Saulo Santiago

Saulo Santiago

Internship in the Dispatching Department

location of Saulo SantiagoQatarEnergy LNG

Connect with Saulo Santiago to Send Message

Connect

Connect with Saulo Santiago to Send Message

Connect
  • Timeline

  • About me

    Drilling Engineer Specialist en Qatargas

  • Education

    • Arts et Métiers ParisTech - École Nationale Supérieure d'Arts et Métiers

      2007 - 2009
      MSc in Mechanical Engineering
    • Universidad de Valladolid

      2003 - 2007
      MSc in Mechanical Engineering
    • IFP School

      2009 - 2010
      MSc in Petroleum Engineering and Project Development
  • Experience

    • ArcelorMittal

      Jun 2008 - Oct 2008
      Internship in the Dispatching Department

      - Logistical flows optimization.- Stocks and workforce management.- Increase of Dispatching Department productivity.

    • Cepsa

      Sept 2010 - Jan 2013

      - Technical support for drilling programs preparation, cost estimations, incidents evaluation, call for tenders and contracts extensions.- Carried out offset well reviews, performance analysis, NPT analysis and time & cost analysis.- Use of Landmark software: well trajectories design and optimization, casing seat selection, casing design, simulations.- Operations follow up with real time services.Main constraints faced: foothills environment, shale swelling, caves, challenging cement jobs, high environmental standards. عرض أقل

      • Junior Drilling Engineer

        Mar 2011 - Jan 2013
      • Wellsite Drilling Engineer

        Sept 2010 - Feb 2011
    • TotalEnergies

      Feb 2013 - Mar 2020

      Responsible for:- Preparation & execution of 2 shale oil development wells in San Roque block.- 100 x WH & XT CFT.- Final engineering and operations follow-up of a uncommon operation: Reparation of the surface casing of a well which was found parted at the cellar level.- Standard tight gas well in Aguada Pichana block.- One-off exploratory oil well preparation & execution: Pilot hole + P&A operation + sidetrack + horizontal drain in La Escalonada block.Main issue faced: Operations carried on a strict cost reduction environment.Results: Contracts renegotiation achieving an average of 20% cost reduction. MPD equipment successfully used to improve ROP. Drilling with Casing operations optimized achieving better results compared to conventional drilling and casing running. عرض أقل Responsible for 2 drilling campaigns in the Pointe Noire Grand Fond offshore basin, from the engineering process to the operations follow-up and lessons learnt capitalization.- Infill development with a Pulling Unit (upgraded to cope with drilling operations): 2 medium radius re-entry wells.- Infill development with a Tender Rig: 2 new wells + 1 re-entry well.Main issues faced: Fast track process with few lessons learnt from previous campaign. Long term planning modifications. High vibrations level expected. Differential sticking due to drilling in depleted reservoirs. CAPEX optimization.Results: Continuous NPT reduction along the campaign. Average ROP increased by 30%. No downhole tool failure due to vibrations. Number of bits reduced by 55%. Engineering strategy validated for future developments. عرض أقل

      • Senior Drilling Engineer

        Apr 2018 - Mar 2020
      • Senior Drilling Engineer

        Aug 2015 - Mar 2018
      • Drilling Engineer

        Feb 2013 - Jul 2015
    • QatarEnergy LNG

      Mar 2020 - now
      Drilling Engineering Specialist - Secondee in QatarEnergy LNG
  • Licenses & Certifications

    • IWCF

      Feb 2013
    • BOSIET

      OPITO
      Mar 2013