Suwit Khongkla

Suwit Khongkla

Followers of Suwit Khongkla36 followers
location of Suwit KhongklaBangkok, Bangkok City, Thailand

Connect with Suwit Khongkla to Send Message

Connect

Connect with Suwit Khongkla to Send Message

Connect
  • Timeline

  • About me

    Master degree ที่ สถาบันเทคโนโลยีไทย-ญี่ปุ่น

  • Education

    • Rajamangala University of Technology

      2002 - 2006
      Bachelor of Engineering Textile Chemistry Engineering 3.12
    • สถาบันเทคโนโลยีไทย-ญี่ปุ่น

      2015 - 2018
      Master degree Engineering Technology 3.44

      The Master program in Engineering Technology (MET) could serve a wide range of highly-qualified students who aequires greater expertise to advance their careers. The MET program is designed to be responsive to career and professional interests, as well as research topic obtained from industries.

  • Experience

    • Teijin Polyester Thailand Ltd.

      May 2006 - Dec 2012

      Teijin polyester Co., Ltd. (Polyester Chip and yarn) May 2006 – Dec. 2012 Address : 1/1 Moo 3, Tambon Klong Nueng, Amphur Klong Luang, Pathumthani 12120Position: Production senior supervisor June2011-Dec2012Position: Technical development senior supervisor June2007-June2011Position: Production supervisor May2006-May2007 In the position of supervisor my experience can divide as the below Production senior supervisor (June 2011 – Dec 2012)- Control attendance of staff 150 persons.- Production management and control all process (Drying, Melting, Spinning, Draw twisting, Quality testing, Inspection and packing, Production Technical)- Daily meeting and supervise to all supervisor in department.- Follow up production performance and take action.- Quality Monitoring and approve testing result.- Make the decision to separate the color and lot for Carseat product (Toyota Pruis).- Monitor production plan for effectively (Capacity, productivity and quality).- Co-operate with maintenance to set schedule OH M/C.- Co-operate with Technical Department to trial and produce new product.Project achieve: 1. Project Core yarn (Decrease yarn broken) Show less Technical development senior supervisor (R&D Dept.) (June 2007 – June 2011)- Work with project team, both internal & external department and co-operate with Japanese team to transfer new product from Japan to Thailand.- Design condition (Drying, Melting, Spinning, Draw twisting, Packaging), schedule, conduct product testing to ensure product performance and implement product into production scale. - Create and control the related R&D projects documents (Evaluation report, Machine, Methods, Performances, Safety, Investment and Specification).- Support production & sale for the existing product by analyze product and trial samples (Data verification, Analysis and Action plan setting).- Monthly meeting and Update result of new product trial to Factory Manager and Japanese Director.-Advice for QA Dept. to analyst abnormal product and provide the information to support customer complaint.Project achieve: 1. Project transfer new brands from Japan to Thailand.2. Project Car-seat (TOYOTA PRIUS) Brand SD130-84SMK.3. New Brand trial and transfer to running in production (3-4 Brands/year).Production supervisor (May 2006 – May 2007)- Training basic in polymer and filament yarn process for 3 month.- Training 3- shift supervisor. - QA supervisor Show less

      • Production senior supervisor

        Jun 2011 - Dec 2012
      • Production senior supervisor & Technical development supervisor

        May 2006 - Dec 2012
    • PPG COATINGS

      Jan 2013 - Jul 2015
      Production Foreman

      PPG Coatings Thailand Co., Ltd (Auto motive Paint) Jan 2013 –Jul 2015Address : 423 Moo17 Bangna-Trad Rd., Km.23 Amphur Bangsaothong, Samutprakarn 10540 Position: Production Forman Jan2013-Jul 2015 Position: Production planner Apr 2015- Jul 2015In the position my experience can divide as the below Production Foreman (Jan2013-Jul 2015) - Production Control including master scheduling (Prepare RM, Mixing, Filtration).- Attendance Control (Operator 25 person).- Coaching work to the operator.- Daily meeting with other department (Planer, Production, QC and Technical-Department).- Improvement process in line production by implement lean system, 5S and big cleaning.- Ensure of WI for all equipment are in place.- MRO Control, (Kanban)Production Planner (Temporary) (Apr 2015- Jul 2015) - Review daily forecast and prepare for production plan. - Prepare documents regarding production control process. - Review and confirm to Purchasing-Department to Issue PO of RM and PFG- Daily meeting (Production, Planner, Technic, QC and CSR) to ensure production result is meet to production planning and actual customer order.- Daily run report from Cognos program and reviews onhands, Back order and etc. Project achieve: 1. Team start up and run production New OEM plant. 2. Prevent human error from detail in Label mistake by installed news program. 3. Implement 5S Activity. Show less

    • Textech (Thailand)Co,.Ltd

      Feb 2016 - now
      WET-FINISHING Supervisor

      Textech Industries (Thailand) Co., Ltd (Cloths for tennis balls) Feb 2016 –PresentAddress : 89 Moo 2, Banmai, Sampran, Nakhon Pathom 73110Position : Production Supervisor In the position of Wet-Finishing Supervisor my experience can divide as the below Production Supervisor - Managing all staff (45 persons) in Wet-Finishing department.- Monitoring production process to ensure the product meets the requirement.- Technical advice for napping technique and supervise the issue for overall process in production to leaders shift. - Set up the new system and find tools to reduce manufacturing human error. - Manage Inventory all chemical and MRO by review and confirm purchasing to issue PO.- Provide daily report and meeting as required. - Manage the resource requirement, interview new staff to hiring work with wet-finishing department.- Liaising with different departments, HR, quality, warehouse & logistics and maintenance to ensure the production are effective, including suppliers to improve the quality and find new technic apply in production.Project achieve: 1. Set up Fulling system install timer to prevent human error. 2. Increase production 20% in 2016 and Increase production 20% in 2017. Show less

  • Licenses & Certifications

    • Engineering