
Sivaramakrishnan G
Production & Process Engineer

Connect with Sivaramakrishnan G to Send Message
Connect
Connect with Sivaramakrishnan G to Send Message
ConnectTimeline
About me
Senior Manufacturing Engineer at Malar Manufacturing Services Pte Ltd
Education

Mepco Schlenk Engineering College
2004 - 2008Bachelor of Engineering (B.E.) Mechanical Engineering 80.4%
Nanyang Technological University
2014 - 2015Master of Science (MS) Manufacturing Systems & Engineering 4.3/5.0Modules Taken:1. MANUFACTURING & SERVICE OPERATIONS MANAGEMENT2. SYSTEMS SIMULATION & MODELLING3. ADVANCED MANUFACTURING PROCESSES4. MANUFACTURING CONTROL & AUTOMATION5. PRODUCT DESIGN & DEVELOPMENT6. CORPORATE RESOURCE PLANNING7. QUALITY ENGINEERING8. MANAGEMENT OF GLOBAL MANUFACTURING9. ADVANCED METROLOGY & SENSING SYSTEMS10. OPTICAL METROLOGY & INSTRUMENTATION
Experience

Caparo Engineering India pvt ltd
Jul 2008 - Aug 2011Production & Process EngineerKey Responsibilities Managed 50 Persons in shift with 2 Production Press lines capacity of 1000T, 800T, 600T, 400T Press & 250T-110T presses. Planned production capacity & manpower for maximum utilization, ensured continuous improvement in productivity, Process & quality. Educated & communicated with team members in applying problem solving techniques through QC to solve problems relating to work area. Continuously monitored Schedule Adherence & Volume adherence level to satisfy the customer. Reduction of cycle time by continuous improvement methods as a CI leader.Chief Accomplishments Saved about INR 1.5 million by maximum utilization of end bits (scrap material) for producing child parts and RM yield improvements. Implementation of ASES (Rating B) & MMOG (Material Management Operational Guideline) documentation. Done poka yoke in process and reduced the rejection rate by 15%. Conducted Tool Buy off for NISSAN X02B Car in Thailand. Show less

Daebu Automotive India
Aug 2011 - Jun 2013Senior Manufacturing EngineerKey Responsibilities Headed 45 Persons in 2 shifts with Press line capacity of 1600T-Progressive press, 800T-Fine Blanking Press, 400T-Blanking Press & 250T presses-16. Co-ordinate with the entire team to achieve the production target, Customer PPM, Scrap cost reduction, Lead-time reduction, poka yoke, cycle time reduction and Accident time loss to meet the company target. Facilitator for the Quality circles & SGIA for continuous improvements projects. Lead and driven continuous improvement projects strategically aligned with the department key performance indicators (KPIs) together with the team, following structured Plan-Do-Check-Act (PDCA) approach. Prepared and presented the weekly and monthly MBO (Management by Objectives) to Top Mngt. Developed new process concepts for production optimization, yield improvement and develop guidelines for the sequencing of manufacturing activities on the shop floor (SOP).Chief Accomplishments Cost saving of about INR 1.8 million/annum by RM yield improvements and reduce NVA operations. Implementation of 100 PPM Rating documentation in manufacturing. Took a Major Role in Tool Try out for Renault H79 car & Hyundai i30 projects. Done poka yoke in production process and increased the production output by 20%. Show less

GESTAMP AUTOMOTIVE INDIA PRIVATE LIMITED
Jun 2013 - Jul 2014Senior Engineer - Operations,Lean ManufacturingKey Responsibilities: Throughput Improvement Projects across the plant Material Flow Improvement across the plant by value stream mapping Deploy Gestamp Lean Production system and Lean model line To own and improve the Kaizen culture among operations team and lead the productivity road map Process Optimization to reduce the variability in the process to improve the quality Train the manufacturing team to Lean Production system across the plant Line Balancing and Capacity Planning according to the Varying Customer’s Demand Long term Lean Projects and short term Kaizen,5S EventsChief Accomplishments: Cost saving of about 75 lakh rupees/annum by reduced change over time using Lean tool -SMED and Inventory reduction. Implementation of Pull System from production to assembly to reduce inventory by 15% Star Performer of the plant for the Consecutive months, rated No.1 based on SQPCD performance Manpower saved up to 10% by NVA elimination Achieved breakthrough - Aim 450 ASPH in Robot Press Line as a Project Leader Show less

Malar Manufacturing Services Pte Ltd
Sept 2015 - nowSenior Manufacturing EngineerKey Responsibilities Ownership for the day-to-day activities in the manufacturing process and is responsible for providing direct supervision of people, functions, and processes, as well as general manufacturing floor control. Continuous Improvement Projects across the unit using Lean tools. Development and implementation of overall manufacturing metrics for the company. Improve manufacturing overall effectiveness through machine efficiency, team empowerment, cost reductions and schedule improvements. Provide technical direction to manufacturing teams in the resolution and prevention of defects and streamlining of new processes. Driving a culture of change and ensuring that continuous improvement is promoted throughout the manufacturing teams.Chief Accomplishments Cost saving of about SGD $36000/annum by Continuous Improvement in the manufacturing process. Improved the Production efficiency by 15% through NVA elimination. Show less
Licenses & Certifications

Project Management Training course
Project Management InstituteMay 2015
STOP Safety Trainer By "DuPont"
DuPontMar 2014
Languages
- enEnglish
- taTamil
Recommendations

Diana sierra
Ingeniero Mantenimiento MecánicoVenezuela
Raghu bc, pmp, csm, itil
PMI® PMP | CSM | Senior Manager | Ms Azure | Business Strategy, Delivery & Ops | Process Automation ...Bengaluru, Karnataka, India
Amanda gréggio
Economista, Especialista em Finanças e Analista de CustosSorocaba, São Paulo, Brazil
Nestor curto
Director de Oficina en Nationale-NederlandenAlcalá de Henares, Community of Madrid, Spain
Anara yurgina
Head of legal department yclients.comМосква, Москва, Россия
Enes tiryaki
Uzakyol 1. Zabit | Oceangoing Chief Officer (STCW II/2)Istanbul, Istanbul, Türkiye
Emese balogh
Research Funding Manager at Anglia Ruskin UniversityGreater Cambridge Area
Amanda fung
Senior Digital Project ManagerStockholm, Stockholm County, Sweden
Syed aejazullah parvez
Student at Muffakham Jah College Of Engineering And TechnologyHyderabad, Telangana, India
Lucia caragiov
Business Intelligence student at Aarhus BSSGreater Aarhus Area
Isabel rosario-montalvo
--Puerto Rico
Vadzim katsuba
Java Software EngineerWrocław, Dolnośląskie, Poland
Rounaq haidar
Tourism Professional | Domestic Operations Executive at WanderOn | Photographer & Videographer | Eve...New Delhi, Delhi, India
Nayan birua
IIM Udaipur'25 | Student Representative at Partner Relations Committee | Finofy Technologies Pvt Ltd...Udaipur, Rajasthan, India
Kyle a. neeld, cpa, cgma
Managing Director at The Mercadien Group & Principal at Mercadien, P.C., Certified Public Accountant...Trenton, New Jersey, United States
Sabi ur rehman khan
MBA in Marketing '22 | B.Tech. in EEDelhi, India
Abu muhammad kamruzzaman
Chief EngineerDhaka, Bangladesh
George atef , pmp®
Civil Construction ManagerAlexandria, Egypt
Oluchi henry-ucheonwu
Business Analyst | Scrum Master | ISC2 CC | Master of Information Security & Privacy, UofC | Master ...Canada
Horst-peter kaumanns
Senior Sales Manager DACH and Eastern Europe bei Skullcandy International GmbHBedburg, North Rhine-Westphalia, Germany
...