Zuko Ruba

Zuko Ruba

Followers of Zuko Ruba822 followers
location of Zuko RubaJohannesburg Metropolitan Area

Connect with Zuko Ruba to Send Message

Connect

Connect with Zuko Ruba to Send Message

Connect
  • Timeline

  • About me

    Grid Specialist at Voltalia

  • Education

    • University of KwaZulu-Natal

      2009 - 2014
      Bachelor's degree Electrical and Electronics Engineering
  • Experience

    • Eskom Holdings SOC Ltd

      Sept 2014 - May 2024

      1. Responsible for short-, medium- and long-term planning of distribution and transmission network.2. Assist in the compilation of the Transmission Development Plans.3. Study and analyse load and generation forecasts.4. Perform power system simulation studies (PSSE & PowerFactory) for grid reliability projects and integration of renewable power plants (RPP) projects; load flow, contingency analysis, fault level analysis, congestion analysis, losses etc and ensure South African Grid code compliance. 5. Conduct internal and external stakeholder engagements for project requirements.6. Compile cost estimate letters, planning reports and presentations.7. Present in various technical review committees.8. Compile user requirement specification.9. Perform project financial evaluation.10. Assist project managers in the compilation of project charters and investment release approval forms.11. Provide technical assistance throughout the project development phases. 12. Perform other functions as requested by Chief Engineer.13. Projects include.a. Integration Grahamstown 400/132 kV 4 x 500 MVA substation for Tx-Dx grid strengthening and integration of IPPs in the Makhanda/Grahamstown area located in the Eastern Cape.b. Poseidon Capacity Assessment: studied and analysed congestion in Tx-Dx networks due to light load - high generation conditions.14. Other project involvement; Poseidon North & South, Hlaziya, Grassridge and Dedisa transformer projects and Gas(ICE) integrations, Gamma – Zanokhanyo - Grassridge 765 kV project and other projects in the Eastern Cape. Show less

      • Grid Planning Engineer

        Dec 2021 - May 2024
      • Network Optimization Engineer

        Apr 2017 - Nov 2021
      • Engineer In Training

        Sept 2014 - Mar 2017
    • Voltalia

      Jun 2024 - now
      Grid Specialist

      1. Identify and evaluate potential Points of Connection to the regional Distribution or Transmission system where there could be available capacity to connect solar, wind, hydro or storage projects;2. Establish and maintain contacts with Grid Operator and Governmental Agencies related to the gridconnections process;3. Manage interconnection process with Grid Operator and relevant authorities;4. Advise the broader development team and providing technical assistance throughout the life cycle ofprojects;5. Use knowledge of the local legislation and regulations in terms of authorizations and permits, in order to produce guidelines and tools for planning, organizing, executing and controlling the related projectactivities;6. Analyze the local Grid Code, National Grid Statements and additional information on the aspects thatimpact overall location strategy for new development projects. Relay the current and evolving connection environment into Power Plant design and Interconnection Infrastructure;7. Analyze and evaluate Grid Connection Offers and technical information for specific projects that impactthe Grid Connection Design of the project;8. Coordinate the grid connection application, feasibility review and acceptance process with theDevelopment team;9. Be familiar and be able to calculate the relevant values relating to single line diagrams of an ElectricalNetwork on the network and customer side;Evaluate Grid Impact studies in a steady state, dynamic and in transient state of all electrical parameters,performed internally or by third parties;10. Make dynamic models in asynchronous and synchronous wind generators and PV Inverters in simulations to model power flow/stability and frequency response. Show less

  • Licenses & Certifications

    • Grid Connection of Renewable Generation

      DIgSILENT GmbH
      Nov 2024