Ibrahim Awwad

Ibrahim Awwad

Intern

Followers of Ibrahim Awwad3000 followers
location of Ibrahim Awwadالشرقية الزقازيق مصر

Connect with Ibrahim Awwad to Send Message

Connect

Connect with Ibrahim Awwad to Send Message

Connect
  • Timeline

  • About me

    MRP & Production Planning Engineer

  • Education

    • جامعة الزقازيق

      2014 - 2019
      Senior Mechanical Engineering

      Design and production Engineering the department have a lot science like non-traditional machining, CNC, Molding, machine design element at the end of our education we can able to 1- Design any machine with easiest way 2- treat with any design problem 3- mold design4- work on CNC and all non-traditional machining 5- heat treatment 6- project manage

  • Experience

    • Hadath GIE.

      Jul 2017 - Nov 2017
      Intern
    • Hatath GIE

      Aug 2017 - Oct 2018
      Project Coordinator intern

      Project Coordinator assigned to Robotics projects Minesweepers: International competitions for landminesARAB ROV: MENA Region Competition for Robotics submarinesRole:- - Teams - volunteers - Vips Coordination- Offline marketing - Logistics (Setup-Execution) Coordination- Universities communication

    • KORTOBA

      Mar 2019 - Dec 2019
      Production Engineering Intern

      Manufacturing Engineer for Metal and Engineering Industry My Role:-1-Design Bricks' mold, Metal construction, Spare parts 2- Machine Design 3- Follow up & Quality for manufacturing Process 4-Machine maintenance (Concrete bricks Machine)

    • PET for packaging materials

      Aug 2021 - Dec 2022
      Planning Engineer

      • Determining the required materials and generating purchase requisitions.• Ensuring the consistent and sufficient supply of materials necessary for production.• Coordinating with other departments regarding production goals, timelines, etc.• Plan, develop, implement and evaluate processes for material delivery from supplier to point of fit.• Day-to-day order management and management of deliveries.• Understand and manage risks to minimize impact on production schedule• Take follow up actions in relation to material shortages that affect production.• Utilize any Material Requirements Planning system (MRP) or IT system that is in place and ensure that data is accurate and up to date and resolve any issues as required.• Monitor the integrity of Bill of Materials (BOM) and manage inventory accuracy.• Monitor inventory levels against agreed target levels.• Support inventory checks to validate inventory accuracy.• Create regular statistical reports and analysis and update others in the organization. عرض أقل

    • Arma Soap and Detergents

      Dec 2022 - Jan 2024
      Supply Chain Planner - International Market
    • السويدي اليكتريك

      Jan 2024 - now
      Centeral MRP Engineer
  • Licenses & Certifications

  • Volunteer Experience

    • Technical Team Lead

      Issued by Asme on Oct 2014
      AsmeAssociated with Ibrahim Awwad
    • Member of Technical Staff

      Issued by ZUFS Racing Team on Jan 2016
      ZUFS Racing TeamAssociated with Ibrahim Awwad
    • Chairman Student Branch

      Issued by IEEE on Oct 2016
      IEEEAssociated with Ibrahim Awwad
    • Chairman

      Issued by IEEE RAS Zagazig Student Chapter on Aug 2016
      IEEE RAS Zagazig Student ChapterAssociated with Ibrahim Awwad