Bradley Becker

Bradley Becker

Dockhand/maintenance/cashier

Followers of Bradley Becker861 followers
location of Bradley BeckerHouston, Texas, United States

Connect with Bradley Becker to Send Message

Connect

Connect with Bradley Becker to Send Message

Connect
  • Timeline

  • About me

    Project Engineer II at Subsea 7

  • Education

    • Texas A&M University

      2014 - 2018
      Bachelor's degree Ocean Engineering

      Activities and Societies: - Texas A&M Human Powered Submarine Team - Marine Technology Society - Society of Naval Architects and Marine Engineers - Society of Petroleum Engineers - Phi Gamma Delta Fraternity - The Big Event - Texas A&M Ducks Unlimited Chapter

  • Experience

    • Key Allegro Marina

      Dec 2012 - Aug 2014
      Dockhand/maintenance/cashier

      - Inventoried, stocked, and sold items in the marina store- performed regular maintenance to docks and boat lifts in the marina as well as making sure facilities are clean and safe- assisted with filling customers boats with fuel and making sure they are happy- interfaced with customers to fulfill their needs or fix their problems

    • Beecroft Construction

      May 2015 - Aug 2015
      Intern/laborer/Drone Pilot

      • Performed maintenance and construction work of an administration building for an $800 million Austrian steel plant • Maintained a clean and safe work area of 14,000 square feet• Piloted a helicopter drone to track progress of projects

    • Flo Trend

      May 2016 - Aug 2016
      Intern/fabricator/welder

      - Constructed custom steel dewatering boxes using a MIG welder for customers in the municipal, industrial, and oil and gas sectors.- Assisted with shipping, receiving, and organizing materials and products

    • Offshore Technology Research Center

      Dec 2016 - Dec 2018
      Student Technician II

      • Conduct technical dives for underwater configuration of model-scale offshore drilling and production facilities• Perform calculations for model ballasting, dynamic global response and mass moment of inertia data prior to model testing as well as for mooring line, riser, flow line and umbilical spring tensioning calibrations• Directly work with industry clients of diverse discipline and expertise, maintaining project scope• Fabricate scale components for offshore platforms using heavy metalworking and welding machinery• Maintain a 2.5-million-gallon wave tank and hydraulic wave generator system Show less

    • MYR Group

      May 2017 - Aug 2017
      Project Engineer Intern

      - Assisted project managers with Primavera P6 scheduling, estimating, project tracker units for subcontractors, labor log unit counts, and plan of the days amongst other tasks- Contracted by Cross Texas Transmission and Garland Power & Light to construct approximately 70 miles of new 345 kV, double-circuit transmission lines from Limestone to Gibbons Creek. This project brings more power to the Houston area to support the expansion of economic growth throughout Southeast Texas.

    • Subsea7

      Jan 2019 - now

      bp Mad Dog Phase II• Provided onshore engineering support (procedural development/updating and 3rd party contractor/supplier management) prior to serving as site engineer at Kiewit Offshore Services that oversaw the timely receival, installation, and integration of the ACE riser pull-in kit and tow/mooring aids onboard the Argos FPU• Provided onshore engineering support (procedural development/updating and 3rd party contractor/supplier management) prior to serving as night lead engineer onboard the Argos FPU that oversaw towing operations and the installation of 12x mooring lines, LWSCR rigid risers, flexible risers, umbilicals, and diving spool piece installation. In addition, supported pre-commissioning topside hydrotesting of newly installed risers and testing of newly installed umbilicals. Included management of multiple subcontractors (ACE, InterMoor, Enermech) Show less bp Mad Dog Phase II• Project engineer onboard LCV Trip 3 that covered the install of jumpers (including back seal testing), UTA mudmats, GLDU, SDUs, SDU mudmats, concrete mattresses, and flooding/flushing of flowlines (3rd party vessel – Harvey Intervention)• Procedural development, management of support functions (structural and analysis engineering and SCM/3rd party contractors), as well as offshore execution of HCV campaignthat installed 12x mooring piles and 4x production manifolds and oversaw barge operations(3rd party vessel - Island Venture)• Seven Oceans LWSCR installation campaign Project Engineer (only the second LWSCR system installed by Subsea 7) – included onshore procedural updating in preparation to offshore execution Show less bp Mad Dog Phase 2- Develop and generate high level installation procedures for structures ranging from suction piles to manifolds- Interfaced with client, alliance, and sub-contractors on a regular basis to maintain open and clear communications to ensure procedure meets everyone's requirements- Interfaced with SCM and logistics to ensure proper equipment to carry out scope of work offshore has been ordered and delivered to mobilization site- Design installation lift rigging using MathCAD- Work closely with structural and analysis engineers to develop transportation and installation parameters Show less

      • Project Engineer II

        Jan 2023 - now
      • Project Engineer II

        Jul 2022 - Jan 2023
      • Project Engineer I

        Dec 2020 - Jul 2022
      • Production Engineer (secondment)

        Sept 2020 - Dec 2020
      • Project Engineer I

        Jul 2020 - Sept 2020
      • Graduate Engineer

        Jan 2019 - Jul 2020
  • Licenses & Certifications

    • TWIC Card

    • Open Water Scuba Diver

      PADI
      Aug 2016
    • Enriched Air Diver

      PADI
      Jan 2017
    • OSHA 10-Hour Construction

      ClickSafety
      Jun 2017
    • Basic Offshore Safety Induction and Emergency Training

      ERGT Australia - RTO 2534
      Oct 2023
  • Honors & Awards

    • Awarded to Bradley Becker
      Eagle Scout The Boy Scouts of America Nov 2011 Only four percent of Boy Scouts are granted this rank after a lengthy review process. For my Eagle Scout project I chose to build a 20 foot bridge over a creek. The project took a total of 667 hours to complete.
  • Volunteer Experience

    • Volunteer

      Issued by John Uhr Memorial Billfish Tournament on Jul 2012
      John Uhr Memorial Billfish TournamentAssociated with Bradley Becker
    • Staff Assistant

      Issued by The Big Event at Texas A&M University on Mar 2015
      The Big Event at Texas A&M UniversityAssociated with Bradley Becker