Ryan Vega

Ryan Vega

Junior Site Engineer

Followers of Ryan Vega140 followers
location of Ryan VegaBasak, Svay Rieng, Cambodia

Connect with Ryan Vega to Send Message

Connect

Connect with Ryan Vega to Send Message

Connect
  • Timeline

  • About me

    QA/QC Engineer at Kyeryong Construction Industrial Co. Ltd

  • Education

    • TUP-T/Adamson University

      2002 - 2009
      BSCE Civil Engineering
  • Experience

    • Ultra Construction & Engineering Co.,Ltd.

      Mar 2009 - Mar 2011
      Junior Site Engineer

       Responsible for management of material and human resources on site Perform the actual shaft mapping on site to classify the types of material and to propose necessary support needed. Assist engineers in designing layout and site research Coordinate with the site inspectors to check the ongoing project status and development Prepare Request for Inspection-Approval (RFIA) to the engineer’s representative Preserve reports of contractors for proper execution of key projects on a daily basis Ensure the material quality as per approved standards and specifications Provide inputs for budget planning In-charge for crew training and internal scheduling Observe safety rules and regulation always Show less

    • Infratex Environmental Services, Ins.

      Jul 2011 - Mar 2012
      Project Site Engineer

       Overall objective is to monitor, reporting, managing subcontractor and conducting site visits to oversee project activities. To ensure that the project contract conditions of sales are met, performed conforming to GSE/ISEI QA/QC Standards of HDPE lining installation and to be completed as scheduled with zero delays. Keeping a complete set of “For Construction” drawings and or “HDPE Liner Pre-panelling Layout” drawing on hand for reference. Review IESI standards and confirm that completely filled out in daily basis. Prepare site instructions for any variations or instructions provided by the client with counter signed by the client’s representative. Documentations are prepared in daily basis. Ensure all workers have required PPE and know how to utilize them correctly and when and where they are required to be used. Daily coordination with the client’s site representative for the project regarding their scope of works. Closely monitor any and all situations that might result standby time. Witness all testing needed. Prepare internal schedule for sub-contractor. Conduct Tool Box Meeting. To ensure all workers have required PPE and know how to utilize them correctly and when and where they are required to be used. Show less

    • Capcons Philippines Corp.

      May 2012 - Jul 2013
      Concreting Engineer/Formworks Engineer

       Monitoring for schedule and installation of formworks as well as support for disturbed and undisturbed shoring. Responsible for schedule of concreting works. Responsible for management of materials and human resources on site. Preparation of RFIA or Request for Inspection – Approval Documentations are prepared in daily basis Coordination with the the project engineer regarding work status and developmnet. To ensure all workers have required PPE and know how to utilize them correctly and when and where they are required to be used. Show less

    • Century Limitless Corporation

      Sept 2013 - Jun 2014
      Structural QC Engineer

       Overall implementation and monitoring daily activities at site. To make sure that all activities must be in approved procedure and drawings. Inspection of formworks preparation and installation, rebar works, concreting works prior and during activities. Coordination with the the project manager regarding work status and developmnet. Conduct Tool Box Meeting. Ensure that all materials must be approved as per project requirements. Reports are prepared in daily basis such as accomplisment reports. Prepare internal quality trainings and seminars. Ensure all workers have required PPE and know how to utilize them correctly and when and where they are required to be used. Show less

    • Yuksel Holding A.S.

      Jun 2014 - Apr 2016
      QA/QC Inspector

       Overall assigned for inspection of road works including but not limited in backfilling works, aggregates laying, asphalt works and concreting utilities for Zone 3 and 4 Checking and inspection of laying aggregate road base course prior to asphalt works in terms of surface preparation, leveling, compaction test, sampling of materilas and application of prime coat. Full time assigned for inspection of asphalt laying including tack coat rate of application, laying and compaction procedure and monitoring of asphalt temperature prior and during activities. Coordinate and assists clients/engineers representetative for any inspection needed.  Responsible and assist for closure of NCR’s (Non-Conformance Report) / QOR’s (Quality Observation Reports) / CAR’s (Corrective Action Report) and outstanding INR’s (Inspection Notice Reports). Issuance of Internal Non-Conformance Report (NCR) for not complying in project standards and specifications. Ensure that all activities have apprroved Mixed Design, Method of Statement (MS) including Inspection Test Plan (ITP), Approved Shop Drawings and Inspection checklist. Responsible for checking of delivered materials. Sampling of materials such as rebars, concrete ingredients, road base course, asphalt, tack coat and prime coat as per QCS and LPS Standards. Coordination and reporting to Senior QA/QC Engineer regarding the project status or site status and development. Documentation such as filing reports in Concreting (Pour Cards), Asphalt laying sheet, daily site inspection and Official Test Reports. Show less

    • PORR Group

      Sept 2016 - Apr 2019
      QA/QC Inspector

       Overall assigned for inspection of structural works including but not limited in raft foundation, pile cap foundation, columns, walls (shear wall, retaining wall, raker wall support, core wall, etc.), beams, column roof support and slabs (base slab, suspended slab and slab on grade) at East, Nort-east and North Stadium area as well as Community Market. To ensure that all activities has apprroved Mixed Design, Method of Statement (MS) including Inspection and Test Plan (ITP), Approved Shop Drawings and Work Inspection checklist. Full time assigned for inspection of non-structural works including but not limited in surface preparation prior to waterproofing and grouting, waterproofing installation and grouting works. Implementing the requirements of the specifications and the manufacturer’s recommendations. To maintain the highest standard of Quality works as per Client requirements, QCS 2014 and PQP. Assisting for closure of NCR’s (Non-Conformance Report) / QOR’s (Quality Observation Reports) / CAR’s (Corrective Action Report) and outstanding IRW’s. Issuance of Internal Non-Conformance Report (NCR) for not complying in project standards and specifications. Responsible for checking of delivered materials and, Maintain and keeping QA/QC records. Show less

    • Kyeryong Construction Industrial Co Ltd (013580)

      Jun 2019 - now
      QA/QC Engineer

       Conduct inspection for earthworks excavation including but not limited in setting out, surface preparation, installation of support system for slope protection, blasting excavation, and seggragation of suitable materials in the approved stock pile. Overall assigned for inspection of Diversion Tunnel including but not limited in blasting works preparation, blasting works, forepoling installation and grouting works, steel ribs installation, rock anchoring, wire mesh installation, shotcreting works, rebars installation and lining conreting works. Full time assigned for inspection of structural works including but not limited in Intake Tower Structure foundation and wall, bridge pier and abutment, and spillway structure. Overall control for the laboratory test of project materials used for Main Dam such as soil, concrete and shotcrete, aggregates and rock for rock filling. Preparation of mix design and conducting trial mix for concrete, shotcrete and grouting as per project requirements and specification. Ensuring that all machine, plants (batching plant and crusher plant) and measuring equipment used for the project must have updated calibration certificates. Implementing the requirements of the specifications and the manufacturer’s recommendations. To maintain the highest standard of Quality works as per Client requirements, Technical and General Specification. Issuance of Internal Non-Conformance Report (NCR) and Corrective Action Report (CAR) for not complying in project standards and specifications. Responsible for checking of delivered materials and, Maintain and keeping QA/QC records. Show less

  • Licenses & Certifications

    • ISO 9001 Lead Auditor - Quality Certification

      Chicago Training Center (CTC)
      Mar 2018
    • Auto CAD

      Meralco Foundation, Inc.
      Nov 2007