Badur Karrar

Badur Karrar

Instrumentation & Control Engineer.

Followers of Badur Karrar1000 followers
location of Badur KarrarSaudi Arabia

Connect with Badur Karrar to Send Message

Connect

Connect with Badur Karrar to Send Message

Connect
  • Timeline

  • About me

    Sales & Contracts Manager at Doosan Enerbility

  • Education

    • Sudan University of Science and Technology

      1998 - 2002
      Bachelor of Science (BSc) Electronics Engineering
    • University of Newcastle-upon-Tyne

      2009 - 2010
      Master of Science (MSc) Automation & Control
  • Experience

    • National Electricity Corporation of Sudan

      Nov 2003 - Oct 2010
      Instrumentation & Control Engineer.

      -Garri (II) combined cycle Power Plant (EPC of the project) erection, commissioning and startup function tests of 4 GTs 4 HRSGs 2 STs and BOP-Lead engineer (I&C) Fuel Oil Treatment System (FOTS) in GARRI (I) & (II) Power Plants erection and commissioning (SIMATIC S7 PLC).-leading a team through preventive and corrective maintenance, system troubleshooting, configuration and commissioning. Executing and planning of Major and minor maintenance of turbines and BOP equipments I was reporting to I&C dept head. Show less

    • Sudanese Thermal Power Generating Company Ltd

      Oct 2010 - Oct 2013
      Instrumentation & Control, Department Manager

      Reporting to O&M manager; I was leading a team of four engineers and twelve technicians to carry out I&C activities in these plants.Garri Power Plants Complex where I had worked; consists of three power stations GARRI (I) & (II) are combined cycle plants 4 blocks (8-GTs controlled with SpeedTronic Mark V and Mark VI, 8-HRSGs controlled with FREELANCE 2000 DCS and 4-Seam Turbines controlled with WoodWard 505) with dual fuel: LDO and LPG. While GARRI(IV) is a 2 x CFB (Cyclone Fluidized Bed boiler) controlled with GE OC4000 DCS and fueled with coal. The complex has two river site plants controlled with Simatic S-7 300 for plant (I) and S-7 414 for plant (II). Show less

    • Fichtner Consulting Engineers Ltd

      Oct 2013 - Nov 2017
      Lead Project Engineer.

      Responsible for representing the owner in design review; participated in design review and progress review meetings, was assigned as deputy Contract Manager during the execution phase.  Lead the FAT in addition to supervise the site daily activities for the largest power project in the region a 4x723 MW super critical boiler.  Responsible for Leading the discipline meetings, both during construction and commissioning phases, and accountable for the MOM with the EPC contractor.  Handling details design review and approval.  Was In-charge for conducting FAT, SAT and commissioning of DCS (Yokogawa Centum VP) and SIS (Yokogawa PROSAFE RS) TCS / TPS (DIASYS Netmation) Show less

    • Doosan Heavy Industries & Construction

      Nov 2017 - now
      • Sales & Contracts Manager

        Aug 2020 - now
      • Proposals & Estimation Lead Engineer

        Nov 2017 - Aug 2020
  • Licenses & Certifications