordinate and manage the permitting consultant/ Designer in permitting stage- Involving in the tendering in technical response and contractor evaluation- Overall site management: Schedule, Cost, Quality & Safety - Well managing the contractor complying with the Fidic contract- Coordinate with Designer; QS consultant- Liaise with other parties for FF inspection, As-built inspection with authority & pink book application- Ensure the outcome and legal satisfaction of the project Show less

  • Licenses & Certifications

    • Grade 1 construction management

      Ministry of Construction
    • Grade 1 construction Supervision

      Ministry of construction
    • Decision-Making Strategies

      LinkedIn
      Nov 2017
      View certificate certificate