Nancy H.

Nancy H.

Manufacturing and Process Engineer

Followers of Nancy H.185 followers
location of Nancy H.León, Guanajuato, Mexico

Connect with Nancy H. to Send Message

Connect

Connect with Nancy H. to Send Message

Connect
  • Timeline

  • About me

    Mechatronic Engineer

  • Education

    • Instituto Tecnológico Superior de Irapuato

      2011 - 2017
      Mecatronic Engineer Control of automotive systems Licenciature

      Activities and Societies: Crafts, painting, running

    • Universidad Tecmilenio

      2018 - 2020
      Master's degree Master of Business Administration in the Area of ​​Quality and Productivity
  • Experience

    • Robert Bosch

      Sept 2017 - Apr 2018
      Manufacturing and Process Engineer

      Manufacturing and Process Engineer - Robert Bosch

    • Robert Bosch GmbH

      Sept 2017 - Apr 2018
      Manufacturing and Process Engineer Intern

      FUEL SYSTEMS SMC IMPLEMENTATION NOV 17-MAR 18• Development and improvement procedures related to Process Technology on industry 4.0 software• Part numbers data including/digitalizing on system• Training to associates and engineers to use systemCIP ON CURRENT FAULIRES NOV 17-MAR 18• Follow up in continuous improvement projects to achieve objectives such as:o Internal Auditso Documents and evaluation of internal controls.o Project coordination and planning.o 5's of Qualityo Pareto follow up to failure reduction • 7% Failures reduction• Usage of lean manufacturing tools as Problem Solving, SMED, ETC.CYCLE TIME REDUCTION SEP 17-MAR 18• Changeover reduction in 66% from 1:30hrs to 0:30hrs for 11 stations line assembly for fuel system module• 67% reduction in scrap in the audit test assuring the correct usage of resources and components in destructive test (burst test)• Cycle time reduction 32seg to 27seg to achieving an efficiency of 92% in Fuel Level Sensor assembly process line Show less

    • KNIPPING AUTOMOTIVE S.A DE C.V

      Jul 2018 - Apr 2019

      • Responsible for automatic assembly line with 11 robots and union people• Changeover of product on the line with check/adjust robots and actuators electrics/ pneumatics in order, that the product meets the specification.• Problem solving of robot sequence programming and 17% scrap reduction with improvements in welding process.• Reduce cycle time and change over in 28% to assure volume capacity for 5 projects on assembly line• Quality assurance for product release with fill production formats to record values and test the product with gages "go no go"• "Preventive and Corrective" maintenance and purchase of spare parts • Standard work Instruction and supervision of union people Show less Responsibilities:*Understand the assembly line/robots.*Start the assembly line.*Change of product on the line.*Check/adjust robots and actuators electrics/pneumatics.*Adjust process in order, that the product meets thespecification.*Release Assembly line.*Quality communication for product release and in caseof product failures too.*Constant maintenance of the line, "Preventive andCorrective" (Find errors, documentation of these &change of piece in case of failure.)*Lead and Management of resources.*Test the product with gages "go no go", quality checks.*Behavior of the process in the floor, in the part of the improvements in the process for the reduction of the scrap, greater security in the processes and machines, greater productivity and the reduction of costs.*Development and updating of line documentation (Flow diagram, Process instruction sheets, specific requierement of costumers).*Instruction and supervision of operators.*Constant communication to the suppliers.*Support in adjusting the line for new products.*Problem Solving. Show less

      • Mechatronics Engineer

        Jul 2018 - Apr 2019
      • Mechatronics Engineer

        Jul 2018 - Apr 2019
    • DENSO

      May 2019 - now
      Process Engineer - New Projects

      30V retrofit process line Aug 20• Design retrofit process in current assembly line.o Pokayokes improvements.o Sensors improvements.o Jigs design• Milestones assurance for launch during project.• PFMEA and PPAP documentation to assure project timeline.• Support and implementation of engineering changes.SLANT Connector new line design Jun 20• Customer samples prototype A manufacturing.• Design, implementation and validation of new assembly line.• Design and purchase of the manufacturing process machinery.• Milestones assurance for launch during project.• PFMEA and PPAP documentation to assure project timeline.• Support and implementation of engineering changes.HVAC L4 final assembly line release May 19-Oct 20• Project engineer for release new line base on customer requirements and specifications, series cero up to PPAP release• Assure capability machines for get product quality and reliabilityo Setup of vision systems for preassembly and final assemblyo Setup of final test stand (leak test) to assure assembly performanceo Analysis of data to obtain and improve Long Term capability (Cp and Cpk) and principal KPI´s (OEE, IDC, Failures…) for line release• Engineering changes (ECI´s) base on customer requirements improvement on line design´s (Nests, JIG´S, poka-yokes…)• Development of strategies to ensure compliance of OEE (Overall Equipment Efficiency) up to 87%.• Reduction of failures in vision systems from 7.5% to 2.5% to assure the quality in the product reliability, machines capability.• Creation and administration of product document control.• Continuous improvement for quality, design, cycle time and ergonomics standards Show less

  • Licenses & Certifications