
Jose Manuel Ballesteros Barrón
Temporary Works Design Engineer

Connect with Jose Manuel Ballesteros Barrón to Send Message
Connect
Connect with Jose Manuel Ballesteros Barrón to Send Message
ConnectTimeline
About me
Manager Construction Disputes, Expert Services en Kroll | Executive MBA
Education

ETS ICCP Politécnica de Madrid
-Ingeniero de Caminos, Canales y Puertos
ThePowerMBA
2019 - 2020Programa ThePowerMBABusiness Expert - Gestión y Administración de Empresas

Universidad Politécnica de Madrid
-Ingeniero de Caminos, Canales y Puertos
EAE Business School
2021 - 2023Executive MBA Business Administration and Management, General
Experience

Dragados SA
Jun 2012 - Aug 2012Temporary Works Design Engineer• During my internship I was involved in the temporary works department.• At this stage, the works were getting the quality paperworks done, some small designs with AutoCad, etc.• I work like a Temporary design manager Assistant

Dragados SA
Jul 2013 - Sept 2013Site Engineer Permanent Works (North Side Launch)• During my internship I was involved in the construction of the piers and the launch of the deck of the North Side of the Forth Crossing Bridge.• I was dealing with the client, the Designer and PPP, making inspections, supervising the jobs of the subcontractors, supervising pouring, steel, setting out, also for the section of road in the north access.• I wanted to do something for my career during this summer, and I continued doing internship for it.

Dragados SA
Jun 2014 - Aug 2014Site Engineer South Side Launch Forth Crossing Bridge• During my internship I was involved in the construction of the piers and the launch of the deck of the South Side of the Forth Crossing Bridge in Edinburgh.• I was dealing with the client, the Designer and PPP, making inspections, supervising the jobs of the subcontractors, supervising pouring, steel, setting out, etc.• Also, the quality, the H&S inspections and all the jobs needed to be carried out for the safe and good daily works had to be inspected by myself in my section.• During this time I did the First Aider training Show less

Dragados SA UK & Ireland
Oct 2015 - Feb 2019• I was involved in the Barrow Bridge travellers, being responsible of 2 of the Form Travellers of the centre pier of the bridge, where is the project deadline.• In my duties, are include the daily supervision of the job carried out by the subcontractor (assembly of the Form Traveller (FT), pre-assembly on the ground of the FT, fixing of the steel, formworks, providing of plant and material)• For the daily works, the jobs of the subcontractors need to be planed, and this is one of my responsibilities as well, noting all the jobs carried out by the subcontractor, and the issues had on site for futures claims.• Programme control and achievement of dates and targets, Subcontractor control, Quality and design follow-up.• Ensuring all H&S requirements and rules are followed by all people involved in the works• Assist to the construction manager of the section in all of design, works on site and subcontractor control in all works carried out within the section.• The improvement in the programme was of 3 months, reducing the critical path impact and all the cost related. Show less • During my work in the earthworks department of N25 New Ross bypass I have been involved taking care of the quality documentation (tests, MS, Inspections, etc.), payments to subcontractors, measures, daily supervision, etc.• Ensuring all the section meets H&S requirements, and all staff, subcontractor and labour comply with the H&S project rules and obligations.• Responsible in the area of the relation with the clients, the Council, the principal designers and the PPP.• Chasing of design dates and requirements to the principal designer.• Follow up of design and construction, and monitor all changes and updates.• Follow up of MS updates, Risk Assessments compilation, and quality documentation to comply with design and project requirements.• Enduring all H&S weekly inspections, daily briefings, permits to work, and all H&S documentation needed for the daily works Show less
Senior Engineer Bridge N25 New Ross Bypass
Dec 2017 - Feb 2019Site Engineer Earthworks N25 New Ross Bypass
Oct 2015 - Dec 2017

Dragados SA UK & Ireland
Apr 2019 - Jul 2022• Pre-construction planification and design management, stakeholder coordination, assessing feedbacks and analysing technical requirements from different parties, define delivery strategy within programme and budget.• Managing delivery and design strategy of the new accommodation blocks for all duration of HS2 Euston Station Project, which count with a temporary building of 73m per 24m by 25m height, including substructure.• Delivering of 40no of HIPER® (Hollow Impressed Precast Energy Reusable) Piles (First Time used in the world for building foundation, reducing concrete and reinforcement by 70%, and providing 80% needs for hot water and heating)• Managing all enabling works as utilities, drainage, sewers, etc, for substructure works and future superstructure.• Managing of commercial matters, including close contact with Quantity Surveyors and Commercial Managers for subcontractor, designer, and client.• Managing all subcontractors works on site, working close with construction managers and supervisors. Show less • Managing the delivery strategy of the LU Area, supporting the Senior Project Manager and the LU Lead in the cost assessments, feasibility studies, delivery, and programme.• Definition of delivery strategy within budget and programme• Coordinate different stakeholders (HS2, Network Rail, London Underground, Transport for London, Thames Water, Camden City Council, etc) and agreed technical solutions and requirements within the construction delivery plan• Managing Early Contract Involvement packages for Piling, Reinforced Concrete Works and Early Works for LU Area.• Supporting Master Development Plan, which involve the complete reconfiguration of the London Underground section, inside budget, programme, and buildability. • Baseline Design increased the cost in 50% of the budget and 1 year the programme. Master Plan will potentially make a reduction of 30% and improve the programme 1 year.• Senior Project Manager role since March, due to a long leave, including senior management in LU Area, relation with HS2 (Client), Designer and Stakeholders (London Underground, Network Rail, Camden, etc). Show less • Responsible for providing leadership to the team and for managing and overseeing the day-to-day construction works.• Being the company’s representative with client and designer• In charge of budgeting, organisation, implementation, and scheduling of construction projects for short and long term.• Ensuring that contractual obligations are fully met (NEC 3).• Identifying risks and opportunities involved in all aspects of the project, achieving a reduction in the cost of approximately 50%.• Selecting and assigning staff for specific duties, achieving a better efficiency for the works, which incurred in an improved of 2 months in a year, saving 80.000£/day from direct subcontractor’s claim for being stopped.• 22 Piles needed to be aborted, saving 12 from being replaced with remedial works and technical studies (Approximate cost of 30.000£ per pile).• Diary management of all works in the area of Roadworks and Open Quays, working closely with the project director and managing director of Scotland.• Subcontractor coordination and management• Ensure safety documentation on all scales audited and assessed in accordance with company procedures and all agreed methods worked to.• Act as the liaison with company safety representatives to promote and awareness and understanding of safety protocols, procedures, and initiatives to all the staff.• Supporting management and lawyer team with early warnings, compensation events and all items related to claims of 5-10 million pounds.• Working on disputes against client, subcontractor and designer after the project was terminated (which can reach up to 30million pounds), supporting with all documentation collected and produced during the delivery stage. Show less
Project Manager Maria Fidelis Accommodation in HS2 Euston Station Project
Aug 2021 - Jul 2022Project Manager LU Interchange Substructure HS2 Station Project
Jul 2020 - Aug 2021Construction Project Manager Aberdeen Harbour Expansion Project
Apr 2019 - Jun 2020

Dragados SA
Jul 2022 - Sept 2023Jefe de Ejecución / Project Manager
Kroll
Sept 2023 - nowManager Construction Disputes, Expert Services
Licenses & Certifications
- View certificate

Decision Intelligence
LinkedInNov 2023 - View certificate

ThePowerMBA Program
ThePowerMBAMar 2021 - View certificate

Site Management Safety Training Scheme
CITBJan 2021 
Prevencion de Riesgos Laborales
Fundación Laboral de la ConstrucciónFeb 2022- View certificate

Executive MBA
EAE Business SchoolJan 2023 - View certificate

ThePowerMBA
ThePowerMBAFeb 2021
Languages
- esEspañol
- inIngles
Recommendations

Siu chung andrew fung
海洋公園Discovery and Education ManagerAdelaide, South Australia, Australia
Julie rougeau
Owner, The Law Office of Julie A. RougeauFranklin, Massachusetts, United States
Adriano zucchetti
International Back Office and Sales presso Baldassare Agnelli S.p.A.Greater Bergamo Metropolitan Area
Nicole edmonds
Engagement Lead at Lifetime TrainingSouthend-On-Sea, England, United Kingdom
Cyprian hague
Deployment and Adoption Manager at Northern Territory GovernmentMount Helen, Victoria, Australia
Tuğba kokkoparan
Design ManagerBeşiktaş, Istanbul, Türkiye
Dominik hermle
Zeitlose Präzision seit 1922Reichenbach am Heuberg, Baden-Württemberg, Germany
Oliver weisenburger
Senior Software Engineer at SAPMannheim, Baden-Württemberg, Germany
Akash bhardwaj
Product Manager at AgNext | ECE’20 PECChandigarh, Chandigarh, India
Lauren merritt
Program Coordinator - BC Cancer Screening ProgramsGreater Vancouver Metropolitan Area
Olmo landman
Data Engineering Delivery ManagerThe Hague, South Holland, Netherlands
Istvan maron
QA Manager at BorgWarner DMSHungary
Miguel angel gutierrez deffit
Ejecutivo de cuentas Guía Turístico de aventura, senderos y selvas | Experto universitario en turism...Argentina
James thomason
Procurement Analyst / Commodity LeadUnited States
Kristi barber, mba, lah
Senior Benefits and HRIS AnalystGreenville-Spartanburg-Anderson, South Carolina Area
Adam arnold mciob, mrics
Operations Manager at NAP Anglia LtdUnited Kingdom
Divya sabhapathi
Treasury Back Officer • BASF | MSc FRM @Trinity College Dublin’24 | CPA-FRM @IIM Indore’24 | Ex- EY ...Dublin, County Dublin, Ireland
Dana paciagiu
Event Planning StudentToronto, Ontario, Canada
Boris sarabeev
Site Manager | Focused on delivering best-in-class solutions | Well-being Ambassador | A Triathlete ...Lozenets, Sofia City, Bulgaria
Harshikesh sharma
BUSINESS ANALYST | ORBIT AND SKYLINE PVT LTD | M&M SWARAJ | INTERNATIONAL TRACTORS (SONALIKA)Chandigarh, India
...