  • Timeline

    Jun 2012 - Mar 2014

    Graduate Engineer

    URS Corporation, An AECOM Company
    Apr 2014 - Dec 2018

    Assistant Resident Engineer

    AECOM
    Hong Kong
    Jan 2019 - Jun 2020

    Geotechnics Engineer

    Atkins
    Current Company
    Jun 2020 - now

    Senior Marine Manager

    CLP
  • About me

    Senior Marine Manager at CLP

  • Education

    • University of leeds

      2010 - 2012
      Master of science - ms structural engineering
    • Loughborough university

      2007 - 2010
      Bachelor's degree civil engineering
  • Experience

    • Urs corporation, an aecom company

      Jun 2012 - Mar 2014
      Graduate engineer

      Main Projects:Bahrain Ship Repairing & Engineering Co. Facilities ExpansionConceptual Design for Coastal Development at TuasFeasibility Study on the Mooring Analysis for Chevron Tsing Yi Oil TerminalResponsibilities:Responsible for the detailed designs on various infrastructure projects included but not limited to the following: reinforced concrete pile deck structures and bulkhead structures, breasting and mooring dolphin supported by steel tubular piles, blockwork and sloping seawalls, etc. Show less

    • Aecom

      Apr 2014 - Dec 2018

      Projects: Container Terminal 9 - Quay Structural Alterations and Additions WorksContainer Terminal 1&2 - Quay Structural Alterations and Additions and Dredging WorksContainer Terminal 2, 5 & 9 - Fender System Upgrading and Rehabilitation WorksResponsibilities:• Contract administration and construction supervision of the alterations and additions works on a reinforced concrete pile deck and a bulkhead wall structure. The scope of works included trench excavation, installation of new post-tensioning tie-back system, reinforced concrete structural enhancements, modification on the existing seawall, dredging works and application of Impressed Current Cathodic Protection system. Show less Main Projects:Tung Chung New Town Extension (East) - Design and ConstructionYau Tong Bay Redevelopment - Site Formation and Alterations and Additions Works Revitalisation of Avenues of Stars-Salisbury Garden, Tsim Sha TsuiContainer Terminal 1 & 2 - Structural Alteration and Dredging Works (Design and Tender Stage)Responsibilities:• Detailed design on the seawall works, Structural Alternation and Additional works for the container terminals• Review Ground investigation data• Government liaison in particular Buildings Department and Marine Department.• Tendering and tender assessment. • Independent Checking Engineer on various nearshore infrastructure projects. Show less

      • Assistant Resident Engineer

        Jan 2017 - Dec 2018
      • Assistant Engineer

        Apr 2016 - Dec 2016
      • Assistant Resident Engineer

        Apr 2014 - Mar 2016
    • Atkins

      Jan 2019 - Jun 2020
      Geotechnics engineer

      Main Project:ICE services for the New LNG Terminal at Port Tema,GhanaICE services for the new Port and Container Terminal at Tema, GhanaSite Formation for the Shatin Race Course, MME and Carpark Redevelopment, HKDesign and administration of construction of public infrastructure works for the Piers in the West Kowloon Cultural District, HK

    • Clp

      Jun 2020 - now
      Senior marine manager

      Hong Kong Offshore Wind Farm (HKOWF) Development • Participate in the project planning and development of the first offshore wind farm project in HK, which comprise of wind turbine generators and offshore substation with suction bucket jacket as foundations and subsea cables.• Identifying the project’s potential risk under the construction and operation stages.• Reviewed the consultant’s schematic design on the HKOWF foundations, topside structure and marine related aspects. • Responsible for tender documents preparation and pre-assessments in related to structure design, marine and construction aspects.Hong Kong Offshore LNG Terminal (HKOLNG) Project • Responsible for the project and construction management of the first Offshore LNG Terminal project in HK, which includes 6 mooring dolphins, 3 breasting dolphins and a 45km long subsea pipeline across the Southern and Western waters of HKSAR.• Reviewed the Contractor’s detailed design and construction documents related to structural, geotechnical and marine disciplines.• Support and guide the Contractor on the pre-construction preparation works including the vessel operating licenses and working Visas applications, facilitate the Marine Warranty Surveyor certifications, vessel typhoon evacuation plan, MTIA, MDN, AIP SUP etc. • Facilitate the Contractor on the marine construction management, including liaising with the Marine Department, marine stakeholders and other relevant Authorities for MDN applications and execution of typhoon evacuations, etc. • Supervising and managing the Construction offshore construction works on the Principal Installation Vessels. Show less

  • Licenses & Certifications

    • Member

      Hkie civil division
    • Chartered engineer

      Institution of civil engineers (ice)
    • Rpe

      Engineers registration board