Abdul Raqeeb

Abdul Raqeeb

Intern

Followers of Abdul Raqeeb2000 followers
location of Abdul RaqeebHyderabad, Sindh, Pakistan

Connect with Abdul Raqeeb to Send Message

Connect

Connect with Abdul Raqeeb to Send Message

Connect
  • Timeline

  • About me

    Sr. AM | Maintenance & Planning Engineer - Power Cement Limited | Clean Energy Transition | Sustainability | Energy Management | Projects - Cement Plant 7700t/d FLSmidth - RDF Refuse-Derived Fuel |

  • Education

    • Mehran University Public School

      2010 - 2012
      Intermediate Pre-Engineering

      Activities and Societies: Participate In Sports Participate in debate Participate in dramas Participate in Quiz Competition

    • Mehran University Public School Jamshoro

      2008 - 2010
      Matric Computer Science A-1

      Activities and Societies: Participate In Quiz , Debate , Sports and other activities

    • Mehran University of Engineering and Technology

      2017 - 2020
      Masters Electrical Power Engineering 3.72 CGPA

      Nonlinear Controller for Buck Boost Converter for Photovoltaic System

    • Mehran University of Engineering and Technology Jamshoro

      2013 - 2016
      Bachelor of Engineering (B.E.) Electrical Engineering

      Activities and Societies: Participate in Project Competition Participate in Poster Competition Participate in Final Year Project Competition Participate in : 1 - workshop on smart grid and its application 2 - how to develop Communication Skill

  • Experience

    • JPCL Jamshoro

      Jun 2015 - Jul 2015
      Intern
    • OGDCL Official

      Dec 2015 - Dec 2015
      Winter Internship

      Internship ( Duration 7 Days )

    • HESCO ( Project management Unit )

      Jun 2016 - Jul 2016
      Summer Internship
    • Mehran University of Engineering and Technology

      Feb 2017 - Sept 2017
      Intern

      Manage the Chinese language course as the focal person, overseeing admissions, handling financial matters, and organizing class arrangements. Plan and organize meetings efficiently. Review postgraduate theses according to the prescribed structure and submit them to the director. Provide assistance to the director in coordinating seminars

    • Power Cement Ltd

      Sept 2017 - Jan 2021

       Responsible for Safe and smooth Operation of Plant. Supervise and lead a team of electrical and instrumentation technicians. Attending all the abnormalities at plant without the loss of time and coordinating with the maintenance departments of concerned area. Respond promptly to any alarms or issues. Troubleshoot and diagnose electrical and instrumentation problems Document any abnormalities or incidents during the shift. Maintain accurate records of shift activities, including equipment readings, maintenance tasks, and incidents. Carried out routine inspections of all Electrical equipment’s, Local Control room and Substations. Encourage departmental safety activities such as safety sub-committee meeting, Fire Fighting and House Keeping of Area etc. Show less Erection, Installation & Commissioning of New FLSmidth 7700 t/d Cement Plant Project.  Attended training on plant and environmental safety, processes, maintenance strategies, and general management skills. Performed technical study of new plant drawings and wire diagrams. Ensured implementation of electrical framework and earthing during erection activities of the new plant as per standards. Ensured Installation of cable trays as per drawings to have accessibility for maintenance at a later stage and quality of trays to avoid damage of cables. Ensured cable laying was properly done by contractors by performing maggar tests, avoiding joints, and ensuring quality of cables. Maintained record of material used during installation and ensure safekeeping of excess materials for future usage. Inspection of all the newly arrived equipment made sure that all the delivery is as per packing list and raised queries with contractor if any change was detected. Installation of electrical equipment, motors, bag filters in the designated locations and ensured terminations were as per drawings. Installation of Substation - Panel shifting - ABB MV-Panel Installation - ABB LV-Panel Installation - VFDs Installation. Performed cold and hot test before start of commissioning activities. Was involved in commissioning and start-up all electrical part installed at area. Need to ensure 100% safety compliance at designated area. Show less

      • Assistant Manager (Shift In-Charge)

        Nov 2019 - Jan 2021
      • Trainee Enginer - Assistant Manager (Project)

        Sept 2017 - Nov 2019
    • Power Cement Limited

      Jan 2021 - now

       Responsible for smooth and Non-stop operation and equipment's reliability of area Kiln area. Evaluating and allocation of resources (Manpower, machinery & materials). Maintain stock of spare parts & Consumable at optimum level. Planning of Preventive and corrective maintenance of ABB VFDs, MV and LV Motors and Transformer as per OEM Instructions on Daily weekly and Monthly basis. Assist line manager in annual budget preparation. Performed and led maintenance team to carry out maintenance activities reported in CMMS. Need to ensure 100% safety compliance at designated area and conduct tool box talk before start of any job to reduce loss time injury upto 0%. Ensure permit to work system and its content is being adhered by employees or contractors working under control. Maintenance Management and procurement using CMMS Microsoft dynamics 2012 Software. Show less

      • Senior Assistant Manager Planning & Maintenance.

        Jul 2024 - now
      • Assistant Manager E&I ( Planning & Maintenance )

        Jan 2021 - Sept 2024
  • Licenses & Certifications

    • IEEE Workshop

      IEEE