Sharib Razi

Sharib Razi

Asst Chief Design Engineer

Followers of Sharib Razi4000 followers
location of Sharib RaziGurgaon, Haryana, India

Connect with Sharib Razi to Send Message

Connect

Connect with Sharib Razi to Send Message

Connect
  • Timeline

  • About me

    Vice President @ Amplus Solar | Power Engineer | Renewable Energy Expert | Project Management Professional

  • Education

    • St Joseph's School

      1980 - 1989
    • Kendriya Vidyalaya

      1989 - 1994
      XII AISSCE Science
    • Gulbarga University

      1995 - 1999
      Bachelor Of Engineering Electronics and Communication
  • Experience

    • NTPC Limited

      Oct 1999 - Sept 2007
      Asst Chief Design Engineer

      Basic and detailed engineering of automation systems.

    • LANCO Infratech Limited

      Oct 2007 - Sept 2009
      Manager C&I Engineering and Design

      Engineering Procurement and Construction activities of power plant . Speciality in Control systems and automation.

    • Mott MacDonald

      Sept 2009 - Apr 2010
      Senior C&I Engineer

      Basic and Detailed engineering of C&I systems of a thermal power plant.Feasibility Studies of power projects.Due dilligence and techno commercial evaluation of power projects.

    • L&T Power

      Apr 2010 - Aug 2011
      Manager Project Execution and Monitoring

      Execution and monitoring of a 1400 MW coal fired thermal power plant based on super critical technology.

    • LANCO Solar Energy Private Limited

      Sept 2011 - Apr 2013
      Asst General Manager (Engineering)

      Responsibilities: • Collaborate with Business Development and Finance teams to create project plans for Open access and On-site Captive renewable energy plants.• Create engineering plans and manage engineering activities for Solar Photo Voltaic power projects, Wind Farms and Wind-Solar Hybrid projects to ensure on-time completion.• Forecast staff requirements in line with project schedules to ensure the necessary resources are available.• Conduct pre-feasibility and technical due diligence for new projects to determine the project's viability.• Prepare the departmental budget and present it to board for approval to confirm it is aligned with the organization's goals.Projects:  75MWp: Project N.E.O. with 132kV Transmission Line for power evacuation under Open Access 48MWp: Project Matahari with 132kV Transmission Line for power evacuation under Open Access 12 MWp: Project Tadipatri: On-site captive Solar P.V. plant at Ultra Tech cement Andhra Pradesh 56 MWp: On-site captive Solar P.V. plant at 7 locations across Madhya Pradesh and Rajasthan 56.5 MW Solar PV Plant with 132kV Transmission Line in Uttar Pradesh Show less

    • Black & Veatch

      May 2013 - Jul 2016
      Lead Control Engineer

      Responsibilities: • Worked with the proposal team to review customer requirements, identified the engineering requirements, and created a proposal that meets the customer's needs.• Managed engineering activities to ensure it gets completed on time, within budget, and met quality standards.• Conducted design reviews to ensure it met the requirements and specifications of the project.• Analyzed project progress, created a catch-up plan and managed team personnel to ensure the team had the necessary skills to complete the project.Projects:  2x660 M.W. Coal Fired Power Plant - Client: Confidential, Indonesia - Role: Proposal Engineering Manager. 490 MW C.H.P. Plant at Kazan Russia - Client: GAMA Power Systems Turkey - Role: Proposal Engineering Manager. 4x1 S.C. to CC Conversion PP9 KSA - Client: Saudi Electric Company - Role: Proposal Engineering Manager. 490 MW C.H.P. Plant (G.E. Frame 9H Gas Turbine) Kazan Russia - Client: GAMA Power Systems Turkey - Role: Project Engineering Manager. 495 MW CC Power Plant in Oklahoma, U.S.A. - Client: Mitsubishi-Hitachi Power Systems - Role: Owner's Engineer. Thermasouth 2x150 MW CFBC Power Plant - Client: Aboitiz Power Philippines - Role: Lead Engineering QC, Engineering Deliverables. Show less

    • Doosan Power Systems

      Aug 2016 - May 2020
      Deputy General Manager

      Responsibilities: • Set up the Engineering Deliverable list with a schedule to align with the project timeline.• Recommended optimization solutions for Electrical and I&C of Boiler, F.G.D., S.C.R., A.H.P., E.S.P. and M.R.S. to confirm that the systems operate efficiently.• Served as the primary point of contact between the executive team and the customer, providing updates on project progress and addressing their concerns.• Reported the project's progress and created monthly progress reports to check on the status and identify possible issues.• Estimated the costs associated with the project and identified cash flow requirementsProjects:  3x800 MW Kudgi STPP (S.G.P.) - Client: NTPC Ltd - Project Value ~500 Mn USD 2x800 MW LARA STPP (S.G.P.) - Client: NTPC Ltd - Project Value ~350 Mn USD 1x660 MW Harduaganj T.P.P. (S.G.P. with F.G.D. and S.C.R.) - Client: UPRVUNL - Project Value ~200 Mn USD 2x660 MW Obra-C T.P.P. (Turnkey E.P.C. including Boiler, Turbine, AQCS-FGD, S.C.R., E.S.P., M.R.S., and A.H.P.) - Client: UPRVUNL - Project Value ~1 Bn USD 2x660 MW Jawaharpur T.P.P. (Turnkey E.P.C. including Boiler, Turbine, AQCS-FGD, S.C.R., E.S.P., M.R.S., and A.H.P.) - Client: JVUNL - Project Value ~1 Bn USD Show less

    • Amplus Solar

      May 2020 - now
      Vice President Ground Mount Engineering

      Responsibilities: • Create engineering plans and manage engineering activities for Solar Photo Voltaic power projects, Wind Farms and Wind-Solar Hybrid projects to ensure on-time completion.• Forecast staff requirements in line with project schedules to ensure the necessary resources are available.• Conduct pre-feasibility and technical due diligence for new projects to determine the project's viability.• Prepare departmental budget and present it to the board for approval to confirm it is aligned with the organization's goals.• Review, validate and approve RFQs, proposal design basis and BOQ.Projects: -75MWp: Project N.E.O. with 132kV Transmission Line for power evacuation under Open Access-48MWp: Project Matahari with 132kV Transmission Line for power evacuation under Open Access-12 MWp: Project Tadipatri: On-site captive Solar P.V. plant at Ultra Tech cement Andhra Pradesh-56 MWp: On-site captive Solar P.V. plant at 7 locations across Madhya Pradesh and Rajasthan-56.5 MW Solar PV Plant with 132kV Transmission Line in Uttar Pradesh Show less

  • Licenses & Certifications

    • IPMA-D.

      Project Management Certification Institute
      May 2011
      View certificate certificate
    • Strategic Management

      UCLA Extension