Thomas Jaffray CEng MICE

Thomas Jaffray CEng MICE

Catering Assistant

Followers of Thomas Jaffray CEng MICE516 followers
location of Thomas Jaffray CEng MICELondon Area, United Kingdom

Connect with Thomas Jaffray CEng MICE to Send Message

Connect

Connect with Thomas Jaffray CEng MICE to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at Laing O’Rourke

  • Education

    • Loughborough University

      2013 - 2018
      Master of Engineering - MEng Civil Engineering 1st Class
    • Loughborough University

      2013 - 2018
      Master's Degree Civil Engineering

      Activities and Societies: IMS Rugby Team, RAG raids I have written a report on the effects of admixtures in concretes.

  • Experience

    • Thomas Franks Ltd

      Jun 2011 - Oct 2018
      Catering Assistant
    • Walter Lilly

      Jun 2013 - Jun 2013
      Work Placement

      I had a week work placement with Walter Lilly on a new build on the Wentworth estate. This was unpaid work experience. My responsibilities included looking at the buildings drawings and calculating placements of walls onsite that were to be erected, I then had to liaise with the foreman onsite to tell him where the walls were to be placed. I was also involved in organising deliveries onsite, and collecting the relevant paperwork to ensure it was all in order so that it could be filed and money could be claimed. Show less

    • Loughborough University

      Sept 2013 - Jul 2018
      Student
    • VolkerFitzpatrick Ltd

      Jul 2015 - Jul 2016
      Industrial Placement Engineer

      Completed my year in industry with VolkerFitzpatrick Ltd in portsmouth on a new road construction project. The project involved construction of a link road to service a future development park from J3 of the A3(M) to an existing roundabout at Woolston road in Havant. This involved construction of a new roundabout and lay-by area for HGV's as part of S278 works. We also installed all new storm and foul water drainage systems, constructed a new bridge over the Hermitage stream and a local stream diversion, removing the existing reinforced concrete wall. I had varied involvement in this project, from working alongside the earthworks contractor completing daily cut/fill volume calculations to assist with commercial claims each month, to being the engineer solely involved with installing the drainage up to completion. I was also in charge of the tarmac operations, setting out block-ups checking works and completing dip sheets on each layer surface. Other involvement I have had has been with kerbing and construction of the road box for the carriageway and the footpaths. Setting out for position and levels of kerbs footpaths and the road box; also checking these works. I have also had involvement in reinforced concrete works, constructing a reinforced concrete protection slab over a High pressure gas main that rain through the site, and the construction of a flood defence wall at the stream and construction of the stream walls. As the project drew to a close I was the sole engineer on-site looking after all engineering operations that were still happening on-site, also I had a lot of correspondence with the client and the adopting authority completing snag walks regularly getting works signed off. I had a large liaison role with the designer; when issues arise on-site which mean that the design has to be changed I liaise with them to come up with a solution that is acceptable. Show less

    • VolkerFitzpatrick Ltd

      Sept 2018 - Nov 2024

      As a Site Agent at VolkerFitzpatrick, I lead a team of engineers on major infrastructure projects, including Brent Cross West Station and Old Oak Common Station for HS2 in London. I serve as the Contractor’s Responsible Engineer (CRE-C) for civils, ensuring compliance with Network Rail standards. My responsibilities include overseeing construction deliverables, managing temporary works, and maintaining the strictest Health and Safety & Quality standards.I also handle project planning, subcontractor management, and digital systems implementation. My leadership skills and technical expertise play a crucial role in ensuring the successful and timely delivery of projects. Show less

      • Site Agent

        Jun 2023 - Nov 2024
      • Sub Agent

        Nov 2022 - Jun 2023
      • Senior Engineer

        Nov 2021 - Nov 2022
      • Section Engineer

        Sept 2020 - Nov 2021
      • Site Engineer

        Sept 2018 - Nov 2021
    • Laing O'Rourke

      Nov 2024 - now
      Project Engineer

      Project Engineer for Laing O’Rourke working on the Eastern Freeway - Burke to Tram Alliance for Major Roads Victoria on the Buleen interchange structures.

  • Licenses & Certifications

    • Engineering Technician

      Institution of Civil Engineers (ICE)
      Dec 2019
    • Chartered Engineer

      Institution of Civil Engineers (ICE)
      Jan 2024
    • A61 Appointed Person for Lifting Operations

      CPCS NOCN
      May 2023