Mohamad Zulhairi Mohd Jamel

Mohamad zulhairi mohd jamel

bookmark on deepenrich
location of Mohamad Zulhairi Mohd JamelPasir Gudang, Johore, Malaysia
Followers of Mohamad Zulhairi Mohd Jamel498 followers
  • Timeline

  • About me

    TECHNICAL EXECUTIVE PIPING & VALVE

  • Education

    • Infrastructure university kuala lumpur (iukl)

      2008 - 2011
      Diploma mechanical engineering

      Activities and Societies: President Bowling

    • Smk seafield

      2003 - 2007
      Spm physical sciences

      Activities and Societies: Bowling president

    • Universiti tenaga nasional

      2010 - 2014
      Bachelor's degree mechanical engineering/mechanical technology/technician

      Activities and Societies: 2011 – 2013 Treasurer of Bowling Club, UNITEN • SUKIPT • IPT OPEN • UTHM OPEN • IPT CLOSE • UTHM PIALA NAIK CENSELOR 2011 – 2012 Head of Food and Drink, International Clean River Up, Hulu Yam (UNITEN)

  • Experience

    • Klk oleo

      Jan 2013 - May 2013
      Mechanical engineering

      KL-KEPONG OLEOMAS SDN. BHD. (Klang, SELANGOR) Student Internship from UNITEN Position : Assistance Maintenance Engineer• Responsible in assist engineer in monitoring plant’s functioning system; and preparing maintenance list according to pump number (ex: gasket, valve, seal etc).• Directly involve in plant shutdown activities, by assisting engineer in monitoring the progress and preparing the equipment and parts needed during the activities.• Responsible in assist the engineer while dealing with the suppliers in ordering specific parts needed. Show less

    • Allied calibration engineering services sdn bhd

      Jun 2014 - May 2017
      Mechanical project engineer

      Project Engineer • Responsible for the project executions pertaining to chemical injection skid packages .Liaised with clients, principals and vendors on related projects, products or services. • Responsible for preparing documentation and technical to clients on chemical injection skid packages. • Responsible on IRCD servicing, maintenance and repair works for rotating equipments and mechanical parts including pumps, shafts, seals etc. • Preparing tender for beading process.• Installation the tubing work and responsible on the design with calculation• Consultant for IRCD work n design for injection system.• Swegelok Malaysia certificate no –T-SSIT-1504-handling project Sarawak shell • 4 skid with difference chemical- chemical injection skid gas- chemical injection skid liquid- wax/PPD-DemulsifierGaraff Project (IRAQ)• 15 skid with difference infill 1 and 2- completed send to iraq. - chemical skid injection Show less

    • Ice petroleum

      May 2017 - Aug 2018

      2018 – CURRENT (OUIJV-HIAP SENG- ICE PETROLEUMProject Involvement (TANKAGE)• OUI-JV (HIAP SENG -ICE Petroleum) – Package Contractors for interconnecting TANKAGE (Package 14 – Utilities and Interconnection)• Responsible for the project executions pertaining to site erection, blast & Paint and hydrotest for packages 14 (Rapid Pegerang). Liaised with clients, principals and vendors on related projects, or services. SITE ENGINEER • Conduct and plan the equipment to be used during hydrotest of tanks.• Responsible on preparing and verifying designs on site including installation aluminium dome roof (ADR), Cathodic protection (CP) and electric system of tank.• Liaise with other discipline engineers and other Departments to ensure the correct interfaces are met• Monitor and guide sub-contractors on engineering design (Dimensions, Arrangement, Painting System & Mechanical installation)• Plan the delivery date based on erection schedule to ensure no hiccups on tank erections.• To complete the accessories (handrail, pipe, manhole and bolt & nut) of tank before hang over to PRPC (Petronas) • Plan the utilization of machineries (Cranes, Trucks, Generators & others) to mitigate hiccups & non-value added OPEX. Show less Project IntroductionOUI-JV (Eleco-ICE Petroleum) – Package Contractors for interconnecting (Package 14 – Utilities and Interconnection)Fabrication • Fabrication (Pipe Support & Spool)• Establish required BQ consist of type and quantity for fabrication of pipe supports and the paint system.Lead For Blasting & Painting• Enhance the BQ through painting system input by referring to line lists approved from client.• To make sure the design temperature for the applicability of the painting paint system and to raise SER/Z0A for any issue to client.• control the color code for each spool according to line system.• Evaluate the performance of the sub-contractors by establishing the performance S-Curve and plan the recovery plan to client.• Monitor in and out spool from painting to make sure all the spool to be recorded.• Erection scope piping & pipe support (Piping for slipper 6900-2C and pipe racks 3900-6A, 05 & 07).• Planing the piping erection based on commissioning dates by prioritizing the critical lines.• Monitor and guide the pipe support fabricator sub-contractors on engineering design (Dimensions, Arrangement, Painting System), required materials, cutting plan and revised pipe support standards based on approved drawing.• Monitor the piping orientation, length and required additional joints by studying the variants between actual and ISO drawings. Raise Red Line Mark-Up (Z0A) as needed to ensure there are no deficiencies of required lengths at site.• Liaise with Painting inspector on the paint system.• Planing the utilization of machineries (Cranes, Trucks, Generators & others) to mitigate hiccups during painting process fabrication and erection. Cost Control For Claimingo Compiling all the data for claiming every month for each activity such as NDT,erection and painting( Quantity Monthly progress) Painting,NDT & Erection.o Dealing with IU&I (Petronas) QS manager for approval. Show less

      • Interface Engineer (Tankage)

        Feb 2018 - Aug 2018
      • Project Engineer (Piping)

        May 2017 - Mar 2018
    • Alghanim international general trading & contracting co. wll

      Aug 2018 - Feb 2020
      Mechanical engineer kuwait (pipeline)

      Project Involvement (PIPE LINE) • Pipeline Construction Works of KOC Feed Pipelines to New Refinery Project (NRP) Project no-EF- 1669, contract no 17052456• Al-Zour Refinery Project EPC-Package #04 & Feed pipeline Project for Kuwait Oil Company (KOC)• Responsible for the project executions pertaining to site erection pipeline, civil work, mechanical work (welding) and vendors on related projects, or services. MECHANICAL ENGINEER• Conduct and plan the equipment to be used during hydrotest of pipeline.• PTW Holder for site Construction and lead mechanical.• Responsible on preparing and monitoring site progress on the welding activity and civil activity pipe line.• Liaise with other discipline engineers and other Departments to ensure the correct interfaces are met• Monitor and guide sub-contractors on engineering design (Dimensions, Arrangement excavation & Mechanical installation)• Plan the delivery date based on erection schedule to ensure no hiccups on pipeline erection.• Co-ordination with the material department issue and delivery for site progress• Co-ordination with QC department for welding joint and NDT repair joint.• In-charge for lowering pipeline. Show less

    • Mmhe

      Feb 2020 - now
      Technical executive piping & valve
  • Licenses & Certifications

    • Juretera siswazah

      Lembaga juretera malaysia
      Aug 2015
    • Basic non distructive testing (ut,pt,mt,rt)

      Tnb integrated learning solution sdn bhd
      Aug 2013
    • Ogsp

      Niosh certification sdn bhd (ncsb)
      Apr 2014