Dinesh R

Dinesh R

Site Engineer

Followers of Dinesh R338 followers
location of Dinesh RCoimbatore, Tamil Nadu, India

Connect with Dinesh R to Send Message

Connect

Connect with Dinesh R to Send Message

Connect
  • Timeline

  • About me

    Assistant manager

  • Education

    • Erode Sengunthar Engineering College

      2011 - 2015
      Bachelor's degree Civil Engineering 6.72
  • Experience

    • Lakshmi Constructions - India

      May 2015 - Dec 2016
      Site Engineer

      Commercial and Residential building work – Multiple G+3 with 3600Sqft, Marriage hall with 10500Sqft. • Daily proper maintain all civil checklist, daily and monthly report and documentation work. • Maintain the all necessary records & documentation like drawings sets, updating in drawings, schemes, settings, fault analysis, defect registers etc. • Experience in working with purchasing staff to establish quality requirements from external suppliers. Possesses strong inter-personal and leadership skills with 20 staff. • Assistance in handover work and Punch point clearance work for charging. • Quality checking the materials, reporting defects to management, Billing Preparation as per BOQ. Show less

    • Adani Power

      Jul 2017 - May 2018
      Civil Engineer

      50MW/ 55Mwp Solar Power Plant, Karnataka. Solar power project contains 40 Mw Tracker system, 10Mw Seasonal tilt,110KV switch yard, MCR, Module cleaning system other misc items. • Managing projects from conception, pre-production through to completion. Providing technical support to the project team and wider regional teams. • Providing guidance to junior staff in the areas of leadership, continuous improvement, decision-making and conflict resolution. • Responsible for overseeing the review, initiation and execution of contracts. • Producing Test Plans and reports & Prepare contract documentation for procurement services and materials. Show less

    • Larsen & Toubro

      May 2018 - Dec 2019
      Front line Engineer

      1. Continuum Solar Plant (Coimbatore) is a 55 MW / 65 MWp Solar PV power project, project contains Solar power project contains,10ICR, Pilling and Road work and other misc items. 2.Floating Solar Plant, Tripathi Smart City Corporation is a 4 MW / 6 MWp Solar PV power project, Solar power project contains, MCR, ICR and other misc items. 3. NLC Solar Plant (Manur) is a 180 MW / 110MWp Solar PV power project, in Manur, Tirunelveli, Tamil Nadu. Solar power project contains, MCR, 220KV switch yard, 10 ICR and other misc items. 4. NHPC Solar Plant (Dindugal / Theni) is a 50 MW / 62 MWp Solar PV power project, in Bathalagundu, Dindugal, Tamil Nadu. Solar power project contains, MCR, SCR 110KV switch yard, Tracker system, 19 ICR and other misc items. 5.SBE Solar Plant, (Rajasthan) is a 100 MW / 145MWp Solar PV power project. Solar power project contains, MCR, 18 ICR, Pilling and Road work and other misc items. Show less

    • Tata Power Solar Systems Limited

      Jan 2020 - Nov 2020
      Associate Quality Engineer

      1.Greenko solar project, Madhya Pradesh is a 180 MW / 210MWp Solar PV power project, in Madhya Pradesh. Solar power project contains, 1 no’s 220KV switch yard, MCR, Pilling, Road, 36 ICR and other misc items. • Daily site supervision on all quality aspects of the Civil related works as per applicable FQPs/SOPs/Egg. Drawings /Specification/ Products RTC / Customer requirements etc. • Ensuring proper raw material storage, handling and proper movement from quality point of view. • Maintaining records of all critical/major/minor inputs or punch points received from various sources and their closer evidence. Show less

    • TUV India Pvt. Ltd.

      Nov 2020 - Jun 2023
      Senior Quality Engineer

      Renew Solar Energy (Jharkhand Three) (Jaisalmer) is 300MW/ 420Mwp Solar PV power project, in Jaisalmer Rajasthan. Solar power project contains, MCR, AIS Switch yard, 36 ICR, 1024 Acer pilling, 20KM WBM Road, Boundary wall, Concrete batching Lab and other misc items. • RENEW SUN ENERGY (Eval, Gujarat) Private Limited is a 105MW/ 126MWp Solar PV power project, in Eval, Gujarat. Solar power project contains, MCR, GIS Switchyard, 16 ICR, 450 Acer pilling, 10 KM WBM road, Boundary wall, Concrete batching Plant and other misc items. • Batching Plant In-charge with All testing procedure. • Daily site supervision on all quality aspects of the Civil related works as per applicable FQPs/SOPs/Egg. Drawings /Specification/ Products RTC / Customer requirements etc. • Ensuring proper raw material storage, handling and proper movement from quality point of view. • Maintaining records of all critical/major/minor inputs or punch points received from various sources and their closer evidence. • Conduct Quality awareness training program as per schedule to contractor’s manpower w.r.t. FQP, Application SOPs, checklists, Lesson learnt & Good Construction audit. • Arrange, conduct and witness stage-inspection, pre-dispatch inspection/final inspection with clients/TPI and checks on Quality of Materials as per agreed general arrangements, general technical particulars, quality assurance plan and relevant Indian standard. Show less

    • O2 Power

      Apr 2023 - now
      Assistant Manager
  • Licenses & Certifications

    • Auto Cad

      CADD Centre Training Services Pvt Ltd.
    • Staad Pro

      CADD Centre Training Services Pvt Ltd.
  • Honors & Awards

    • Awarded to Dinesh R
      Best Project - April 1, 2014