Darsono ST

Darsono ST

Electrical Supervisor

Followers of Darsono ST720 followers
location of Darsono STSurabaya, East Java, Indonesia

Connect with Darsono ST to Send Message

Connect

Connect with Darsono ST to Send Message

Connect
  • Timeline

  • About me

    Senior Engineer with over 20 years experience in Continuous Improvement saving up to 13 mio USD | Project Manager | Cigarette knowledge | Electrical | FMCG / Cigarette & Paper Manufacturing |

  • Education

    • Institut Teknologi Sepuluh Nopember (ITS)

      1992 - 1998
      Bachelor's degree Faculty of Industrial Technology, Electrical Department, Majoring in Electronics Engineering
  • Experience

    • PT Pabrik Kertas Tjiwi Kimia Tbk

      May 1999 - Jul 2002
      Electrical Supervisor

      • Conducts to scheduling preventive electrical both of motor AC and DC maintenance and identifies the procurement of spare parts required to ensure optimum• Solves electrical of motors problems in order to ensure reliable and timely production services.

    • PT HM Sampoerna Tbk.

      Jul 2002 - Mar 2020

      • Identified some initiatives improvement area both of tobacco processing area (Primary) and cigarette processing (secondary) then proposing alternative processes and equipment to implement. Conducted feasibility study then led and managed project starting from project charter documented (initiate), Business case & budget calculation (Plan), Execute until implementation and successfully deliver saving productivity up to 13.5 mio USD in 2016 then granted ABCD award from management.• Collaborated with cross function, Led process improvement initiatives and development to improve factories performances within South Cluster & Asia Pacific Region in order to meet the set targets of uptime, yield and DIM waste and product quality and deliver saving productivity up to 1.7 mio USD in 2019. • As project manager, supported global initiative to simplify tobacco processing for kretek and white tobacco. Design optimized layout until release 50% space, calculated budget, executed proceed to test and commissioning 2017 – 2018 then granted ABCD award from management. Show less • Managed existing products to ensure consistency of product performance by conducts review smoke KPI of each cigarette & blend prediction under PD South Cluster responsibility and prepare action plan, totally 85 create changes were already completed is below following: o 184 filters and cigarettes have already changed in specification.o 9 cigarettes have already suppressed.o 61 filters and cigarettes have already obsoleted.o 103 new filters and cigarettes have already released.• Implemented Productivity initiative in optimize cigarette construction for slim cigarette & optimize plug warp specification then awarded by ABCD award in 2012. Show less • Led project to provide Pilot Plant infrastructure (machineries, equipment and building facilities).• Identified all technical and control systems modifications needed for Pilot Plant equipment and/or machineries in order to enable the production of modified and/or new blends and cigarette types:o Improve Protos and Lab Max capability in minimum length of cigarette from 74 mm to 67 mm (2008).o Improve Orion flexible ranges of cigarette lengths from only one format of Marlboro FF to 5 formats (2010).o Relay out Pilot Plant Primary Processing straight line project until ready to used and achieved quality requirement (2010).o Delivered training “Cigarette Innovation” in Product Knowledge Training by PD team on 17 - 19 May 2010.• Supported in PMI affiliate (short term assignment):o Installed Pilot Maker - Lab Max cigarette maker machine and deliver related training to operator at PMM Seremban Malaysia as Project Manager (2007). o Provided technical expertise for affiliate company - GPI (GODFREY PHILLIPS, INDIA) to solve Pilot Maker loose end cigarette (2009). Show less • Achieved completion in execution of project for Indonesian market and SI product which conforming to quality, quantity and delivery requirements.• Achieved completion in provision of Magnum Filter Conversion Kit (8.53 mm), Sodim SMI D Diameter Meter for Pilot Maker Diameter Control and Kaymich Online Flavor Application System • Modified Lab Max (pre-heater installation and glue roll modification) • Established Pilot Plant machinery maintenance documented procedures and Preventive maintenance program has been consistently implemented.• Established safety documented procedures have been developed and achieved Zero loss time injuries.• Modified PLC program to improve safety in CLED dryer machine Show less

      • Sr Engineer at Innovation & Productivity Department (Manager Level)

        Jan 2015 - Mar 2020
      • Engineering Primary at Engineering Department

        May 2013 - Dec 2014
      • Cigarette Spec. Maintenance at Product Development Department

        Mar 2012 - Apr 2013
      • Technical Specialist at Pilot Plant Department

        Oct 2007 - Feb 2012
      • Secondary Supervisor at Pilot Plant Department

        Jan 2005 - Sept 2007
      • Electrical Development Engineer at Pilot Plant Department

        Jul 2002 - Jan 2005
    • Educational Institution

      Apr 2020 - now
      Consultant
    • Comas S.p.A.

      Jun 2022 - now
      Sales Engineer
  • Licenses & Certifications

    • LASER 300 S Perforator

      Hauni Maschinenbau GmbH
      Aug 2002
    • Emergency Response Plant

      PT HM Sampoerna Tbk.
      Jul 2004
    • ERGONOMIC & MATERIAL HANDLING

      PT HM Sampoerna Tbk.
      Jan 2007
    • General Safety Inspection

      PT HM Sampoerna Tbk.
      Aug 2004
    • Fire Fighting Training

      PT HM Sampoerna Tbk.
      Aug 2003
    • Incident Reporting & Investigation Workshop

      PT HM Sampoerna Tbk.
      Jul 2004
    • In House Eastman Acetate Tow Characteristic Training

      Voridian International Ltd
      Oct 2003
    • Blue Leader Program

      Philip Morris International
      Oct 2015
    • Basic EHS Training For Manufacturing

      PT HM Sampoerna Tbk.
      Jan 2007
    • Job Safety Analysis

      PT HM Sampoerna Tbk.
      May 2006