    Mechanical Engineer | EPC | MEP | Execution | Project Management | Construction | HVAC | Facility Management | O&M

  • Education

    • University of Engineering and Technology, Peshawar

      2015 - 2019
  • Experience

    • Tarbela Power House ( WAPDA ) - Topi

      Jul 2017 - Aug 2017
      Internee Engineer

      Install, operate, maintain, and repair a variety of operation and maintenance machines, equipment, power tools, and special purpose equipment (Turbine, Governor, Valves, Pumps, Compressors and Auxiliary equipment).

    • SUI NORTHERN GAS PIPELINES LIMITED (SNGPL) - Peshawar

      Sept 2018 - Aug 2019
      Research Engineer

      Worked on a research project under facility of SNGPL, Mechanical Engineering Department, UET Peshawar.Project include vibrational analysis of suspended gas pipelines through National Instruments data acquisition software ( Lab View ).

    • PCSIR LABORATORIES COMPLEX Peshawar

      Jul 2019 - Aug 2019
      Internee Engineer

      Practical exposure to latest CNC Lathe Machine, it’s operation, working and programming (G and M) codes.

    • Haier Pakistan

      Oct 2019 - Aug 2023
      EXECUTIVE ENGINEER (MAINTENANCE AND IMPROVEMENT)

      • Developed and implemented preventive maintenance plans for Mechanical & Electrical assets to ensure reliability and uptime.• Implemented Total Productive Maintenance (TPM) across various systems and machines to enhance performance and uptime.• Planned and prioritized operations for maximum performance and minimum delay.• Conducted routine inspections and Planned Preventive Meetings (PPM) for efficient facility management.• Managed spare parts inventory and tracked expiration dates for optimized inventory management.• Promptly diagnosed and addressed mechanical issues to minimize downtime.• Coordinated with cross-functional teams to resolve complex technical problems.• Evaluated and upgraded high-speed rotary machines.• Planned and executed projects to enhance efficiency and extend equipment lifespan.• Conducted root cause analysis and implemented corrective actions for recurrent issues.• Developed and managed maintenance budgets without compromising quality.• Implemented an effective asset management system.• Documented unscheduled or emergency maintenance activities.• Improved production capacity and overall efficiency through systems, processes, and equipment enhancement.• Implemented various process improvement techniques such as LEAN Manufacturing, Kaizens, Quality Control Circle (QCC), and Single-Minute Exchange of Die (SMED).• Controlled over aging of unutilized material through efficient use of inventory (SAP and WMS). Monitored material flow to avoid shortages and excesses.• Identified and resolved production bottlenecks.• Implemented Value Stream Mapping (VSM) for process improvement in fabrication and assembling lines.• Ensured compliance with relevant safety regulations and standards. Show less

    • Artificial Engineering

      Oct 2023 - Sept 2024
      Site Engineer (Mechanical)

      o Assembled Construction 3D Concrete Printer GL-3DPRT-C4 (16*24*10 m) at King Salman Park site including installation, testing and commissioning of all the mechanical, electrical, hydraulic and computer control systems.o Executed day-to-day operations of all the components of machine for 3D concrete printing process.o Precisely set up and calibrated the machine, ensuring accurate positioning of moving parts and sensors.o Managed the electrical components of the machine including power & comm wiring, circuitry and control system.o Conducted regular inspections of mechanical, electrical, and robotic systems to identify issues and ensure compliance with safety standards.o Developed and implemented preventive maintenance programs for mechanical systems, contributing to increased system reliability and longevity.o Responded promptly to equipment malfunctions and breakdowns, coordinating timely repairs to minimizedowntime.o Monitored machine performance continuously.o Conducted in-depth diagnostics on mechanical, sensor, and electrical components to repair or replace faulty parts.o Troubleshot technical issues and contributed to the improvement of engineering solutions.o Maintained detailed records of machine performance, maintenance, repair activities, and troubleshooting procedures.o Collaborated with a diverse team on projects related to designing and executing 3D concrete printing constructiono Implemented and enforced quality control processes and safety procedures on the machine. Show less

    • Advanced Energy Company(AECC)

      Nov 2024 - now
      Mechanical Engineer

      Ma'aden Ras Al Khair - 110/34.5KV Substation• Led and managed MEP projects from conception to completion ensuring adherence to project plans, budgets, and timelines.• Developed comprehensive project plans, budgets, and timelines, and monitored progress throughout the project lifecycle.• Coordinated with designers, engineers and contractors to ensure effective communication.• Oversaw design, installation, and maintenance of MEP systems, including HVAC, electrical, plumbing, service water, backup energy and fire protection and alarm systems.• Ensured compliance with building codes, regulations, and safety standards, conducting inspections and QC checks.• Managed project budgets and costs, optimizing resources and ensuring projects were completed within budget.• Supervised and mentored teammates, providing guidance, training and support to staff.• Resolved issues and conflicts that arose during the course of projects, implementing effective solutions to keep projects on track.• Stayed abreast of industry trends, best practices, and new technologies in MEP, incorporating innovative solutions into project designs. Show less

  • Licenses & Certifications