Monwar Ali

Monwar Ali

Chief Engineer

Followers of Monwar Ali131 followers
location of Monwar AliUnited States

Connect with Monwar Ali to Send Message

Connect

Connect with Monwar Ali to Send Message

Connect
  • Timeline

  • About me

    Team Leader & Water Supply Engineer

  • Education

    • Asian Institute of Technology

      2000 - 2000
      Post Graduation Diploma Water & Waste water Engineering

      Studied and successfully completed Water & Wastewater Engineering Course

    • Bangladesh University of Engineering and Technology

      1975 - 1979
      Bachelor’s Degree Civil Engineering 2nd Class

      Studied and Completed Graduation in Civil Engineering

  • Experience

    • Department of Public Health Engineering, Bangladesh

      Apr 2015 - May 2015
      Chief Engineer

      Apr 2015 to May 2015To act as administrative head and is responsible for overall administration of the Department and to act as an adviser to the administrative Ministry on technical matters and on the formulation of policies concerning the Department.

    • World Health Organization

      Aug 2016 - Apr 2017
      Facilitator & Peer Reviewer

      Prepared the UN-Water Global Analysis and Assessment of Sanitation and Drinking-Water (GLAAS) country survey report for the cycle 2016/17 under WHO, Dhaka, Bangladesh

    • Asian Development Bank (ADB)

      May 2017 - Dec 2017
      Civil Engineer in Waterworks & Irrigation

      Promoting and Scaling Up Solar Photovoltaic Power through Knowledge Management and Pilot Testing in Bangladesh and Nepal. Responsible for undertaking and delivering the following outputs:• Support the international consultants in carrying out related civil-hydraulic projections, Preparing required reports and documentation and supervising;• Provide support for the training of women from HHW and BPL to formulate SPV based livelihood plans.• Attended the Team Meeting, Inter-ministerial meeting, Implementing agency organised meeting, • Consult with the team member on civil works and revised accordingly, • Prepared the documents related to Civil works, • Visited the Proposed sites, Prepared of questionnaire, • Attended Stakeholders conference workshop and Reviewed the Draft FS. Show less

    • Institute of Water Modelling

      Jul 2018 - May 2019
      Team Leader & Water Supply Specialist

      Deliver the following study reports for the 30 Pourashavas around the country under World Bank assisted Technical Assistance (TA) for Detailed Design, Development of Service Option & Modality and Preparation of Detailed Project Report (DPR) of Water Supply scheme to implement in Thirty Towns of Bangladesh. • Feasibility study and report preparation, detail project report including engineering drawings and bid documents of 10 Municipal towns and updating 20 Pourashavas on water supply system.• Confirmation of identified water sources, carrying out engineering, hydrological & hydrogeological, geotechnical and socio economic survey;• Updated population and water demand projection; • Establishment of design criteria (hydraulic, structural, electro-mechanical);• Water supply system configuration and sizing;• Detailed engineering design of Production Tubewell (PTW), Pump House, Overhead Tank (OHT), Water Treatment Plant and Transmission & Distribution pipe network etc.;• Operation and maintenance plan meeting water safety requirements;• Economic and financial analysis;• Detailed implementation plan Show less

    • World Health Organization

      Aug 2018 - Dec 2018
      Facilitator & Peer Reviewer

      Prepared the UN-Water Global Analysis and Assessment of Sanitation and Drinking-Water (GLAAS) country survey report, Bangladesh for the cycle 2018-19 under WHO, Dhaka, Bangladesh.

    • Institute of Water Modelling (IWM)

      Oct 2019 - Sept 2022
      Team Leader & Water Supply Engineer

      Deliver the following infrastructures for the Rohingya people in Ukhiya & Teknaf Upazila, Cox’s Bazar under World Bank Assisted Emergency Multi Sector Rohingya Crisis Response Project (EMCRP), DPHE• Mini piped water schemes, Point water options,, Composting bio-gas plants, Integrated waste management system (fecal sludge and solid waste), Household and bio-fill toilets, Mobile water treatment plant and Water Supply scheme design & implementation for Teknaf Municipality.• Validate the design of water and sanitation services;• Supervision of WSS construction works;• Management support, quality control and payment certification.• Training for field DPHE staff in capacity development;• Develop and Supervision of ESMF;• Feasibility Study and Detail Design for the surface water based piped water supply scheme for Teknaf Pourashava. Show less

    • DevCon-IWM Jv

      Mar 2023 - now
      Team Leader

      The objectives of this consultancy assignment are: • Identify the water-scarce area of a coastal community of Bangladesh; • Assessing the Domestic Water Demand of the Coastal Community.• Identify the specific constraints of drinking water supply in the coastal area. • Identify & sustainable sources of water supply to meet the future demand and provide safe water from those sources. • Test effectiveness of the existing technological options and modify design of existing options. • Construct (testing) of different Types of Water Supply Options for feasibility & sustainability of technological options. • Identify suitable water treatment option based on the source water quality with special focus on piped water supply. • Determine Climate resilient infrastructure development to treat and distribute water from the sources by using improved/ modified water technology. • Assess social and environmental impact of the development works. • Outline design for water supply options and cost estimation analyze with financial and economic feasibility of the options Show less

  • Licenses & Certifications

    • Water & Wastewater Engineering

      AIT, Bangkok
      Jan 2000